Ricky Burkhart

Superintendent at RailWorks Corporation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Washington DC-Baltimore Area

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 500 - 600 Employee
    • Superintendent
      • Mar 2020 - Present

    • United States
    • Construction
    • 1 - 100 Employee
    • Foreman
      • Oct 2017 - Mar 2020

      WMATA - Track maintenance including DF fastener, plinth, and 3rd rail replacements including place and finish the concrete. Eastern Shore – Operate tie gang equipment MTA – Fastener replacement supporting a double crossover and repairing switch machine mounts. Charlotte, NC – Construction of new streetcar system including materials management, movement of rail, track construction and rail boot installation ahead of concrete pours. WMATA - Track maintenance including DF fastener, plinth, and 3rd rail replacements including place and finish the concrete. Eastern Shore – Operate tie gang equipment MTA – Fastener replacement supporting a double crossover and repairing switch machine mounts. Charlotte, NC – Construction of new streetcar system including materials management, movement of rail, track construction and rail boot installation ahead of concrete pours.

    • Foreman
      • Mar 2006 - Jul 2017

      Worked on numerous projects with the company. Stretching from Philadelphia, Pennsylvania to Tucson Arizona. Ranging from Automated People Movers, Direct Fixation with various transit authorities, to the extension in Gavin Yard, for BNSF in Minot, North Dakota. All Aboard Florida Miami Station – Responsible for construction of the direct fixation trackwork on the elevated guideway at the Miami station. Work included planning the work, coordinating crane hoisting to deliver all rail and materials to the elevated guideway, placement of all formwork for DF track construction, and adjustment of rail and fastener templates prior to concrete pours. Dulles International Airport APM (tunnel) – Responsible for construction of switches. Installation of mobile and fixed blades. Installation and setting of switch machine. Adjusting switch throw. Placing of emergency walk way panels. Philadelphia Market Street Outages – Responsible for installing third rail, as well as line and gauge of track Miami International Airport, North Terminal Project (APM) – Responsible for installation of switch layouts, switch machines, installation of fixed blades, switch machine. Installing guide rail. Miami Airport Intermodal Connector (APM) – Responsible for all switch layout and installation. Miami Red Line Extension (Direct Fixation Track Work) – Responsible for third rail installation, plinth concrete pours, as well as rail line and gauge. Dallas Area Rapid Transit, Blue Line Extension (ballasted track) – Responsible for distribution of ballast throughout the project and distressing of rail. Tucson Modern Street Car (trolley system) – Responsible of logistics. Accepting materials as well as distribution of materials throughout project for work crews. Philadelphia Delair Bridge (open deck track bridge) – Gavin Yard, Minot N.D. (ballasted track) – East Fairview Montana, NorthStar Yard Installation (ballasted track) – Responsible for ballast distribution and maintenance. Show less

Education

  • Minooka Community High School
    12

Community

You need to have a working account to view this content. Click here to join now