Rishabh Sirvaiya

Deputy Manager at Aavantika Gas Limited (A Joint Venture of GAIL & HPCL)
  • Claim this Profile
Contact Information
Location
Dehradun, Uttarakhand, India, IN

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Sanket Erande

Rishabh is a "Technically sound personality".He involves in a handling of "PNG & CNG" operations of Indore GA. He also handled Procurement for CNG as well PNG O&M. His presence were there while commissioning of project P/L.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Energy Production, Distribution & Safety Specialization
    Coursera
    May, 2020
    - Sep, 2024
  • Oil & Gas Industry Operations & Markets
    Coursera
    Feb, 2018
    - Sep, 2024
  • Mechanics of Materials III: Beam Bending
    Coursera
    Jul, 2016
    - Sep, 2024
  • Mechanics of Materials IV: Deflections, Buckling, Combined Loading & Failure Theories
    Coursera
    Jul, 2016
    - Sep, 2024
  • Applications in Engineering Mechanics
    Coursera
    Feb, 2016
    - Sep, 2024
  • Mechanics of Materials II: Thin-Walled Pressure Vessels and Torsion
    Coursera
    Jan, 2016
    - Sep, 2024
  • Mechanics of Materials I: Fundamentals of Stress & Strain and Axial Loading
    Coursera
    Dec, 2015
    - Sep, 2024
  • Computer Science 101
    Stanford University
    Jul, 2014
    - Sep, 2024

Experience

    • Deputy Manager
      • Apr 2022 - Present

    • Operations and Maintenance Engineer
      • Jan 2019 - Mar 2022

      CNG• • 35 No. of OMC operated CNG station maintenance.• Major maintenance & monthly maintenance of 12 Nos. of Compressors.• Monthly Maintenance of 50 Nos. of dispenser.• 42 No. of cascade maintenance on monthly basis.• Forecourt operation of 2 No. of COCO based CNG station.• Material procurement for the maintenance and repair of dispenser and cascade.• Fortnight JTR with the OMC stations.• Managing LCV for 20 No. of daughter stations.• Bill processing for the vendors related to compressor operation & maintenance services, Dispenser maintenance services, Forecourt manpower services, LCV services, cascade procurement, SS valves, tubes & fitting procurement. (Total value of Rs. 80,00,000 per month)• Leakage testing of compressor, dispensers & cascade on monthly basis.• W&M stamping of 50 No. of dispensers on yearly basis.• Yearly Calibration of PG, TG, PT, TT, GD, FD.• PAT of compressors.• Tender Flotation for AMC of dispenser, Procurement of Cascade, AMC of UPS and negotiation with OEM’s for AMC of compressor.PNG• 500 km of MDPE network testing on Quarterly basis.• MDPE Valve chamber maintenance.• Coordination with Indore municipal corporation and various ongoing smart city projects like Amrat jal Yojna, Narmada Water line connection, Rain water harvesting project & drainage line project to avoid the damage of MDPE gas pipeline.• Planning and coordination with the Madhya Pradesh Metro Rail Corporation Ltd. (MPMRCL) for the pilling & soil testing activity, in order to safely protect the Steel gas pipeline.• Rectification of MDPE gas pipeline when damage by HDD or JCB in the typical geographical locations like Culvert, bridges etc.• Gas loss report preparation of all the locations on daily basis.• Calibration of Pressure Transmitter and Temperature Transmitter on daily basis.• Coordination with the MPMRCL and its vendors for the metro projects planning and execution in Indore Show less

    • New Zealand
    • Business Consulting and Services
    • Senior Engineer
      • Jun 2018 - Jan 2019

      Projects:- • 50 kms of MDPE laying, testing & commissioning in the industrial area. • Technical specification of MDPE and GI pipeline laying and materials (Valves, MDPE Pipe, GI Pipe, Isolation ball valve, GAS TAP, Rubber hose, Pressure regulators etc.) • MDPE Pipe raw material testing, inspection and MDPE pipe testing, inspection & witness at vendor site. Projects:- • 50 kms of MDPE laying, testing & commissioning in the industrial area. • Technical specification of MDPE and GI pipeline laying and materials (Valves, MDPE Pipe, GI Pipe, Isolation ball valve, GAS TAP, Rubber hose, Pressure regulators etc.) • MDPE Pipe raw material testing, inspection and MDPE pipe testing, inspection & witness at vendor site.

    • United States
    • Gambling Facilities and Casinos
    • 1 - 100 Employee
    • Graduate Engineer Trainee
      • Jun 2017 - May 2018

      • HOA Agreement with the industrial customer. • Industrial potential survey of MIDC chincholi area (200+industries), Akkalkot area. (600+ industries) I. What kind of technology industry use for the manufacturing or the processing of products? II. Which type of fuel industry use for operating boilers or the processing of products? III. How much quantity of fuel industry consumed on daily basis? IV. Whether there is any chance to convert the industry using other fuel to natural gas? • Tender preparation (Technical part) for MDPE and GI pipeline-laying contract and materials. • Preparation of vendor list for supply of material (PE pipe, valve) etc. • Network design and valve positioning in MIDC industrial area. • Network design and simulation for steady state condition in “Pipeline Studio”. • Pipeline network mapping and customer mapping in “Arc_GIS”. • Recon Survey report review as done by the consultant, site visit and mapping on google earth. • Finalization of route to lay natural gas pipeline in the city. • Submission of CGD Progress Report on Monthly and Quarterly basis to the Head office, which is further submitted to PNGRB. • Weekly MIS preparation of all the CGD dept. and submission to head office. • Daily monitoring of Crude & Fuel Price, Cylinder Price and Air Quality Index of Solapur city. • Daily monitoring and Preparation of PNGRB and MIDC web notification and news. • Analysis of last 13 year pollution data (2003-16) in Solapur city and reduction possible by using CNG. MDPE Pipeline Laying and commissioning. CNG Potential Survey Show less

    • India
    • Higher Education
    • 100 - 200 Employee
    • Student Placement Representative
      • Jul 2013 - May 2017

      My responsibilities includes :- 1. Contact with the companies and commence the Industrial tour. 2. Contact with companies and facilitate internship for students. 3. Contact with the companies HR for the recruitment in campus and managing placement process in campus. My responsibilities includes :- 1. Contact with the companies and commence the Industrial tour. 2. Contact with companies and facilitate internship for students. 3. Contact with the companies HR for the recruitment in campus and managing placement process in campus.

    • China
    • Machinery Manufacturing
    • 100 - 200 Employee
    • Student Internship
      • Aug 2016 - Aug 2016

      To increase the productivity of the machining operations. Dimensional Inspection of Bucket. Wheel Loader Assembly and working. To increase the productivity of the machining operations. Dimensional Inspection of Bucket. Wheel Loader Assembly and working.

    • India
    • Automotive
    • 700 & Above Employee
    • Summer Internship
      • Jul 2016 - Jul 2016

      To reduce the moisture content in the compressed Air line and tools. Types of dehumidifiers used in Industry. To solve the problem of humidity in Method shop (VE industries) air compressor line. Assembly of Heavy , Medium and Light weight trucks. To reduce the moisture content in the compressed Air line and tools. Types of dehumidifiers used in Industry. To solve the problem of humidity in Method shop (VE industries) air compressor line. Assembly of Heavy , Medium and Light weight trucks.

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Summer Internship
      • Jun 2016 - Jul 2016

      To study the process time of tappet cover operation under Engine Assembly. Engine Assembly operations, Engine testing, Gear Assembly operations and testing. Learning the functions involved to each part of Engine. To study the process time of tappet cover operation under Engine Assembly. Engine Assembly operations, Engine testing, Gear Assembly operations and testing. Learning the functions involved to each part of Engine.

Education

  • University of Petroleum and Energy Studies
    Bachelor of Technology (B.Tech.), Mechanical Engineering
    2013 - 2017
  • Indian Institute of Technology (Indian School of Mines), Dhanbad
    Master's degree, Mining and Machinery Enginneering
    2017 - 2019
  • St. Paul Higher Secondary School, Indore
    12th Passed, Physics + Chemistry + Mathematics
    2007 - 2012

Community

You need to have a working account to view this content. Click here to join now