Experience

    • Indonesia
    • Paper and Forest Product Manufacturing
    • 200 - 300 Employee
    • Power and Chemical Recovery Process Engineer
      • Jun 2023 - Present

      Handle operation of 32 MW power plant, 1360 tds/day of chemical recovery boiler and 325 t/h evaporator. Focus on operational cost control and plant efficiency. Provide data analysis and give feedback to superior for operation plan. Handle operation of 32 MW power plant, 1360 tds/day of chemical recovery boiler and 325 t/h evaporator. Focus on operational cost control and plant efficiency. Provide data analysis and give feedback to superior for operation plan.

    • United States
    • Financial Services
    • 1 - 100 Employee
    • Recovery Boiler Process Engineer
      • Dec 2022 - Jun 2023

      Operate 5 unit of RB with total 22.700 tds/day capacity. Analyze and troubleshooting in RB daily operation, ensure RB still on variable operation and achieve production target.Responsible for interlocking test before boiler start up, creating SOP, provide job safety analysis. Check and control of mill odorous gas and boiler emission (CEMS) relate to environmental regulation.

    • Power Process Enginner
      • Jun 2021 - Nov 2022

      Lead Power side shift operation of 450 MW power plant with total 830 kg/s steam flow from power boiler and recovery boiler. Control and ensure safe and efficient operation to achieve quality and quantity, meet the management target. Responsible for manage steam & power balance, solid fuel management and water – condensate recoveryHave role in early join for sharing knowledge and operational benchmark between RAPP to sister company, Toba Pulp Lestari

    • Process Engineer
      • Jun 2018 - May 2021

      Handle operation of Recovery Boiler with 1360 TDS/day and BL Evaporator with 325 t/h evaporation rate. Make daily report of target and production for each plant and operational maintenance report in Liquor Site.Collect data and analyze abnormality found in day-to-day operation and solving the root causePrepare shut down job list and timeline for process job

    • Commissioning Engineer
      • Nov 2018 - Jun 2019

      Involve in pulp mill up grade project especially in Recovery Boiler, Evaporator and new system of NCG treatment.• Commissioning team for Evaporator plant upgrade from 230 t/h to 325 t/h capacity• Factory Acceptance Testing (FAT) and as commissioning team for mill wide NCG System & Methanol Plant• Commissioning team for Ash Leaching Project.

    • Shift Leader Energy Department
      • Jun 2017 - May 2018

      Handle shift operation of 1360 TDS/day Recovery boiler, 325 t/h Evaporator and 31 MW power plant with with 1 unit power boiler with 100 t/h steam flow.

    • Graduate Trainee RB & Evaporator
      • Jun 2016 - May 2017

Education

  • Universitas Pembangunan Nasional Veteran Yogyakarta
    Bachelor's degree, Chemical Engineering
    2010 - 2014

Community

You need to have a working account to view this content. Click here to join now