Ritesh Singh

Instrument Supervisor Maintenance at Arabian Industries LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Ash Sharqiyah South, Oman, OM

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Oil and Gas
    • 700 & Above Employee
    • Instrument Supervisor Maintenance
      • Jan 2022 - Present

      Follow the 14 days frozen plan from PDO site.Preparation of material take-off for instrumentation work to PDO Store.Planning and distribution of jobs to technicians for fields relative activities.Calibration, troubleshooting, function check and operation support for all instrument in well head (Beam pump, PCP, Esp.) to manifold to Process facility area.Going to site visit and Examine with Responsible Supervisor from PDO side before apply the permit.We Decided to apply the type of permit (Class A, Class B, Task SOP, no permit Job) with attach the Risk Assessment, Job HSE plan, HRA (Health Risk Assessment), Drawing, and Certificate (If required).Go to side conduct the Tool box talk with our crew member and Verified the TRIC (Tool Box Risk Identification Card).Arrange the tools, Process Calibrator, and Vehicle if Required.In case of emergency hold the permit as a Permit Holder and supervisor the work and location.After complete the shift take the decision, Permit is going to suspend or cancel.Make the progress report and submit the Department head (Engineer).Plan and preparation the yearly function check for well head (Beam pump), PCP (Process compressive pump), ESP (Electrical submersible pump) Plan and preparation for quarterly function check H2s gas detector.Plan and preparation for Monthly function check smoke detector for camp. Main target is successfully finished the work and hand over the entire project documents to client in time limit.

    • Qatar
    • Oil and Gas
    • 700 & Above Employee
    • Instrument Supervisor Commissioning
      • Feb 2020 - Sep 2020

      Performing Instrument Commissioning Supervisor Duties independently with Three team (9 Person) and take care of PTW.Planning and distribution of jobs to technicians for fields relative activities.Preparation of calibration and Loop checking sheets.Involved in Continuity test for Transmitter to Junction Box to Marshaling cabinet to DCS or PLC as a team leader.Review the loop folder and release for loop Checking.Involve in calibration, Loop checking, Trouble Shooting, Cause & Effect, Commissioning and Startup Unit.Involve Function check thru field Instrument and Software.Involve the maintenance for Fin fan with Pet ControllerInvolve in Preventive and Corrective maintenance (A, B, C) of PT, TT, LT, FT and Fisher control valve (DVC 6000, 6010, 6020) and Masoneilan valve positioner and using Test Equipment 475 or TRAX.Fault-finding and Fault analysis of various Instrumentation Systems.Assist on Pre-commissioning & Commissioning of various Instrument Controls.Resolve all plant issues related field Instrument to DCS and PLC.End of shift making the progress report and submitted for team lead.

    • United States
    • Construction
    • 700 & Above Employee
    • Instrument commissioning & Maintenance foreman
      • Apr 2011 - Mar 2017

      Performing Instrument Maintenance and Commissioning ForemanGood command on Compressor (GE MARK VI or VII) or SEIMENS Turbine and Heater Good command for Calibration, Loop-Checking, Trouble-shooting, function Test, Cause & Effect (Interlock and complex loop)Having good Knowledge on testing equipment’s like Fluck, Drug calibrator, Process calibrator Involve day to day plant preventive and Corrective maintenance of Instrument & ValveDuring this Period i have done Shutdowns in LNG Trains as well as Projects & Commissioning.Preventive and corrective maintenance of offshore ship loading facility SPM (Single point Mooring). HPU units, PLEM valves, telemetry system, fog horns associated with SPM.Maintenance of LNG & LPG process trains including BOG Centrifugal Compressors for storage facilitiesTo carry out corrective and preventive Maintenance of all field Transmitter (Honeywell, Endress & Houser) PT/ DPT/ TT/ FT/ LT—DP Type, Displacer Type, Ultrasonic, Radar Type.To carry out the Calibration, Trouble Shooting, Stock check, Partial stock check for all kind of valve and Positioner Fisher (DVC 6000/6010) Masoneilan (FVP 110- F1/f2) (Svi-II) Flowserve (MQ/IQ) and PMV Positioner. Carryout take the necessary Bypass Override Certificate with Proper procedure work on Anti Surge valve (GE/CCC) ESDV (Biffi) on/off valve (Topworks with Proxy Meter).To carry out the calibration, function check and set the H, HH, L, LL Alarm for Switches (Indfose/ GE/ Ashcroft and Delta).Having good knowledge on testing equipment Like Hart 475/ Trax/ Fluck/ Drug calibrator, Process calibrator and multi calibrator.Troubleshooting of Bentley Nevada (Excel, Redial and Key Phasor) for vibration monitoring system and field components, Model-3500.Have ability to read P&I Diagram, Functional logic diagram, Loop diagram, Termination schedule and loop schematic.Attended call out duties for Trouble Shooting an emergency.

    • Senior Instrument Technician
      • May 2009 - Jun 2010

      Performing Senior Instrument TechnicianGood command for Hart and foundation Fieldbus (FF) Protocol.Involve in CSU (Commissioning & Startup Unit)Good command for Calibration, Loop checking, Trouble shooting for Honeywell Smart family Instrument. PT/TT/LT/FT.Having ability to Understanding and command to read P&ID, ILD’S, Hook-up Drawing, Loop drawing as well as startup sequence time. Overhauling, Calibration and Stroke Checks for different types of Control Valves, ON-OFF Valves, Pneumatic & Electronic Positioner.Having good command to found the problem and troubleshooting for valve positioner like a Fisher and Masoneilan.Having good knowledge on Hart 375, Drug calibrator and process calibrator.Performing all the job according to procedure and striction of Supervisor.

    • Instrument Technician
      • Feb 2006 - Feb 2009

      Performing Instrument Technician as a team member.Involve in calibration, loop checking and trouble shootingOverhauling, Calibration and Stroke Checks for different types of Control Valves, ON-OFF Valves, Pneumatic & Electronic Positioner.Overhauling control valves in instrument workshop.Attended Plant Shutdown Work as a Team Leader.Involve in commission and startup the plant.Perform all the job, as advised by Supervisor Performing Instrument Technician as a team member.Involve in calibration, loop checking and trouble shootingOverhauling, Calibration and Stroke Checks for different types of Control Valves, ON-OFF Valves, Pneumatic & Electronic Positioner.Overhauling control valves in instrument workshop.Attended Plant Shutdown Work as a Team Leader.Involve in commission and startup the plant.Perform all the job, as advised by Supervisor

    • India
    • Consumer Services
    • 1 - 100 Employee
    • Instrument Supervisor / Senior Instrument Technician
      • Dec 1998 - Nov 2001

      Performing as a Instrument Supervisor/ Technician.Preparation of material take-off for instrumentation work.Panel Setting of all DCS cabinet.Arrange the tools, Material, Process Calibrator, and Transport if Required.Good command for Calibration, Loop checking, Trouble shooting.Calibration of Gauge (Pressure gauge, Compound gauge and vacuum gauge) with dead wait tester.Calibration of RTD and Thermo couple with Temperature bath.Good command to Continuity test for Transmitter to Junction Box to Marshaling cabinet to DCS or PLC as a team leader.Follow the progress for glanding and termination according to daily plan.Follow the progress for cable tray according to daily plan and according to decided root and standards. Coordinate with punch clearing team about construction punch, Loop check punch and walk-through punch and call weekly meeting with contractor and sub-contractor for punch clearing progress, require material and other punch related issues. Perform all the job, as advised by Engineers and gave daily reports.Handling Construction team as a team leader.

Education

  • Xaviers International University of Goa
    Diploma, Instrumentation Technology/Technician
    2003 - 2005

Community

You need to have a working account to view this content. Click here to join now