Rey Diaz
Production Team Lead at DCI Hollow Metal- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
DCI Hollow Metal
-
United States
-
Construction
-
1 - 100 Employee
-
Production Team Lead
-
Aug 2021 - Present
-
-
-
Prime-Line Products
-
United States
-
Wholesale Building Materials
-
1 - 100 Employee
-
Inventory Control Supervisor
-
Aug 2016 - Mar 2021
-
-
-
Consolidated Precision Products Corp
-
United States
-
Aviation and Aerospace Component Manufacturing
-
700 & Above Employee
-
Operations Supervisor
-
Jan 2015 - Feb 2016
• Employed performance improvement, operational performance as well as financial measurement tools to save money and increase output by over 15%. • Converting existing processes into OSHA-compliant, safe work environments through hands-on new hire training of safe and proper operating practices. • Key person overseeing 60+ associates. • Employed performance improvement, operational performance as well as financial measurement tools to save money and increase output by over 15%. • Converting existing processes into OSHA-compliant, safe work environments through hands-on new hire training of safe and proper operating practices. • Key person overseeing 60+ associates.
-
-
-
Vance & Hines
-
United States
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Manufacturing Supervisor
-
Feb 2013 - Jan 2015
• Increasing production output by over 20% utilizing various introduced methodologies including reducing machine downtime & increasing performance utilizing SMED, Kai zen and 5S techniques increasing Company profits by $35,000 quarterly. • Reducing quality defects and rejections by 20% using same tools above. • Documenting tribal knowledge into simple, well-understood & easily followed procedures and diagrams. • Conduct employee evaluations: developing a constructive two-way dialog for process improvements, maximizing employee development and job satisfaction. • Providing hands-on management of 2-shift operation including a staff of 3 leads with over 40 associates. Show less
-
-
-
LISI AEROSPACE
-
France
-
Aviation and Aerospace Component Manufacturing
-
700 & Above Employee
-
Manufacturing Supervisor
-
Jun 2008 - Feb 2012
• Introduced new work flow methods reducing product movement and non-value added steps saving the Company $12,000 annually. • Employed performance improvement, operational performance as well as financial measurement tools to save money and increase output by over 25%. • Utilized Six Sigma methodologies for QC inspections and performed SPC audits. • Key person overseeing 45+ associates with Customer Service, Materials Management Safety and Human Resource. • Introduced new work flow methods reducing product movement and non-value added steps saving the Company $12,000 annually. • Employed performance improvement, operational performance as well as financial measurement tools to save money and increase output by over 25%. • Utilized Six Sigma methodologies for QC inspections and performed SPC audits. • Key person overseeing 45+ associates with Customer Service, Materials Management Safety and Human Resource.
-
-
-
K&N Engineering
-
United States
-
Motor Vehicle Manufacturing
-
300 - 400 Employee
-
Manager
-
Jun 2007 - May 2008
• Responsibilities for 65,000 sq. ft. off site warehouse, managed movement of material to and from main facility, and storage of material. • Developed an idea to eliminate product losses and theft by doing away with yet another storage facility. • Increased the shipping of material by 30% without increasing staffing. • Managed a 3-shift operation, 6 supervisors, drivers and all warehouse workers. • Responsibilities for 65,000 sq. ft. off site warehouse, managed movement of material to and from main facility, and storage of material. • Developed an idea to eliminate product losses and theft by doing away with yet another storage facility. • Increased the shipping of material by 30% without increasing staffing. • Managed a 3-shift operation, 6 supervisors, drivers and all warehouse workers.
-
-
-
Master Halco
-
United States
-
Building Materials
-
400 - 500 Employee
-
Plant Supervisor
-
Apr 2002 - May 2007
• An active resource during the qualification process and implementation of ISO9000. • Employed the use of various performance/operational improvement and financial measurement tools to yield the company $25,000 every quarter. • Met and exceeded production quotas through cooperative efforts with Planning. • Interacted with all aspects of the Company including upper Management, Customer Service, Materials Management, Safety, Maintenance and Human Resources. • Oversaw an operation of 60+ personnel. Show less
-
-
Education
-
Cerritos College
Associate of Arts - AA, Mathematics