Ricky Kurniawan

Senior Architect/ BIM Architect - Construction of Jakarta Mass Rapid Transit Phase 2 Project CP203 at CECI Engineering Consultants, Inc. Taiwan (台灣世曦工程顧問股份有限公司)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
ID
Languages
  • English Professional working proficiency
  • Chinese Elementary proficiency
  • Bahasa Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Senior Architect/ BIM Architect - Construction of Jakarta Mass Rapid Transit Phase 2 Project CP203
      • Feb 2020 - Present

      MRT Phase 2A project is started from existing Bundaran HI Station to Kota Station with track as long as 6 kilometers in total. It consists of 7 underground stations; Thamrin Station, Monas Station, Harmoni Station, Sawah Besar Station, Mangga Besar Station, Glodok Station, and Kota Tua Station. CP203 Project : Two Underground Station (Glodok and Kota Station) and Tunnel between Stations MRT Phase 2A project is started from existing Bundaran HI Station to Kota Station with track as long as 6 kilometers in total. It consists of 7 underground stations; Thamrin Station, Monas Station, Harmoni Station, Sawah Besar Station, Mangga Besar Station, Glodok Station, and Kota Tua Station. CP203 Project : Two Underground Station (Glodok and Kota Station) and Tunnel between Stations

    • Director/ Principal Architect
      • Mar 2018 - Present

      OMAH Atelier Design Consultants is an architectural and planning firm dedicated to providing creative and effective solutions in the design and planning of human environments. OMAH Atelier Design Consultants is an architectural and planning firm dedicated to providing creative and effective solutions in the design and planning of human environments.

    • BIM Engineer Team - DDC7 (CNS Team) - THE MRT SUNGAI BULOH-SERDANG-PUTRAJAYA LINE
      • Nov 2016 - Feb 2018

      The Klang Valley Mass Rapid Transit (KVMRT) Project involves the construction of a rail-based public transport network comprising three lines.MRT, together with the existing urban rail network, will form the backbone of the public transport system in the Greater Kuala Lumpur/Klang Valley region.Responsible (Job Detail):DDC7 BIM (Building Information Modeling) Team (CNS/ Structure)Study and develop structure design layout by using Revit and Naviswork (Autodesk)Do regular clash detection between CNS (DDC7, CNS Team) with Architecture Team, Tunnel Team, and Mechanical Electrical Team by using Naviswork (Autodesk) as the requirement from our client to avoid any mistakes from the design phase. (Virtual Design Review Meeting, bi-weekly)Pointed as BIM Coordinator to handle BIM VDR Issues.This project mostly uses BIM and Project Wise (Bentley) as the main tools based on the client requirement. Show less

    • Architect/ BIM Engineer - A14 Station – Taoyuan Airport MRT Station
      • Jun 2016 - Feb 2018

      “ This station is a part of Taoyuan International Airport (New Terminal 3 Project).It’s located in Basement 2 (Concourse Level and MRT Ticketing), and Basement 3 (Platform Level). A14 station is built to accommodate the transportation system inside the airport”Responsible (Job Detail):Architecture Design team/ BIM EngineerDesign Team Member to develop station layout to accommodate MRT passengers from Taoyuan International Airport (Especially for Terminal 3)This project mostly use BIM as the main tools to have easy coordination with the Terminal 3 Design Team Show less

    • Architect/ BIM Engineer - Construction of Jakarta Mass Rapid Transit Project
      • Apr 2014 - Feb 2018

      Construction of Jakarta Mass Rapid Transit Project Underground Section CP106 in IndonesiaThe first MRT in Indonesia, and also the first Underground transportation in IndonesiaLocation : Jakarta, IndonesiaOwner : MRT Jakarta/ SMCC HK JOCP106 Project : Two Underground Station and Tunnel between Stations“The total length of tunnel is 1.37 km. In the same construction package, it has 3- level underground station and 2- level underground station."Year of Completion : 2019Design Consultant : CECI Engineering Consultant, Inc., TaiwanResponsible (Job Detail):Architecture Design teamDevelop and study layout design of Bundaran HI and Dukuh Atas Station (CP106)Develop and study Entrance Design of Bundaran HI and Dukuh Atas Station (CP106)Prepare detail drawing for Bundaran HI and Dukuh Atas Station (CP106)BIM (Building Information Modelling) TeamImprove design layout by using REVIT and NAVISWORK (AUTODESK)Do regular clash detection by using NAVISWORK (AUTODESK) to minimize the potential error in the construction phase.Develop the model by doing the overlay design (overlay all of the BIM Product team and try to minimize the potential conflict in internal drawing (Architecture, MEP, Structure, and Lighting)).Example: Pipe Checking, Equipment Checking, etc. Show less

    • Architect/ BIM Engineer - Design of New Taiwan Post Office Project (Taipei)
      • Feb 2017 - Dec 2017

      As a design collaboration with Mechanical Department of CECI Engineering Consultants, Inc., Taiwan. To provide architecture design to enhance the space on New Taipei Post Office Project."Taiwan post office want to develop new office at Taipei City to accommodate the effect of the increase of daily needs that always increase all the time"Responsible (Job Detail):Main ArchitectDevelop Layout design of Taipei Post Office ProjectCoordinate with Mechanical Department to have better understanding about mechanical Machine requirement that need to accommodate inside of the buildingPrepare submission design Show less

    • Architect/ BIM Engineer - Taipei Metro Circular Line
      • May 2016 - Dec 2016

      The Taipei Metro Circular Line (Chinese: 環狀線) is an elevated, medium-capacity rapid transit in Taipei and New Taipei City, Taiwan. It is currently under construction with the first section scheduled to open in June 2018. Stage I construction consists of the section from New Taipei Industrial Park to Dapinglin on the Xindian Line and will be about 15.4 km (9.6 mi) long with 14 stations.Responsible (Job Detail):Architecture Design TeamAs a design team to develop Y29 MRT underground Station at Jiannan Street (Neihu District) for Basic Design.This project mostly use BIM as the main tools based on the client requirement. Show less

    • Architect - Basic Design of China Sonangol (Indonesia Satu Building) MRT Entrance
      • Aug 2015 - Nov 2015

      as part of Bundaran HI join development with Construction of Jakarta Mass Rapid Transit Project Underground Section CP106 in Indonesia."China Sonangol building (better known as Indonesia Satu Building) in Thamrin Area has adjacent area with Jakarta Mass Rapid Transit Project Underground Section CP106. Furthermore, China Sonangol and MRT Jakarta want to have Join Operation (and construction) between commercial area and mass public transportation to maximize the benefit between two parties and show this case as an example for other join operation projects."Responsible (Job Detail):Main Architect (for this project)Develop and study entrance design of China Sonangol (Indonesia Satu Building) as par of Bundaran HI station Join Development Project.Coordinate with China Sonangol Architect Team (Jakarta and Singapore) about clash and design coordination between two teams.Prepare basic design drawing for MRT Jakarta/ JMCMC Submission Show less

    • Taiwan
    • Research Services
    • 700 & Above Employee
    • Research Assistant
      • Feb 2012 - Apr 2014

      Sustainable Building Analysis Sustainable Building Analysis

  • Architecture Office Surabaya
    • Surabaya Area, East Java, Indonesia
    • Junior Architect (Part time)
      • Jun 2010 - Aug 2010

Education

  • National Taiwan University of Science and Technology
    Master's Degree, Sustainable Design, Green Building
    2012 - 2014
  • Universitas Kristen Petra
    Bachelor's Degree, Architecture
    2007 - 2012

Community

You need to have a working account to view this content. Click here to join now