Rick Saxton

Incoming, and Final Inspector at Swiger Coil, a Wabtec Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Electrical/Electronic Manufacturing
    • 1 - 100 Employee
    • Incoming, and Final Inspector
      • May 2018 - Present

      Rotating shift ,12 hours ,continuous operations of various kilns including rolling tunnel kilns. Taking readings hourly, and stabilizing any alarms. Rotating shift ,12 hours ,continuous operations of various kilns including rolling tunnel kilns. Taking readings hourly, and stabilizing any alarms.

    • United States
    • Glass, Ceramics and Concrete Manufacturing
    • 1 - 100 Employee
    • Quality Inspector
      • 2010 - 2012

      All outgoing product being made is checked for discrimination before shipment. visual defects, and inspections using various instruments and calbrating. All outgoing product being made is checked for discrimination before shipment. visual defects, and inspections using various instruments and calbrating.

    • United States
    • Machinery Manufacturing
    • 700 & Above Employee
    • Production Operator
      • 1987 - 2000

      Cast Iron motor Savage press operator.All sizes of electric motors I had pressed into their frames, measured, checked for any defects, welded motor into frames. Mig Welder Built various wire feeders from blue prints, using many different prints to build the sub assemblies, wiring diagrams, at the completion of the build I test by operation the wire feeders by welding to find any defects. Cast Iron motor Savage press operator.All sizes of electric motors I had pressed into their frames, measured, checked for any defects, welded motor into frames. Mig Welder Built various wire feeders from blue prints, using many different prints to build the sub assemblies, wiring diagrams, at the completion of the build I test by operation the wire feeders by welding to find any defects.

Education

  • Keiser University-Ft Lauderdale
    Associate's degree, Homeland Security
    2012 - 2014

Community

You need to have a working account to view this content. Click here to join now