Ricky Vasquez

Project Engineer at J.F. Shea Construction
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 100 - 200 Employee
    • Project Engineer
      • Jul 2016 - Present

      Underground Structures Concrete Project Engineer Walsh/Shea Corridor Constructors Joint Venture. Crenshaw/LAX Construction Corridor Project for the Los Angeles County Metropolitan Transportation Authority (Metro). -The project will provide a new light rail line will serve the great Los Angeles Area. Project includes eight new stations running through the Crenshaw Corridor, Inglewood, Westchester and the LAX area.8.5 mile extension consisting of at grade, below grade, and aerial sections.

  • Ford Engineering and Construction Inc.
    • Greater Los Angeles Area (Playa Del Rey)
    • Project Engineer
      • Aug 2015 - Jul 2016

      Field Engineer for two projects at Hyperion Treatment Plant for the City of Los Angeles 1. CIP # 2402 HTP Truck Loading Facility Odor Control Modernization Scope of Project: Demolish, backfill and convert existing Digester 6C to an equipment pad. Install two new 2-stage chemical scrubbers, fans, recirculation pumps and a new chemical storage facility. 2. CIP # 2422 HTP Secondary Clarifiers Upgrade Scope of Project: Rehabilitate the structural components that are experiencing severe corrosion, at sixteen (four modules, modules 6-9) out of the thirty-six Secondary Clarifiers at HTP.. Replace the main drive motor, and the rotating weir and its associated system

Education

  • California State University-Long Beach
    Bachelor of Science (BS), Business Finance
    2011 - 2014

Community

You need to have a working account to view this content. Click here to join now