Riccardo Felici

Country Manager OWC / Project Manager at OWC
  • Claim this Profile
Contact Information
Location
Ho Chi Minh City, Vietnam, VN
Languages
  • Italian Native or bilingual proficiency
  • English Full professional proficiency
  • French Limited working proficiency
  • German Elementary proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Project Management Professional (PMP)®
    Project Management Institute
    Jun, 2022
    - Sep, 2024
  • Open Water Diver
    SSI
    Jun, 2019
    - Sep, 2024
  • Yachtmaster Offshore
    Royal Yachting Association (RYA)
    Apr, 2014
    - Sep, 2024

Experience

    • United Kingdom
    • IT Services and IT Consulting
    • 100 - 200 Employee
    • Country Manager OWC / Project Manager
      • Jul 2021 - Present

      Leading the regional growth of Offshore Wind Consultants (OWC) in Vietnam Leading the regional growth of Offshore Wind Consultants (OWC) in Vietnam

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager / Naval Architect
      • Oct 2018 - Jul 2021

      Renewable Energy Installation ExpertFurther to delivering offshore installation analysis & procedures in the Singapore Office, thanks to the strong knowledge in Offshore Wind and offshore cable installation analysis I participate in the bidding and delivery for several offshore regional projects. Attended and presented at several renewable energy conferences in the region.As part of the team role I am also looking at the bid preparation and work schedule development for vessels designs and conversions. I have also delivered a two weeks long subsea cable installation analysis training for a national Taiwanese Research and Development Centre.Main projects involved in Singapore:- Cable interconnector APAC - Engineering Manager - LS Cables - 2 HVAC circuits - Provision of procedures and analysis for client for Vertical Injector installation- Cable repair - Lead Engineer - LS Cables - HVAC damage - Provide installation engineering and procedures for cable repair- 103m Cable Lay vessel design - Naval Architect - Woen Jinn Engineering - Concept & Basic design including hullform development, powering, layouts, etc..- 95m Dumb Barge to Cable Lay Barge Conversion - Lead Naval Architect/ Project Manager - LS Cables - Design and overview- Waste recovery and treatment vessel - Lead Naval Architect - Confidential - development of conversion specifications , costing estimate, revenue estimate, project schedule and strategy- River waste recovery vessel - Lead Naval Architect - Seven Clean Seas - Concept design- Dynamic DP Offloading Study - Main Engineer - Woodside - Shallow water analysis for LNG refueling while at anchor Show less

    • Naval Architect
      • Jan 2017 - Oct 2018

      During the placement in Longitude i was able to develop my engineering analysis skills, specialising in the offshore wind farms sector. I was responsible for several cable installation analysis and I was the main naval architect for the concept design of a 110m cable lay vessel.Below is a list of the main projects i was involved:- Project Manager Assistant for Costa Concordia Site Remediation, legacy project from LOC London. Provide technical and cost evaluation for large variation orders. Involved in the discussion and approval for the next phase of the works, site restauration- Cable Lay Vessel Concept Design - Main Naval Architect- North Sea Link Interconnector Lay Analysis – Main Engineer- Northern OWF Cable Protection System Structural Analysis (ULS, VIV, FLS) – Main Engineer- Performed Orcaflex ULS and VIV analysis for CPS and Cable for Offshore Wind Farms- Developed Orcaflex soil interaction model to represent the reaction forces of a buried cable- Developed MOSES / WAMMIT hydrodynamic models from lines plan to produce RAOs- Developed several Python scripts for pre / post processing in Orcaflex to reduce the run time of simulations- Developed Python script to carry out mooring analysis in frequency domain in Orcaflex- Performed de-rating calculations for crawler crane based on ABS standards Show less

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Naval Architect
      • Sep 2015 - Dec 2016

      While being at LOC i was exposed to a large variety of projects which allowed me to gain familiarity with both the shipping industry, including wreck removal operations, and the oil and gas industry. Below a summary of the main projects involvement during the LOC placement: - Client Representative for Costa Concordia Site Remediation. Involved in the long site attendances as CR as part of a small team. Provided evidence, such as drawings and cost estimates, in the discussions for a large variation order in the contract. Developed strong knowledge in commercial diving, both surface and saturation, and site remediation and restauration activities - Attended suitability surveys for offshore Oil & Gas project - Attended ship loading operations of project equipment as MWS - Developed strong analytical and practical skills to sea-fastening of medium and large structures for sea and HPU transportation - Numerous document reviews for Marine Warranty Surveyor’s purposes of large prefabricated modules. These included sea and land transportation structural analysis, mooring and ballasting loadout analysis - Produced weight estimates of semi-submersible offshore drilling rig for large legal dispute - Produced 3D model of seabed and sunken wreck for legal dispute - Attended week long ship familiarization training on board 17,722 TEU container ship, CMA CGM Kerguelen - Attended week long ship yard training at A&P Tyne Show less

    • Summer Intern - Naval Architect
      • Jun 2014 - Aug 2014

      Followed the mobilization of a cable lay ship from concept stage through to construction. Focused on the structural analysis, using STAAD, and design using CAD software, Rhino and AutoCad, of the stern chutes and cable highway. Followed the mobilization of a cable lay ship from concept stage through to construction. Focused on the structural analysis, using STAAD, and design using CAD software, Rhino and AutoCad, of the stern chutes and cable highway.

    • Summer Intern - Naval Architect
      • Jun 2013 - Sep 2013

      Worked in the design office, issuing drawings and producing 3D models of various parts of different yachts which were in production. Had the challenge of, and responsibility for, redrawing using Rhino the whole deck of the company’s ultimate creation, the Discovery 58. Worked in the design office, issuing drawings and producing 3D models of various parts of different yachts which were in production. Had the challenge of, and responsibility for, redrawing using Rhino the whole deck of the company’s ultimate creation, the Discovery 58.

Education

  • University of Southampton
    Master’s Degree, Naval Architecture and Marine Engineering
    2011 - 2015
  • European School of Luxembourg
    High School
    2008 - 2011
  • Liceo Scientifico Spallanzani
    High School
    2007 - 2008

Community

You need to have a working account to view this content. Click here to join now