Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Kingdom
    • Telecommunications
    • 100 - 200 Employee
    • Network Support Manager
      • Sep 2021 - Present
    • United Kingdom
    • Telecommunications
    • 200 - 300 Employee
    • Fibre Solutions Architect
      • Jan 2021 - Sep 2021
    • Connecting Devon & Somerset Deployment Manager
      • Aug 2017 - Jan 2021
    • United Kingdom
    • Business Consulting and Services
    • 300 - 400 Employee
    • Consultant
      • Apr 2017 - Aug 2017

      Analysys Mason – Consultant for Republic of Ireland National Broadband Plan – April 2017 to August 2017 Providing consultancy services for the network deployment methodology selection (e.g. FTTC / GPON / NG-PON2) and bid response evaluation re: the construction of the Republic of Ireland’s National Broadband network. Analysys Mason – Consultant for Republic of Ireland National Broadband Plan – April 2017 to August 2017 Providing consultancy services for the network deployment methodology selection (e.g. FTTC / GPON / NG-PON2) and bid response evaluation re: the construction of the Republic of Ireland’s National Broadband network.

    • Brunei Darussalam
    • Telecommunications
    • 100 - 200 Employee
    • FTTX / FTTH Project & Implementation Manager
      • May 2012 - Feb 2017

      Project managed Telekom Brunei’s nationwide expansion of their Fibre-to-the-Premise (FTTP / FTTH) network. Project value was £14 million, (BND 26 million). At contract end in February 2017 Brunei’s first-rate FTTP / FTTH network was successfully delivered. The project was completed within budget and to high quality standards. Robust, calm man-management was exhibited and an open, committed and amicable culture was infused into the in-house implementation and planning teams and contractors. Change managed Telekom Brunei’s network planning and design from an outsourced model to in-house, directly employed staff to bring skills and knowledge in-house and accelerate network construction and service activation. Set the project’s design rules / parameters and managed the Planning department’s production of technical drawings and associated documents / work instructions for the rollout of new FTTP and expansion of FTTC (MSAN) networks. January 2015 – Accepted the additional duties of the FTTP Project Implementation Manager role alongside the project and planning management tasks. Produced and presented weekly reports to ‘C’ level management. Show less

    • 1 - 100 Employee
    • Logistics and Engineering Contractor
      • Sep 2011 - Apr 2012

      Introduced extremely efficient project management of commercial and residential Solar PV installations by having a “just-in-time” ethos with the coordination of scaffolding, roofing and electrical engineering contractors. Managed the supply chain to ensure stores and equipment were delivered to site exactly when required to maximise productivity and workflow but also with a view to accurately control expenditure and wastage. Introduced extremely efficient project management of commercial and residential Solar PV installations by having a “just-in-time” ethos with the coordination of scaffolding, roofing and electrical engineering contractors. Managed the supply chain to ensure stores and equipment were delivered to site exactly when required to maximise productivity and workflow but also with a view to accurately control expenditure and wastage.

    • Bolivia
    • Accounting
    • Senior Consultant
      • Jan 2011 - Apr 2011

      Audited engineering staff to review and document the current methods and procedures for Metro-E Primary Fibre and GPON FTTH network planning and OSP network installation and maintenance. Conducted site visits with Field Technicians and Contractors to assess their ability and productivity, the quality of the current installation and maintenance work and the suitability of their tools and test equipment. Reviewed the OSP network installation methodology and procedures and recommended changes to fibre testing parameters, fibre handling and restraint, cable management, fibre jointing and joint security. Conducted training workshops across the Field Supervisor, Field Technician and Contractor base to mandate standard working practices and implement the audit findings and recommended quality improvements. Show less

    • Project Engineer
      • Sep 2006 - Nov 2010

      Saudi Arabia: Managed the Design Team’s production of technical drawings, method statements, BOQs and BOMs for FTTX civils and fibre network construction and governed the “as-built” quantity surveying process. Provided in-depth operational and technical support to a team of ISP and OSP Supervisors and Technicians. UK: BT CJF installation: Introduced rigorous and comprehensive quality checking, fibre testing and recording procedures to assure quality standards and prevent connectivity / early life failures and remedy payments. Show less

    • Project Manager
      • May 2005 - Aug 2006

      Project managed Mainframe’s exit from their contract with Fujitsu Telecommunications and BT. Arranged and administered the handover of work areas and documentation in a progressive and controlled manner to maintain a seamless supply of engineering resources to BT. Project managed Mainframe’s exit from their contract with Fujitsu Telecommunications and BT. Arranged and administered the handover of work areas and documentation in a progressive and controlled manner to maintain a seamless supply of engineering resources to BT.

    • Advertising Services
    • Project Engineer
      • Mar 2004 - Apr 2005

      Worked with the Sales and Marketing Departments to explore the feasibility of installing Wireless Internet Access Points in various locations, (identified and resolved site specific service provision issues). Coordinated the installation of Wireless Internet Access Points in Motorway Services and Marriott Hotels throughout the UK including Customer acceptance testing and handover. Worked with the Sales and Marketing Departments to explore the feasibility of installing Wireless Internet Access Points in various locations, (identified and resolved site specific service provision issues). Coordinated the installation of Wireless Internet Access Points in Motorway Services and Marriott Hotels throughout the UK including Customer acceptance testing and handover.

    • United Kingdom
    • Telecommunications
    • Technical Support Supervisor
      • Jan 1997 - Dec 2003

      Managed a team of Business Technical Support Engineers and Surveyors covering the Devon, Bristol, Gloucestershire and Midlands franchise areas. Project managed installations from initial order through to service commissioning and Customer hand-over. Supported the Business Sales Team by researching and implementing be-spoke and innovative solutions. Managed a team of Business Technical Support Engineers and Surveyors covering the Devon, Bristol, Gloucestershire and Midlands franchise areas. Project managed installations from initial order through to service commissioning and Customer hand-over. Supported the Business Sales Team by researching and implementing be-spoke and innovative solutions.

    • Senior Engineer
      • Mar 1994 - Nov 1996

      Managed home-based Installation and Maintenance Engineers installing least-cost routing switching equipment throughout the South of England. Conducted training courses for newly recruited Engineers throughout the UK and mainland Europe. Provided technical support and special fault investigation and resolution. Managed home-based Installation and Maintenance Engineers installing least-cost routing switching equipment throughout the South of England. Conducted training courses for newly recruited Engineers throughout the UK and mainland Europe. Provided technical support and special fault investigation and resolution.

    • Belgium
    • Financial Services
    • 1 - 100 Employee
    • T2A Technician
      • Aug 1987 - Dec 1993

      Provision and repair of telephone lines and equipment supplied to Business Customers. Six month secondment to Aerial Rigging Team installing microwave dishes on masts and buildings. Provision and repair of telephone lines and equipment supplied to Business Customers. Six month secondment to Aerial Rigging Team installing microwave dishes on masts and buildings.

    • Apprentice Electrical Engineer
      • Aug 1984 - Jul 1987

      Successfully completed a three-year Electrical Engineering Apprenticeship. The apprenticeship included college day release to study BTEC ONC Electrical and Electronic Engineering. Successfully completed a three-year Electrical Engineering Apprenticeship. The apprenticeship included college day release to study BTEC ONC Electrical and Electronic Engineering.

Education

  • Exeter College
    BTEC ONC, Electrical and Electronics Engineering
    1984 - 1987
  • Limavady Grammar School, Limavady, Northern Ireland.
  • Prince Rupert School, Rinteln, Germany.

Community

You need to have a working account to view this content. Click here to join now