Richard Chamberlain

Labour manager at Ductclean UK Limited t/a DCUK FM
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Labour manager
      • Jun 2018 - Present

    • Night Manager/Northern Labour Manager
      • Oct 2016 - Jun 2018

    • Night Manager
      • Nov 2014 - Oct 2016

    • Asbestos Operative/Supervisor
      • Aug 2011 - Nov 2014

      Started within the rail refurbishment side of the the firm then got involved with the asbestos removals and remediation on day works as my knowledge and experience grew became a supervisor and have been managing and running sites day to day on LU sites and construction and demolition sites dependent on job requirements at various locations throughout UK.

    • United Kingdom
    • Civil Engineering
    • 300 - 400 Employee
    • Platelayer/ Ganger
      • Jul 2010 - Aug 2011

      Working as a subcontractor for Balfour Beatty on LU rail refurbishment projects. Works consisted of all aspects of track works running a team of men as a ganger including sleeper removal and reinstatement. Full re-con Rail replacement Open section and closed tunnel section. Also various Network Rail projects as self employed linesman and sub contracting with Balfour Beatty Working as a subcontractor for Balfour Beatty on LU rail refurbishment projects. Works consisted of all aspects of track works running a team of men as a ganger including sleeper removal and reinstatement. Full re-con Rail replacement Open section and closed tunnel section. Also various Network Rail projects as self employed linesman and sub contracting with Balfour Beatty

    • Monaco
    • Transportation, Logistics, Supply Chain and Storage
    • 200 - 300 Employee
    • Site Manager
      • Dec 2009 - Jul 2010

      I was there to set up a welfare facility for the Italian MIlitary. This included the organisation of the logistics of planning and moving materials from there drop point into Kabul and moving to final destination. Also the site layout and building of the welfare facility's in coordination with all the military departments involved. This involved all paper works and documentation correct as had to pass thru US military aswell as Italian hands. I was there to set up a welfare facility for the Italian MIlitary. This included the organisation of the logistics of planning and moving materials from there drop point into Kabul and moving to final destination. Also the site layout and building of the welfare facility's in coordination with all the military departments involved. This involved all paper works and documentation correct as had to pass thru US military aswell as Italian hands.

  • G M Rail
    • London, United Kingdom
    • Platelayer
      • Sep 2008 - Dec 2009

      Working as a subcontractor for Balfour Beatty on LU rail refurbishment projects. Works consisted of all aspects of track works including sleeper removal and reinstatement. Full re-con Rail replacement Open section and closed tunnel section. Also various Network Rail projects as self employed linesman and sub contracting with Balfour Beatty Working as a subcontractor for Balfour Beatty on LU rail refurbishment projects. Works consisted of all aspects of track works including sleeper removal and reinstatement. Full re-con Rail replacement Open section and closed tunnel section. Also various Network Rail projects as self employed linesman and sub contracting with Balfour Beatty

Education

  • Maricourt high school

Community

You need to have a working account to view this content. Click here to join now