Ritesh Kolhapure

Manager Project Engineering at Henkel Adhesives Technologies India Pvt. Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pune, Maharashtra, India, IN
Languages
  • English -
  • Hindi -
  • Marathi -
  • Kannada -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Chemical Manufacturing
    • 500 - 600 Employee
    • Manager Project Engineering
      • Sep 2019 - Present

    • India
    • Chemical Manufacturing
    • 700 & Above Employee
    • Assistant Manager-Projects
      • Apr 2018 - Sep 2019

    • Chemicals
    • 1 - 100 Employee
    • Senior Project Engineer
      • Apr 2017 - Mar 2018

    • Project Engineer
      • Sep 2014 - Apr 2017

      Prime Responsibility:-  Looking After Various Automation Projects.  Technical Approval of Drawings.  Preparing & Validation of BOQ.  Technical approval of vendor bids.  Initiating the Procurement of Material and there follow-ups.  Planning the phase wise project activities.  Working as a project co-ordinator for various projects.  Co-ordinating PHA study for new Projects.  Technical Evaluation of Vendors & contractors. Project at HUNTSMAN: I) Completed new stream installation for Natural Gas Project.  Involved thoroughly in fabrication and erection of structure  Involved in Fabrication & Erection of CS Piping  Daily project activities:- Work planning,scheduling weekly fabrication and erection plans,allotment Work to contractors.  Preparing daily report and planning for project execution and keeping eye watch on project execution & its completion in specified targets  Follow up of timely delivery of equipment, structure and piping material at vendors end. II) Successfully completed Installation & commissioning of Auto-Packaging System Show less

    • India
    • Chemical Manufacturing
    • 700 & Above Employee
    • Mechanical Engineer Projects
      • Mar 2011 - Sep 2014

      Experience at SRF Project Experience: I)  Involved thoroughly in fabrication and erection of structure (1000 MT).  Involved in Fabrication & Erection of CS & SS Piping.  Completed the LTCS Piping for (Chlorine System-5000 “ Dia).  MS Site Fabricated tanks of capacity upto 600KL(12 meter diameter tank).  Fabrication of PP-FRP tanks of capacity 600KL (12 meter diameter).  Daily project activities:- Work planning,scheduling weekly fabrication and erection plans,allotment Work to contractors.  Preparing daily report and planning for project execution and keeping eye watch on project execution & its completion in specified targets  Follow up of timely delivery of equipment, structure and piping material at vendors end.  Carrying out commissioning activities of piping & equipment after installation.  Checking quality of work done by contractors at each end of welding, sand blasting, painting. Also through inspection during erection.  Checking equipment erection by means of leveling, nozzle orientation and other parameters. II)  Successfully erected and commissioned 300 Crore project for dahej site.  Involved thoroughly in fabrication and erection of structure (2000 MT).  Involved in Fabrication & Erection of CS & SS Piping(1.25 lacs Inch dia).  Fabrication of PP-FRP tanks of capacity 600KL (12 meter diameter).  Involved in commissioning activities to smoothly start the production. Maintenence Experience:  Maintenence of Gear Boxes, Pumps & Blowers (Metallic & Non-metallic).  Maintanance of Reactors, Exchangers.  Preventive maintenance of Equipment to keep them healthy.  Iventory & Spare maintaining and planning. Show less

  • Tata Chemicals Ltd.
    • Babrala, Utter Pradesh
    • Assistant Manager
      • Aug 2008 - Mar 2011

      Maintenance Experience:- Planning, commissioning, maintenance, quality check, coordination and other related activities of mechanical works with adherence to time & budgetary parameters for financial year and monitoring of expenditures on Mechanical maintenance of Urea plant.  Experience in Planning & inventory management of material, spares management, requirement of spare required for different type of plants & equipments available at site to avoid major breakdown & stoppage of production.  Accountable for manpower allotment, handling & training for Safe and Environment friendly Working System; coordination among vendors Planning & Quality Controls like Urea Reactors and Urea Titanium strippers and HP Carbamate Condensers; preparation of Bar charts, Procedure cum check lists and resource planning sheets for ATR.  Erection of High pressure Bimetallic stripper of 82 Ton weight vertical Falling film heat exchangers and its piping modification; repairing Tube –Tubesheet Welding repair of High Pressure Carbamanate solution, highly corrosive fluid in nature.  Accountable for rigging plan for erection of structure & equipments and commissioning of Conveyor Belt.  Responsible for preventive and predictive maintenance planning  Accountable for procurement of spares and other general consumable spares, conducting brainstorming and RCA sessions for troubleshooting of abnormal machines  Document preparation for ISO, 5S, TBEM and other statutory compliances.  Identifying root cause of failures and implemented quick breakdown solutions to put the machines back in operation . Project Experience:- √ Involved in Plant Expansion Project as Technical Assistant. √ Handled installation & erection of new Bi-metallic Stripper, Installation of new Belts & Conveyors for bulk material Installation of Belt Conveyor for handling of Urea Packed bags of about 200m length. Erection of Truck Loader for loading of Urea filled Bags in the Truck Show less

Education

  • Govt.College of Engg.Karad.
    Graduation, Mechanical Engineering
    2004 - 2008
  • A.S.C. College,Ichalkaranji
    Higher Secondary Certificate, Higher Secondary Certification(HSC)
    2002 - 2004
  • The Modern High School,Ichalkaranji
    Secondary School Certificate (SSC), Secondary School Certification
    1990 - 2002

Community

You need to have a working account to view this content. Click here to join now