Rishin Manas Das

Senior Manager at NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Baduria, West Bengal, India, IN
Languages
  • English Native or bilingual proficiency
  • Bengali Native or bilingual proficiency
  • Hindi Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Civic and Social Organizations
    • 1 - 100 Employee
    • Senior Manager
      • Aug 2018 - Present

      Working as a Business Development and Marketing Working as a Business Development and Marketing

    • Manager Civil
      • Jan 2018 - Aug 2018

      Working as a design engineer of substation. Working as a design engineer of substation.

    • India
    • Engineering Services
    • 300 - 400 Employee
    • Civil & Structure Design of Thermal Power Plant
      • Dec 2008 - Dec 2017

      Responsibility : Working in Super Critical Thermal Power Plant (BTG & BOP area) and Combine cycle gas power plant. Prepare Technical specification & Design basis report (DBR), Study of soil report. Working with 3D environment & Interference checking in CADMS & Bentley Navigator. Job co-ordination with customer, other disciplines and attending meeting with clients. All site issue attends and resolved. Design as per IS, ACI and AISE code. Project – 2x600MW Khargone super thermal power plant • Connection design of entire project and review of fabrication drawings (Approx. 16000Ton). • Working with Tekla software. • Working as a lead engineer. Project - SABIYA OCGT-2 500MW gas base (Kuwait) • Details engineering of GTG building. • Details engineering of plant drainage system. • Details engineering of pipe rack. • Details design of transformer yard. • Details design of IPBD support structure. Project: NCC Super Critical Thermal Power Project – 2X660MW (Nellore, India) • Details engineering of STG building & Main control room building. • Details engineering of Auxiliary Boiler Foundation. • Design engineering of electro chlorination building, gas cylinder room etc. • Details engineering of BTG area paving & drainage system. • Design of IPBD foundation Project: D B Super Thermal Power Project-2 X 600 MW (Chhattisgarh, India) • Details engineering of STG building & Main control room building. • Details engineering of pipe rack & sleeper rack. • Details engineering of ESP control room, DM plan. Project: GHECO-ONE 600MW Coal-Fired Power Plant (Thailand) • Details engineering of SCR/Ammonia shelter, N2 building, Chlorination building • Details engineering of Pipe rack & sleeper rack (super & sub structure) & Coal Conveyor foundation • Details engineering of GIS supporting structure & foundation Show less

    • Civil & Structure Design of Thermal Power Plant
      • Jan 2007 - Nov 2008

      Responsibility : Responsible for detail engineering and review engineering as per Indian code. Study of Technical Specification, Soil report & design basis report. Job co-ordination with customer and attending meeting with clients. Project: Suratgarh Super Thermal Power Station 1x250 MW Unit-6 (Rajasthan) • Review engineering of ESP Control room building & Fuel oil pump house. • Review engineering of Pipe & Cable rack. • Review engineering of PA Fan, FD Fan, ID Fan. • Review engineering of 500 Ton capacity Concrete Silo. • Review engineering of Switchyard (All equipment- super & sub structures & gantry Tower design). Project: Parichha Thermal Power Station, 2x250 MW Units # 5&6 (Uttar Pradesh) • Details engineering of Fuel oil pump house. • Details engineering of Pipe & Cable rack. • Details engineering of Underground water tank. • Details engineering of Fore bay to cooling tower connecting channel. Project: Rural Electrification Project (Zambezia, Mozambique) • Details engineering of Switchyard (All equipment- super & sub structures & gantry Tower design) and distribution tower Show less

    • Civil Engineering
    • 700 & Above Employee
    • Site engineer
      • Sep 2005 - Dec 2006

      Responsibility : Supervision and execution in aluminium refinery project, progress monitoring, Quality Control, Estimating, Rate analysis, billing and reconciliation of Cement, Steel, Shuttering. Project: 1.44 MM TPY Alumina Refinery Project, Lanjigarh, Orissa • Supervision and execution of CCR & Laboratory Building & Compressor House. • Supervision and execution of Sub – Stations, Switch Gear Building. • Supervision and execution of Hydrate Filtration and Hydrate Classification Unit. • Supervision and execution of Pipe racks foundation. • Reconciliation of steel & cement & extra item rate analysis. Show less

Education

  • Jalpaiguri Govt. Engineering College
    Bachelor of Technology (B.Tech.), Civil Engineer
    2001 - 2005

Community

You need to have a working account to view this content. Click here to join now