Richard Salidaga,AScT
AMO TECHNICIAN (SCA HOLDER #26) at International Water-Guard Industries Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Applied Science Technologist - Electrical (AScT)
ASTTBC Technology Professionals -
Registered Electrical Engineering
Professional Regulation Commission
Experience
-
International Water-Guard Industries Inc.
-
Canada
-
Airlines and Aviation
-
1 - 100 Employee
-
AMO TECHNICIAN (SCA HOLDER #26)
-
May 2017 - Present
• Completing the maintenance as per the approved procedures and data using the correct tools and equipment.• Completing the full assessment and advising Customer Support of the findings.• Documenting all activities so as to maintain clear status of the work including updating SARA(database).• Following the AMO processes and practices as explained in the Maintenance Policy Manual.• SCA Holder to review all paperwork to ensure accuracy and completing prior to issuance of arelease certificate.• Maintaining accurate and legible records of work completed.• Ensuring attention to priorities as assigned by PRM. Show less
-
-
QUALITY TECHNICIAN (Certifying Authority # 17 and Bombardier Authorized Category 8 Inspector)
-
Sep 2011 - Present
Completing First Article Inspections (FA) and conformance inspections as required.• Issuing NCRs for non-conforming products received from Suppliers as well as on theproduction floor.• Maintaining the Non-Conforming Product holding area and ensuring timely follow through onMaterial Review Board (MRB) dispositions.• Maintaining and updating the testing and measuring equipment maintenance and calibrationregister.• Coordinating activities to ensure testing and measuring equipment calibration schedules aremaintained and achieved.• Assisting with internal and external audits.• Initiated/Created a Procedure QC-001700-002 for Cosmetic and Workmanship Standard• Initiated/Created a Procedure QC-001700-003 for Zero Defect Sampling Plan for IncomingInspection• Initiated/Created a Flowchart FD-001700-001 for Process Flow for Rework at IWG Costunder NCR• Initiated/Created a Flowchart FD-001700-002 for Process Flow for Qualification Build• Initiated/Created a Flowchart FD-001700-003 for Process Flow for Failed PCBA Show less
-
-
-
Honeywell
-
United States
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Quality Technician
-
Jun 2011 - Aug 2011
• In-charge of standardization of work instruction. • Performed functional and calibration of heads assembly/sensors/calipers. • Established kaizen for assemblies, testing and issue defect tracking for non- conformance. • In-charge of standardization of work instruction. • Performed functional and calibration of heads assembly/sensors/calipers. • Established kaizen for assemblies, testing and issue defect tracking for non- conformance.
-
-
-
Alpha Technologies
-
United States
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Quality Technician
-
Jul 2009 - Apr 2011
• Containment & identification of defective parts, products and assemblies * Quality Alerts for Production Floor * Coordinate Corrective Action Activities - identify, coordinate, monitor, verify, close * Root Cause Analysis * Vendor Audits - monitor defect rates/inspection effectiveness * Inspection implementation at vendor * Identify & Implement opportunities to reduce waste & improve product performance through error proofing • Containment & identification of defective parts, products and assemblies * Quality Alerts for Production Floor * Coordinate Corrective Action Activities - identify, coordinate, monitor, verify, close * Root Cause Analysis * Vendor Audits - monitor defect rates/inspection effectiveness * Inspection implementation at vendor * Identify & Implement opportunities to reduce waste & improve product performance through error proofing
-
-
-
Ace Electric, Inc
-
United States
-
Construction
-
100 - 200 Employee
-
Apprentice Electrician (Level 1)
-
Feb 2009 - Jun 2009
• Install wiring during the phases of construction. • Testing circuits, breakers, outlets and grounds, and maintain excellent standards of quality that meets the Canadian Electrical Codes and Regulations • Install wiring during the phases of construction. • Testing circuits, breakers, outlets and grounds, and maintain excellent standards of quality that meets the Canadian Electrical Codes and Regulations
-
-
-
Emerson Network Power
-
United States
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Failure Analysis Supervisor/Engineer
-
Apr 2006 - Feb 2008
FAILURE ANALYSIS SUPERVISOR• Supervised 13 troubleshooting personnel for almost 2 years• Defined/monitored Key Results area for all support personnel• Organized peoples task, schedules to meet production requirementsFAILURE ANALYSIS ENGINEER• Identify, analyze and document defects on power supply module up-tocomponent level, generate a corrective action to maintain the Production TestYield/Production Test PPM• Inter-actively communicate with AI-SMT group, Assembly Line, RnD, ProductEngineering, Process Engineering and Quality group on the quality issues of the PSU’s inside the Plant and on customers issues Show less
-
-
Test Engineer
-
May 1998 - Mar 2006
• Develop testing methodologies and execute/maintain automation test scripts using automated testing tools in compliance to product specification• Implemented Continuous Improvement in Test Process• Knowledgeable of test and measurement instrumentation including PC-basedI/O, Data Acquisition Instrument and PLC driven hardware
-
-
Education
-
British Columbia Institute of Technology
Electrical Refresher Course, Completed -
British Columbia Institute of Technology
Electrical Code Course, Completed -
Pamantasan ng Lungsod ng Maynila
Bachelor's Degree, Electrical Engineering