Rhys Williams

Senior Scheduler at Mesh & Bar
  • Claim this Profile
Contact Information
Location
Greater Brisbane Area

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Australia
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Senior Scheduler
      • Sep 2021 - Present

    • Project Coordinator
      • Aug 2017 - Sep 2021

      - Reinforcing scheduling and project coordination, for large scale construction projects based in the South East Queensland region. - Responsible for determining supply of concrete reinforcing and concrete construction products for typical projects ranging from: TMR Civil, Industrial facilities, residential/commercial mid and high-rises. - Full turn-key customer coordination. I.e Point of contact with the client from start to finish of the concrete works. - Some recent/current projects are; Queens Wharf (Multiplex, Brisbane City), Vue Terrace Homes (Hutchinson, Gold Coast, Robina), Le-Bain (Torre, 18 storey, Brisbane, Newstead), Luminare (Torre, 30 storey, Brisbane, Newstead), South City Square (Pellicano, 22 storey, Brisbane, Woolloongabba) - Contributed to Infrabuilds recent modernisation of work techniques, methods and procedures, as acquired from my previous roles. - Referencing to AS3600, TMR Standards, and various construction system referencing.

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Senior Structural Engineer
      • Oct 2015 - Dec 2016

      • ‘Johan Sverdrup’, (Statoil, North Sea). • Contract role. • Multi-platform bridge linked development. • Joined the Detailed Design team for the design of the Riser Platform. • Responsible to design the non-standard nodes and connections. • Additionally, provided adhoc calculations and advice for the secondary engineering team. • Design/analysis to European design codes (EC3, DNV, Norsok). • Design produced with STAAD.Pro and design model reviewing in ABACUS and SESAM. Calculations produced in Microsoft Excel, STAAD.Pro and Toolkit. PDMS and Autodesk Navisworks used for daily referencing.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Principal Structural Engineer
      • Jul 2012 - Oct 2015

      • ‘Cygnus Project’, (GDF Suez, North Sea). • Contract role. • Multi-platform bridge linked development. • Completed project from start to finish. Phases include: FEED, Detailed Design, Follow-On and Hook-up. • Initial responsibility was the area lead primary analyst; to design, coordinate and manage the Alpha Production and Utilities (APU) Platform carcass design team. Also ‘Seconded’ the management of our team’s platform requirements. During Follow-On and Hook-up, the responsibility changed to cover all four Cygnus platforms, and to cover all structural design issues. • Provided progress reporting, attending model review meetings, aided with resourcing strategies, and liaised with other disciplines. • Additionally performed; review and redesign of the Compression Module Flare Tower, high level reviews of major secondary items, module T&I interface and design, and represented the structural group for weight and cost reduction strategies. • Design/analysis to American design codes (API & AISC WSD). • Main steel design produced with STAAD.Pro (DD) and SACS (FEED - Compression Module and Flare only), and model reviewing in ABACUS. Secondary calculations produced in Microsoft Excel, STAAD Pro and Toolkit. PDMS and Autodesk Navisworks used for daily referencing.

    • Principal Structural Engineer
      • Mar 2011 - Jul 2012

      • ‘Golden Eagle’, (Nexen, North Sea), Topside Structure. • Contract role. • Multi-platform bridge linked development. • Joined and completed the FEED and Detailed Design phases. • Responsible as the area lead primary analyst to design, coordinate and manage the Wellhead carcass design team. Also provided design assistance on the Process/Utilities/Quarters team. • Provided the Carcass node and connection design, the offshore fire design and verification, and the design of a 3 level Waste Heat Removal structure. • Design/analysis to American design codes (API & AISC WSD). • Primary analysis produced with ASAS. Secondary calculations produced in Microsoft Excel, STAAD.Pro and Toolkit. PDMS and Autodesk Navisworks used for daily referencing.

    • Senior Structural Engineer
      • Nov 2010 - Mar 2011

      • ‘Clair Ridge’, (BP, North Sea), Topside Structure. • Contract role. • Joined and completed the FEED phase, of a 9500Te module (Drilling and Production, Module). Continued on to the Detailed Design Phase. • Responsible as a Primary Analyst to coordinate and manage the Carcass modeling. • Local design of a bridge landing (sliding end) interfacing with a large and complex multidiscipline, multi-level pipe-rack structure. • Produced the project deck stiffener design to standardize sizing across the project. • Design/analysis to American design codes (API & AISC LRFD). • Primary analysis produced with SESAM. Secondary calculations produced in Microsoft Excel, STAAD.Pro and Toolkit. PDMS used for daily referencing.

    • Oil and Gas
    • 1 - 100 Employee
    • Senior Structural Engineer
      • Jun 2010 - Nov 2010

      • ‘Goliat’, (Eni Norge, Barents Sea [Norway]), FPSO, Cylindrical Floater Topside Structure. • Contract role. Project was stopped. • Joined the Detailed Design phase. • Responsible for the Carcass design of the Utilities Module. Predominately a stiffened-plate structure, therefore modeled with both beam and 2D plate elements. • Local design of all stiffened-plate items within the Utility area boundary. • Produced the methodology approach for Dropped Object design for the project. • Secondary steel design, including access platforms and equipment supports. • Design/analysis to Norwegian and Euro design codes. • Primary analysis was produced with STAAD.Pro. Secondary calculations produced in Microsoft Excel, STAAD.Pro, STIPLA and Toolkit. PDMS used for daily referencing.

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Senior Structural Engineer
      • Oct 2009 - Jun 2010

      • ‘The Gordon Project’, (Joint venture: Chevron, Exxon Mobil and Shell, Western Australia). Onshore LNG facility. To be built on a heavily environmentally protected island - Barrow Island. • Contract role. • Joined the tail end of FEED, and continued into the Detailed Design phase. • Responsible for the Carcass design for a 5800Te PAU (Refrigeration). • Secondary steel design, including stair towers, and equipment supports. • Design/analysis to Australian and American design codes. • Primary analysis produced with STAAD.Pro. Secondary calculations produced in Microsoft Excel, STAAD Pro and Toolkit. PDMS used for daily referencing.

    • United States
    • Oil and Gas
    • Structural Engineer
      • Aug 2007 - Oct 2009

      • ‘Valhall’ (BP, North Sea), Topside Modules. • Contract role. • Joined and completed the Detailed Design Phase. Then completed the site placement on the SLP fabrication yard in Lowestoft (6 months). • Initially responsible for two 300Te Modules (Low Voltage and Emergency modules). Solo responsible for all design aspects. • Later joined the site construction team by producing construction sequence analysis for a 9 storey ‘Living Quarters’ module. Responsible for confirmation of ‘pancake’, level-by-level, site-moves and site-lifts, via structural analysis confirmation. • Main site duties include: Assisting construction with day-to-day site structural issues; acting project engineer by coordinating with the Aluminium subcontractor (Round House); and provided solo structural supervision during construction site moves and lifts. • Designed and detailed padeyes, spreader bars, and rigging arrangements for the temporary onsite construction sequences. • Design/analysis to European and American design codes. • Primary analysis produced with SACS suite of Programs. Secondary calculations produced in Microsoft Excel, STAAD Pro and Toolkit. Autodesk Navisworks was used for referencing.

    • Mauritius
    • Construction
    • 1 - 100 Employee
    • Structural Engineer
      • Mar 2006 - Aug 2007

      • ‘The Walbrook’ (Fosters and Partners). Onshore, 10 storey steel framed office new-build in Central London to an unusual complex shape. • Contract Role. • Responsible for the structural concept, design, and analysis of the steel framing. • Designed composite concrete slabs, and the concrete cores to British Codes. • Analysis provided with the frame analysis program; GSA. Other programs used were; Compos, Fabsec, and Microsoft Excel. • ‘The Walbrook’ (Fosters and Partners). Onshore, 10 storey steel framed office new-build in Central London to an unusual complex shape. • Contract Role. • Responsible for the structural concept, design, and analysis of the steel framing. • Designed composite concrete slabs, and the concrete cores to British Codes. • Analysis provided with the frame analysis program; GSA. Other programs used were; Compos, Fabsec, and Microsoft Excel.

    • United Kingdom
    • Construction
    • 400 - 500 Employee
    • Structural Engineer
      • Mar 2005 - Mar 2006

      • ‘Liverpool St’, Onshore, multi-use building, with commercial, residential, and large suspended green areas. It was part of the redevelopment of Liverpool’s CBD. • Contract Role. • Typical concrete design of slabs/beams (Reinforced and Post-tensioned), columns, walls and pile caps to British Codes. • Analysis and calculations provided by RAPT, Masterseries, and Microsoft Excel. • ‘Liverpool St’, Onshore, multi-use building, with commercial, residential, and large suspended green areas. It was part of the redevelopment of Liverpool’s CBD. • Contract Role. • Typical concrete design of slabs/beams (Reinforced and Post-tensioned), columns, walls and pile caps to British Codes. • Analysis and calculations provided by RAPT, Masterseries, and Microsoft Excel.

    • Australia
    • Construction
    • 700 & Above Employee
    • Structural Engineer
      • Jan 2003 - Mar 2005

      • First employment as a Post Graduate. • Permanent Role. • Worked on numerous projects for both local high-rises in Brisbane. Later joined their newly formed Global Division. Notable global projects include: Heathrow Terminal 5 Carpark, Dubai Airport Expansion, Oxford Radcliffe Hospital (UK), and Long Lane residential apartments (UK). • Designed typical concrete and steel structural elements, including concrete slabs/beams (reinforced and post-tensioned), walls, cores, pads, and footings. • Conducted site inspections, including a dilapidation inspection/reporting of the Gabba Cricket ground (Brisbane). • Analysis provided by RAM Concept, RAPT, and Microsoft Excel.

    • Australia
    • Civil Engineering
    • Assistant Structural Engineer
      • Jun 2002 - Jan 2003

      • General assisting/reviewing as an Undergraduate. • Part Time. • Reviewed the Gold Coast Convention Centre’s steel seating arrangement, and reviewed concrete slab design of ‘The Aria’ residential high-rise. • Analysis provided with Multiframe and Microsoft Excel • Reviewed the Gold Coast Convention Centre’s steel seating arrangement, and reviewed concrete slab design of ‘The Aria’ residential high-rise. • Analysis provided with Multiframe and Microsoft Excel • General assisting/reviewing as an Undergraduate. • Part Time. • Reviewed the Gold Coast Convention Centre’s steel seating arrangement, and reviewed concrete slab design of ‘The Aria’ residential high-rise. • Analysis provided with Multiframe and Microsoft Excel • Reviewed the Gold Coast Convention Centre’s steel seating arrangement, and reviewed concrete slab design of ‘The Aria’ residential high-rise. • Analysis provided with Multiframe and Microsoft Excel

Education

  • Griffith University
    Bachelor of Civil Engineering (Hons)
    1998 - 2002
  • Nambour HS
    -

Community

You need to have a working account to view this content. Click here to join now