Richard Schroth
Project Manager at HanRoy- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Spanish Limited working proficiency
Topline Score
Bio
Experience
-
HanRoy
-
Australia
-
Mining
-
1 - 100 Employee
-
Project Manager
-
Aug 2021 - Present
Mulga Downs - 20mtpa Mine Development Extended Pre Feasibility Study Non Process Infrastructure Manager 1000pax camp WTP/WWTP Dewatering Netwrok infrastructure NPI - Mining Services Area and Processing Sercices Area, supporting Rail NPI Bulk Fuel unloading facilities Laboratory Hardey - 10mtpa Mine Development Bankable Feasibility Study Infrastructure Lead 480 Man Camp MSA and NPI Facilities Road Haulage Facilities Major Bulk Earthworks McPhee Creek - 10mtpa Mine Development Feasibility Study Infrastructure Lead 220 Man Camp, WWTP, WTP, NPI, Civil Works, MSA Show less
-
-
-
Lendlease
-
Australia
-
Real Estate
-
700 & Above Employee
-
Construction Manager
-
Aug 2020 - Aug 2021
-
-
-
Abra Mining Pty Limited
-
Australia
-
Mining
-
1 - 100 Employee
-
Senior Project Engineer
-
Dec 2019 - Aug 2020
TSF and Aerodrome Mine Village for 280 People All non process infrastructure Fuel Storage Facility TSF and Aerodrome Mine Village for 280 People All non process infrastructure Fuel Storage Facility
-
-
-
Lendlease
-
Australia
-
Real Estate
-
700 & Above Employee
-
Senior Project Engineer
-
Apr 2016 - Dec 2019
Campbell Barracks Redevelopment Curtin University - School of Design and Built Environment Campbell Barracks Redevelopment Curtin University - School of Design and Built Environment
-
-
-
SRG Global
-
Australia
-
Construction
-
700 & Above Employee
-
Project Manager
-
Feb 2013 - Apr 2016
Telfer TSF Construct Only Eric Singleton Bird Sanctuary Redevelopment Saracen Gold TSF Construct Only Varanus Island Compression Plant Project Telfer TSF Construct Only Eric Singleton Bird Sanctuary Redevelopment Saracen Gold TSF Construct Only Varanus Island Compression Plant Project
-
-
-
Downer
-
Australia
-
Civil Engineering
-
700 & Above Employee
-
Project Engineer
-
Apr 2011 - May 2012
Perth City Link – Perth City $14m. Project duration: April 2011 – December 2011 Perth City Link Stage One was the first works of the sinking of the rail project for connecting Northbridge with the city. The scope of the works were service relocation and installation of high pressure water, high pressure gas, electricity, sewer and stormwater, paving and re routing the bus line to allow works to continue, underground sewer bore under the existing rail system, all paving and finishing’s. Richard’s involvement as a project engineer involved client progress reporting, local government interface management, tendering, sub contractor procurement and management, site safety management and reporting, budget control and progress reporting to the project manager. Due to the location of this project it required multiple design changes, construction management with an additional interface with the general public in the heart of Perth. The location and nature of the project required rapid problem solving and re design of constructability for sub contractors, which Richard was responsible for. Richard reported directly to the project manager on this project. Show less
-
-
-
Brierty
-
Australia
-
Construction
-
1 - 100 Employee
-
Site Engineer
-
Jan 2010 - Apr 2011
Mount Gibson Haul Road – Perenjori $18.6mM Project duration: May 2010 – February 2011 85km Haul Road at MRWA specification quad haulage route. Concrete culverts (RCP & RCBC), 22 levees & offshoot drains. Role: Site Engineer Responsibilities: Stormwater Drainage package, Seal package, Signage Package, Quality Control, Variation Costing, Project Progress Reporting, Budget and Programme control, Job cost coding, Procurement, Producing CV and monthly reports, Client Reporting, Subcontract agreement and subcontract control. Great Eastern Highway Upgrade – Kellerberrin $12m. Project duration: October 2009 – July 2010 10k Highway widening and reseal MRWA specification Car park, footpath, floodway (ICP), stormwater (RCP), Service relocation, Town Interface Role: Site Engineer Responsibilities: Stormwater Drainage package, Seal package, Signage Package, Quality Control, Procurement, Project Progress Reporting, Budget and Programme control and Job cost coding Show less
-
-
-
-
Supervisor - Project Manager
-
Mar 2009 - Nov 2009
Supervisor/ Project Manager Responsibilities included organising plant to site, supervision of plant operations, bench cutting and levelling and assisting in tendering. Richard gained experience through working on such projects as Dandenong Market, Sunshine P-6, Mernda Villages, Sacred Hearts Girls in Altona and Kew Cottages. Supervisor/ Project Manager Responsibilities included organising plant to site, supervision of plant operations, bench cutting and levelling and assisting in tendering. Richard gained experience through working on such projects as Dandenong Market, Sunshine P-6, Mernda Villages, Sacred Hearts Girls in Altona and Kew Cottages.
-
-
-
VDM
-
Australia
-
Construction
-
100 - 200 Employee
-
Student Engineer
-
2007 - 2009
-
-
-
Tract Consultants
-
Australia
-
Architecture and Planning
-
100 - 200 Employee
-
Technical Assistant
-
2004 - 2007
-
-
Education
-
RMIT University
Bachelor of Civil and Infrastructural Engineering, Civil Engineering