R. Husein Habsji

at Wilmax Control Systems
  • Claim this Profile
Contact Information
Location
Riau, Indonesia, ID

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Singapore
    • Oil and Gas
    • 1 - 100 Employee
      • Jun 2013 - Present

      Biocide Injection Pump Skid for Provision of Engineering and Modification Services for Zawtika Operation - Engineering, Procurement, Hookup and PMT (Myanmar) – TNS and PTTEP Int. LLCGas Development Project for the Unitization of the Jambaran - Tiung Biru Field – Pertamina EP Cepu (Indonesia)Bukit Tua Phase 2B Development Project – PC Ketapang II Limited (Petronas)Siemens PLC integrated WHCP for Musallim area – PDO (Oman)Safeguarding Hierarchy and SIL3 Upgrade modification and testing Khulud Area – PDO (Oman)Integrated Hydraulic WHCP and Safeguarding System for Khulud Development Project CPF (West & East) – PDO (Oman)Integrated Hydraulic WHCP and Safeguarding System for High Pressure Gas Wells in Yibal Area – PDO (Oman)Gaslift Modification for Kauther-22 Well Kauther Gas Plant Area Pilot Project – PDOWHCP Zauliyah Gas Plant area – PDO (Oman)PHE-12 & PHE-24 – PHE WMO (Cilegon, Indonesia)WP5 and WP7 Zawtika Development Phase 1B – COOEC (Myanmar)WHCP, Gas Lift Panels, Fusible Loop Panel & Local Panel at MWP-BL Platform Bekapai 2B / EPSC 1 Project - TEPI (Indonesia)WHCP for PDO – PDO (Singapore)WHCP at MWP-BG Platform Bekapai 2B / EPSC 1 Project - TEPI (Indonesia)MWP-BL Platform Bekapai 2B/EPSC 1 Project - TEPI (Indonesia)Wellpad MJE-20 Majnoon Oil Field – Shell Iraq Petroleum Development (Basra, Iraq)Turkmenistan Block 1 Development Project - Petronas Carigali Sdn.Bhd. (Turkmenistan)WHCP PLC Integrated Bundle Phase Project (3M) for TNS & PTTEP (Thailand)WHCP PLC Integrated Bundle Phase Project (2C) for TNS & PTTEP (Thailand)Sisi Nubi Phase 2B And Peciko Phase 7B Development Project, 3 Platform WPN3, WPS2+HPU, SWPJ For TEPI (Indonesia)WHCP Ruby (Sebuku) Field Development Project for Mubadala Petroleum (Indonesia)WHCP PLC Integrated Chevron Phase 44 for Chevron Thailand (Thailand) Show less

      • Sep 2011 - Jun 2013

      ~ 24 Wells Wellhead Control Panel PLC Integrated Chevron Phase 44 - Chevron (Thailand) ~ 9 module wells Wellhead Control Panel Ruby (Sebuku) Field Development Project - Mubadala Petroleum (formerly PearlOil), Indonesia ~ 20 Wells Wellhead Control Panel PLC Integrated Automation Upgrade Scope BAWC for Chevron (Thailand) ~ Fusible Plug Loop Charging Panel ( Ruby Tie-In Project-EPSC2) Total E&P Indonesie On Behalf Of PearlOil, Indonesia

    • Oil and Gas
    • 1 - 100 Employee
    • Project Engineer
      • Nov 2006 - Sep 2011

      Responsibilities: ~ Report to Project Manager(s). ~ Responsible for process engineering & design development on various projects. ~ Sizing Calculation for Hydraulic / Pneumatic sizing (Motor sizing, Pump Sizing, Accumulator Sizing, Reservoir Sizing, Nitrogen/ N2 Sizing). ~ Schedule and Maintain Project Progress. Design and drawing for Hydraulic Power Unit Package, Wellhead Control Panel, Fusible Plug, Instrument Control Equipment and electric wiring diagram. ~ Material Take Off. ~ Prepare & development of Proposal Drawings, Construction Drawings, Arrangement Layout Drawings and also As Built Drawings. ~ Monitoring and Check of Project Execution as per construction drawing. ~ Prepare documents such as Operation manual procedure, Maintenance manual procedure, commissioning and start up procedure. ~ Prepare Vendor Data Master List (VDML) as follow: Factory Acceptance Tests procedure, Instrument Data Sheet and other information of equipment. ~ Ensure All Function of Equipment and trouble shooting. ~ Conduct Factory Acceptance Test Equipment and also follow up Punch list items etc. Project Histories: ~ 24 Wells Wellhead Control Panel PLC IntegratedChevron Phase 41, 39, 37B, 37, 36, 35, 34, 33 (from 2006 to 2011) for Chevron (Thailand) ~16 Wells Wellhead Control Panel PLC IntegratedNuCoastal Field Development for NuCoastal Energy (Thailand) ~ Wellhead Control PanelSu Tu Den – Su Tu Field Development Project for Cuu Long Joint Operation Company (Vietnam) Show less

    • Sales Engineer
      • Aug 1996 - Nov 2006

Community

You need to have a working account to view this content. Click here to join now