Ricardo Sequeira
Associate Director at Clarkebond- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Portuguese Native or bilingual proficiency
-
Spanish Elementary proficiency
-
French Elementary proficiency
Topline Score
Bio
Credentials
-
MEng. CEng MIstructE
-
Experience
-
Clarkebond
-
United Kingdom
-
Engineering Services
-
1 - 100 Employee
-
Associate Director
-
Jan 2021 - Present
-
-
-
AKT II
-
United Kingdom
-
Civil Engineering
-
200 - 300 Employee
-
Associate Director
-
Jul 2018 - Jan 2021
Reflecting my progress within the company, my responsibilities at AKT have grown significantly since joining. Working on complex projects during both early and construction stages in central London, with complex constraints and changing priorities, I have led my team to deliver the required information according to programme. I have gained experience in managing large teams (up to 14 Structural Engineers plus Civil and Geotechnical Engineers), designing steel and concrete composite structures as well as CLT and other construction materials. I am responsible for creating fee proposals for additional works, establishing design programmes, liaising with stakeholders, tracking progress of work, maintaining technical overview of the project and reporting to senior management. I have also delivered presentations to the contractor and client explaining project details and to students on behalf of AKT.
-
-
Associate
-
Mar 2017 - Jul 2018
-
-
-
Pell Frischmann
-
United Kingdom
-
Civil Engineering
-
400 - 500 Employee
-
Principal Structural Engineer
-
Mar 2015 - Feb 2017
New Regent’s College Mixed Use Development: Lead Structural engineer on this development that proposes to build new extended facilities for the New Regent’s College as well as a new residential development on top of the school. The building will be divided in three main blocks: the tower, a twenty nine storey residential tower; the Nile Street Block, a seven storey residential building & a two storey school building with sports hall. These three blocks will be located around a central courtyard that will serve the school exclusively.
-
-
-
Michael Barclay Partnership LLP
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Senior Structural Engineer
-
Oct 2011 - Feb 2015
I was responsible for the design, coordination and development of projects of high end residential. I was in charge of producing all elements for the project from scheme to finalization, this includes liaising with both the design team and the client.I gained experience designing masonry, steel and concrete elements with particular attention to detail and finishes.In 2014 I have achieved chartership with the Institute of Structural Engineers.Dilijan Performance Arts Centre – Armenia:The UWC Dilijan Performing Arts Centre will provide a world-class concert space for orchestral performances, choral recitals, school assemblies, plays, musicals and examinations. As lead engineer, I was involved in the scheming and developing the design of the main auditorium building, located in one of the highest seismic areas in the world. I was also leading the coordination between the various disciplines. 50 Draycott Place/10 Draycott Avenue: Valued at £12m the project fits with the typical development in the Kensington and Chelsea area creating six new high end residential units. The building was formed by 2 parts The first area is an eight storey concrete frame with a basement, requiring the underpinning of all the perimeter walls, the second area consisted of retaining the existing façade and replacing all floors and roof. As lead engineer I carried the design of the building from scheme to completion of the shell & core package.
-
-
-
-
Gap year
-
Sep 2010 - Aug 2011
Traveled through Singapore; Sarawak; Brunei; Sabah; Philippines; Thailand; Cambodia; Laos; Myanmar; India and Sri Lanka
-
-
-
Buro Happold
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Structural Engineer
-
Jul 2006 - Aug 2010
Mediacite Liege: The new iconic steel and ETFE roof covers a 450m long shopping mall and is supported by both a new and existing concrete structure. The structure is formed by double curvature welded steel plates of varying thickness that span along the structures longitudinal axis. I was responsible for the 3D models and information transfer between the architect, the structural engineers and the contractor as well as the coordination between the structural engineer and the other disciplines. King Abdullah Financial District – Plot 4.02 – Riyadh: The project consisted of two independent buildings rising above a two storey podium building. One of the buildings has five residential floors and the second building six office floors. The podium building was a shopping centre. Occupying the whole plot area are four basement levels of car parks. The building was done as a reinforced concrete frame with two levels of transfers to accommodate the various grids within the layouts. I was responsible for the structural design of the plot as well as coordinating the design with the other disciplinesKing Abdullah International Gardens – Riyadh: This development comprises a botanic garden scheme with two main covered crescent shaped buildings. The inner crescent will have an external radius of 208m and a circumferential length of approximately 700m, while the outer crescent will have an external radius of about 265m and a circumferential length of 850m. The internal free span varies from 12m to 80m. I was responsible for the design of the double curvature canopy structure of the crescents. The Cutty Sark Conservation Project: The restoration of this iconic ship included the strengthening of the ship structure to allow for the ship to be lifted on cradles allowing a new experience for the visitor. I was responsible for creating the process of translating the 3D point survey of the ship into the structural model as well as part of the analysis of the ship structure.
-
-
-
A-Kavousian Photography
-
Architecture & Planning
-
Structural Engineer
-
Mar 2004 - May 2006
I was responsible for the design of RC, Steel and timber buildings according to the Eurocodes working closely with all the design team. I was responsible for ROBOT MILLENNIUM calculation package software technical support in Portugal.Delivered introduction and advanced courses on the software throughout Portugal.
-
-
Education
-
Instituto Superior Técnico
Engineer, structural engineering