Reza Aswad
Foreman at MMC GAMUDA KVMRT (T) SDN BHD- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
MMC GAMUDA KVMRT (T) SDN BHD
-
Malaysia
-
Construction
-
200 - 300 Employee
-
Foreman
-
Mar 2020 - Present
-
-
-
-
Foreman
-
Feb 2019 - Oct 2019
DELIMA Diesel Euro 5 Project (MRCSB/PPM Sg Udang, Melaka).Tank Structural Steel Erection, Fabrication, ,Pipe Fitting, Safety coordination task,lifting/rigging activities , monitor manpower, work plan also prepare daily work reports tobe submitted to supervisor managementTank construction/Erection. (PPM area 44)Steel Structure construction/Erection. (PPM area 64) DELIMA Diesel Euro 5 Project (MRCSB/PPM Sg Udang, Melaka).Tank Structural Steel Erection, Fabrication, ,Pipe Fitting, Safety coordination task,lifting/rigging activities , monitor manpower, work plan also prepare daily work reports tobe submitted to supervisor managementTank construction/Erection. (PPM area 44)Steel Structure construction/Erection. (PPM area 64)
-
-
-
Serba Dinamik
-
Malaysia
-
Oil and Gas
-
200 - 300 Employee
-
Senior Pipefitter
-
Mar 2018 - Feb 2019
*RAPID Petronas Project, Pengerang .JohorRaw water treatment (RTP , PRPC UF Sdn Bhd ),Pre - Commissioning raw water treatment plant , temporary screens, Strainers ,blindsand mechanical/technical support/bolting torque and tensioning/install Valves/pipehangers and pipe supports.* Involved in ASME U & R Stamp Certification / Serba Dinamik technical support project. *RAPID Petronas Project, Pengerang .JohorRaw water treatment (RTP , PRPC UF Sdn Bhd ),Pre - Commissioning raw water treatment plant , temporary screens, Strainers ,blindsand mechanical/technical support/bolting torque and tensioning/install Valves/pipehangers and pipe supports.* Involved in ASME U & R Stamp Certification / Serba Dinamik technical support project.
-
-
-
-
Pipefitter
-
Jul 2017 - Dec 2017
Lay out, assemble, install, and pipe supports at pipe rack pakage.. Lay out, assemble, install, and pipe supports at pipe rack pakage..
-
-
-
KNM Process Equipment Inc.
-
Canada
-
Oil and Gas
-
100 - 200 Employee
-
Senior Fitter
-
Nov 2015 - Apr 2017
*RAPID Petronas project, Pengerang. Johor.Storage Tank Construction /Erection ( RAPID Scc Package 5 Steam Cracker Complex )* Involved in Tank Prefabrication at KNM Shah Alam fabrication yard *RAPID Petronas project, Pengerang. Johor.Storage Tank Construction /Erection ( RAPID Scc Package 5 Steam Cracker Complex )* Involved in Tank Prefabrication at KNM Shah Alam fabrication yard
-
-
-
Sapura Energy Berhad
-
Oil and Gas
-
300 - 400 Employee
-
Pipefitter
-
May 2014 - Oct 2014
Bechtel LNG module project , fabrication yard Lumut ,PerakPre - Commissioning LNG Module.Valve management ,piping inspection (Boroscope) , cleaning and passivation. remove and replace worn components. Bechtel LNG module project , fabrication yard Lumut ,PerakPre - Commissioning LNG Module.Valve management ,piping inspection (Boroscope) , cleaning and passivation. remove and replace worn components.
-
-
-
-
Fitter
-
Mar 2007 - Feb 2009
esponsible for installing and fabricating metal sheets used in presure vessel design of applications.Gemusut kakap Platform (Pressure vessel)Tangga Barat Platform ( Pressure Vessel) esponsible for installing and fabricating metal sheets used in presure vessel design of applications.Gemusut kakap Platform (Pressure vessel)Tangga Barat Platform ( Pressure Vessel)
-
-
Education
-
Industrial Training Institute of Kuala Lumpur , Malaysia
Welding Technology/Welder -
UTM-GASTEG
Fitter class 3, Competancy Gas Fitter Domestic (LPG and Natural Gas)