Rick Greeley, P.E.

Project Engineer at CMT Technical Services
  • Claim this Profile
Contact Information
Location
Silverthorne, Colorado, United States, US
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • EI
    NCEES

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • Jan 2023 - Present
    • United States
    • Construction
    • 1 - 100 Employee
    • Staff Engineer
      • Jan 2022 - Jul 2023
    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Staff Engineer
      • Jul 2020 - Dec 2021

    • Field Engineer
      • Jun 2017 - Jul 2020

    • United States
    • Higher Education
    • 700 & Above Employee
    • Student Lab Assistant
      • Aug 2012 - Dec 2016

      Ensuring that the lab is kept clean and well-maintained; working for the lab manager and completing work priorities in a timely manner; moving heavy equipment, materials, and tools according to need and schedule; troubleshooting and fixing thermal couples; miscellaneous jobs including hanging white boards, fixing desks, painting walls, and some computer work. Ensuring that the lab is kept clean and well-maintained; working for the lab manager and completing work priorities in a timely manner; moving heavy equipment, materials, and tools according to need and schedule; troubleshooting and fixing thermal couples; miscellaneous jobs including hanging white boards, fixing desks, painting walls, and some computer work.

    • Construction
    • 1 - 100 Employee
    • Crew Member
      • May 2016 - Aug 2016

      • Operated equipment such as forklifts and CAT and GEHL skid steer loaders. • Directed the layout of playground structures to certify all safety measures were met. • Constructed playground equipment in accordance with detailed plans. • Set forms, poured concrete and completed finish work for footings, pads and sidewalks. • Operated equipment such as forklifts and CAT and GEHL skid steer loaders. • Directed the layout of playground structures to certify all safety measures were met. • Constructed playground equipment in accordance with detailed plans. • Set forms, poured concrete and completed finish work for footings, pads and sidewalks.

    • United Kingdom
    • Real Estate
    • Engineering Technician
      • May 2015 - Jan 2016

      • Construction oversight, including a daily log of work performed accompanied by picture representation. • Surveying work involving setting up the backsight and taking spot shots. • Performed bank inspections on residential homes • Drafting with AutoCAD, editing site plans. • Completed engineer’s opinion of cost and observing the contractor bidding process. • Construction oversight, including a daily log of work performed accompanied by picture representation. • Surveying work involving setting up the backsight and taking spot shots. • Performed bank inspections on residential homes • Drafting with AutoCAD, editing site plans. • Completed engineer’s opinion of cost and observing the contractor bidding process.

    • Switzerland
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Manufacturing Engineering Intern
      • May 2014 - Aug 2014

      Worked on a gap analysis project; overlapped maintenance plans to confirm no errors were present; updated plans with all mistakes fixed; followed many safety regulations; observed engineers work in the field. Worked on a gap analysis project; overlapped maintenance plans to confirm no errors were present; updated plans with all mistakes fixed; followed many safety regulations; observed engineers work in the field.

Education

  • Colorado State University
    Bachelor's Degree, Civil Engineering
    2012 - 2016

Community

You need to have a working account to view this content. Click here to join now