Rick Andrews
Packaging / facilities technician / Parts room management at Sagent Pharmaceuticals- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
FANUC ROBOT MASTER PROGRAMMING AND TEACH PENDANT OPERATION
FANUC America CorporationMar, 2022- Nov, 2024
Experience
-
Sagent Pharmaceuticals
-
United States
-
Pharmaceutical Manufacturing
-
100 - 200 Employee
-
Packaging / facilities technician / Parts room management
-
Aug 2022 - Present
-
-
Packaging / facilities technician
-
Aug 2020 - Oct 2022
Start up of packaging line with multi pack machine. modify to accommodate several size glass vials. Assigned to assist parts room and add needed parts to assist production. Assigned to water room , assist with WFI process . boilers maintenance and RO process. certified fork truck, boom lift trainer for facility. monitor BMS and respond accordingly . FANUC ACADEMYHandling tool operations and programming completed 32 HR training class with certificate. 3/21/22-3/25/22
-
-
-
Refresco
-
Netherlands
-
Food and Beverage Services
-
700 & Above Employee
-
Maintenance Technician
-
Jun 2019 - Aug 2020
shift lead, maintenance of Can and bottle filling equipment, bevcorp fillers , KHS, Krones and Jones packing equipment. TCI palletizers. preform PMs and associated repairs to maintain constant production. shift lead, maintenance of Can and bottle filling equipment, bevcorp fillers , KHS, Krones and Jones packing equipment. TCI palletizers. preform PMs and associated repairs to maintain constant production.
-
-
-
-
Senior facilities tech.
-
Jan 2008 - Jun 2019
*Senior tech* 3 Years vial packaging , process lead.* 2 Year project PDS 290 FLEX TOUCH , creating MWDs, SOPs.* 5 years Facilities maintenance. * Lead in a 3 phase up grade project . Boiler Up Grade. Wfi Up Grade. Chiller Up Grade. * cLEAN 2 star project. Process Improvement Methodologies, Root Cause Analysis (RCA), Reliability Centered Maintenance (RCM); Pharmaceutical Utilities, BMS. Certified shop floor trainer.All while maintaining FDA compliance. *Senior tech* 3 Years vial packaging , process lead.* 2 Year project PDS 290 FLEX TOUCH , creating MWDs, SOPs.* 5 years Facilities maintenance. * Lead in a 3 phase up grade project . Boiler Up Grade. Wfi Up Grade. Chiller Up Grade. * cLEAN 2 star project. Process Improvement Methodologies, Root Cause Analysis (RCA), Reliability Centered Maintenance (RCM); Pharmaceutical Utilities, BMS. Certified shop floor trainer.All while maintaining FDA compliance.
-
-
-
Hospira
-
United States
-
Pharmaceutical Manufacturing
-
700 & Above Employee
-
Maintenance Technician
-
Jun 2006 - Jan 2008
Maintenance of all production equipment including formulation, filling and packaging of solution and suspension based drugs. Electrical trouble shooting of motors and controlls, chiller, mixing tanks, wifi systems, boilers, steam generators, process equipmentand Sterilization equipment. Following SOPs to ensure GMP is maintained. Ordering needed parts to ensure equipment up time is maintained. Maintenance of all production equipment including formulation, filling and packaging of solution and suspension based drugs. Electrical trouble shooting of motors and controlls, chiller, mixing tanks, wifi systems, boilers, steam generators, process equipmentand Sterilization equipment. Following SOPs to ensure GMP is maintained. Ordering needed parts to ensure equipment up time is maintained.
-
-
-
Nomaco
-
Plastics Manufacturing
-
1 - 100 Employee
-
Maintenance Technician
-
Jun 2004 - Feb 2006
PLANT STARTUP.Rubber pipe and flat insulation process.Equipment install and startup of rubber extrusion process and support machinery.Install main wiring from switchgear to equipment, wiring of control cabinets and safety circuits.Fabricate handling equipment such as ramps, ¼ steel plate floors and rolling racks to hold products.Install equipment, extruders, conveyer chillers, cutting units and 100 ft oil heated oven to cure product. Cutters, Palletizers and boxed product wrappers. Box erecting machines. Install 100 ton chiller for chilled water for process.Startup of process and certify operation for certificate of operation on assigned date.
-
-
-
-
Maintenance Manager
-
Jul 1997 - May 2004
Screen print and embroidery facilityInstall, upgrade equipment for constant production, M&R screen printing presses, IR flash dryers and dryer ovens, packaging equipment for T shirt and hoodies. Brother embroidery machines for shirt and hats. 2, 12head and 2, 6 head 9 color machines. Facilities upgrades as needed, new wiring and lights, wall exhaust fans. Rearrange, move departments as need for expansion. Working overtime during colligate tournaments and special occasions as needed.Attended school at M&H screen print in Chicago and Brother Embroidery in Greensboro for troubleshooting and repair.
-
-