Rhethwik KP

Electrical Engineer at Qatar Electro Mechanical Group (QEMG)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
QA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • UPDA Certified Electrical engineer
    Ministry of Municipality and Environment, Qatar
    Jul, 2022
    - Nov, 2024

Experience

    • Qatar
    • Construction
    • 1 - 100 Employee
    • Electrical Engineer
      • Jun 2020 - Present

      Managed project from conception to completion dealing with 12MW Connected load substation, Installation and testing commissioning of Transformers, Generators, Fire alarm, Telecom, CCTV, Access control, central battery systems, BMS, power sockets, Lighting, blackout lighting, Helipad lighting, Earthing, so on including electrification of Weapon rooms, Prison, Defense Minister office, Commandos camp, etc. Drew up a detailed plan to achieve each stage of the project, selecting and leading a large project team of 220 members Assured the quality of all MEP materials and work at site; coordination with Design team and Comment Rectification in shop drawings, work supervision and inspections, MEP clearance, material submittal, material takeoff, material inspection. coordinating Quality Audits and it’s Documents. Show less

    • Project Engineer
      • Oct 2019 - Jun 2020

      Designing of LV and ELV systems, Executed estimation, MEP work coordination and supervision of high-rise buildings, fit outs villas, health center, commercial buildings & factories Played key role in Comment Rectification of shop drawings, coordination of Work inspection Contributed to material submittal, material take-off, material inspection and so on Maintain and coordinating RFI’s, daily reports, Logs, etc. Designing of LV and ELV systems, Executed estimation, MEP work coordination and supervision of high-rise buildings, fit outs villas, health center, commercial buildings & factories Played key role in Comment Rectification of shop drawings, coordination of Work inspection Contributed to material submittal, material take-off, material inspection and so on Maintain and coordinating RFI’s, daily reports, Logs, etc.

    • Canada
    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • Sep 2019 - Oct 2019

      Al Wakra Health Centre Al Wakra Health Centre

    • 1 - 100 Employee
    • Electrical Engineer
      • Mar 2017 - Jul 2019

      Handled Preventive Maintenance & installation of MV, LV & ELV Systems including Transformers; Generators; Centrifugal Chiller; AHU’s; Compressors & Airline System; Boilers, Fire alarm, Telecom, CCTV, Access control, CBS, Pump House, Factory Lighting, fire alarm & Firefighting System, Canteen Machineries, BMS and Industrial Automation, WTP and STP of 1000 KLD, so on Worked on facility management of the industry comprising 12000 employees Managed all Soft Services (House Keeping, Physical Security, Landscaping, Pest Control & Disinfection, Transportation & Fleet Management, Catering & Event Management, etc ). BOQ preparation & estimation and procurement of materials. Show less

    • 1 - 100 Employee
    • Project Engineer
      • Feb 2014 - Feb 2017

      Designing of inspectorate drawings, shop drawings and work execution in the site. Scheduling, execution and billing of all HT / LT work. Estimation from BOQ for procurement of materials. Erection & commissioning of transformers (up to 1250kVA, 11kV / 415V), 630kVA unitized substation and generators (up to 500kVA). Installation activities like LV and HV panel board erections, cable trays and earthing systems. installation of 300KLD sewage treatment plant. Designing of inspectorate drawings, shop drawings and work execution in the site. Scheduling, execution and billing of all HT / LT work. Estimation from BOQ for procurement of materials. Erection & commissioning of transformers (up to 1250kVA, 11kV / 415V), 630kVA unitized substation and generators (up to 500kVA). Installation activities like LV and HV panel board erections, cable trays and earthing systems. installation of 300KLD sewage treatment plant.

  • CIPCO Textile Park
    • Kerala, India
    • Maintenance Engineer
      • Sep 2012 - Feb 2014

      Handled Preventive Maintenance of 11KV indoor substation, Transformer, Generator, panel boards, power looms, cabinet dyeing machines, induction mottos, Compressors & Airline System; Boilers, Fire alarm, Telephone and data, CCTV so on. Handled Preventive Maintenance of 11KV indoor substation, Transformer, Generator, panel boards, power looms, cabinet dyeing machines, induction mottos, Compressors & Airline System; Boilers, Fire alarm, Telephone and data, CCTV so on.

Education

  • Anna University
    Bachelor of Engineering - BE, Electrical and Electronics Engineering
    2007 - 2011
  • Dhanalakshmi Srinivasan College Of Engineering And Technology
    Bachelor of Engineering - BE, Electrical and Electronics Engineering
    2007 - 2011
  • Dhanalakshmi Srinivasan College Of Engineering And Technology
    Bachelor of Engineering - BE

Community

You need to have a working account to view this content. Click here to join now