Ricky Yun

Wastewater Operator at CORDE Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
NZ

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Industrial Engineer Water Pollution Environmental
    Human Resources Development Service of Korea
    Oct, 2010
    - Nov, 2024

Experience

    • New Zealand
    • Construction
    • 1 - 100 Employee
    • Wastewater Operator
      • Nov 2021 - Present

      Maintaining and inspecting Wastewater treatment plants, Sewer pump stations and Wastewater network stuffs, including repair and problem solving. Maintaining and inspecting Wastewater treatment plants, Sewer pump stations and Wastewater network stuffs, including repair and problem solving.

    • Facilities Services
    • 1 - 100 Employee
    • Wastewater Technician
      • Jun 2021 - Nov 2021

      Regular service maintenance of Wastewater systems, including repair and problem solving. Regular service maintenance of Wastewater systems, including repair and problem solving.

  • CHEONGSOO E&S
    • 대한민국 서울
    • Wastewater Treatment Technician
      • Jun 2014 - Sep 2017

      Maintaining and servicing Wastewater Treatment plants, and providing advice to customers on how to improve the quality of water assuring optimal standards of their wastewater plants. Maintaining and servicing Wastewater Treatment plants, and providing advice to customers on how to improve the quality of water assuring optimal standards of their wastewater plants.

  • SANROK ETC
    • 대한민국 서울
    • Wastewater Treatment Technician
      • Oct 2012 - Jun 2014

      Participating in a commissioning project to assure that the terminal Wastewater Treatment plant(MBR, 30,000 tons/day) built by GS E&C followed the requirements of the Incheon Council. Participating in a commissioning project to assure that the terminal Wastewater Treatment plant(MBR, 30,000 tons/day) built by GS E&C followed the requirements of the Incheon Council.

  • DAEHAN ENG&OPHIR E&C
    • 대한민국 부산
    • WasteWater Treatment Operator
      • Feb 2008 - Dec 2010

      Participating in a project led by Kori Nuclear Power plant, in charge of the operations at Wastewater Treatment Plants such as MBR, SBR, A/O, A2/O Participating in a project led by Kori Nuclear Power plant, in charge of the operations at Wastewater Treatment Plants such as MBR, SBR, A/O, A2/O

Education

  • Dongseo University
    Bachelor of Engineering - BE, Environmental Engineering
    2002 - 2008
  • UUNZ
    Postgraduate - Level 8, Certificate in Business
    2018 - 2019

Community

You need to have a working account to view this content. Click here to join now