Reema Gupta

Legal Contract Manager (Asia) at InvestCloud Private Banking (was Finantix)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Singapore, SG
Languages
  • English -
  • Hindi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Sindu Sreebhavan

I was fortunate to coach Reema in one of our programs. She stood out in the room from everyone else with her ability to connect, contribute and communicate. She is a great team player with amazing leadership skills.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Luxembourg
    • Financial Services
    • 1 - 100 Employee
    • Legal Contract Manager (Asia)
      • Nov 2019 - Present

  • Prominence
    • Singapore
    • Freelance Contract/Bid Proposal Writer
      • 2017 - 2017

    • Singapore
    • Environmental Services
    • 200 - 300 Employee
    • Sr Manager Commercial & Contracts
      • Jan 2016 - Dec 2016

      Contracts Management

    • Sr Manager
      • Jan 2016 - Dec 2016

    • Canada
    • Professional Services
    • 700 & Above Employee
    • Sr. Engineer
      • Oct 2008 - Jan 2016

      Reema Gupta is currently working as Sr. Engineer Civil in the Parsons Brinkerhoff. She has produced the winning proposals in response to RFP. Responsibilities include introduction and implementation of all necessary proposal procedures and processes. This is a highly networked role in Asia pacific region. She has shown ability to work under pressure and to demanding deadlines. She has been providing technical support for various projects throughout the tender evaluation phase, the subsequent negotiation phase and also for the implementation phase. She is responsible for review of technical documents/drawings. She has been working in coordinate with clients, local authorities, consultants and contractors as per project requirements. Further she is responsible for civil/structural quality control, progress at site, cost analysis and safety of works. Projects: Pulau Seraya Power Station 2x400MW Cogen Project : Technical design review STAGE II, Unit-4, Boiler structure Assessment and Restoration at Power Seraya Singapore: preparation of technical specifications, review of tender document, coordination with Govt Authorities, Design check. Ras Laffan C Independent Water and Power Project (IWPP): Desalination Plant, Qatar – Vendor drawing review. Show less

    • Asst. manager
      • Oct 2006 - Sep 2008

      Assistant Manager, Civil (October 2006 to September 2008) Cirebon 660 MW Project : Worked as assistant manager to get Construction permits of project. Worked involved included • Preparation of Construction permit document • Review of proposed drawings based on clients requirements. Mundra TPP 4000MW: worked as assistant Manager Civil. Work involved included: • Analysis & design of Boiler Pile Foundation including Pile cap structure. Calculations were done using Staad Pro & SAFE softwares. Odin 700 MW Project: worked as assistant Manager Civil for Proposal Engineering. Work involved included • Preparation of Civil Engineering specifications for the proposal purpose. 700 MW Barka TPP : Worked as senior Engineer. Work involved included: • Preparation of civil/structural detail design calculations of super structure & foundations for Main plant & BOP area which includes TG Building, Workshop & Store Building, Backwash effluent pump building, Backwash equipment pump building, chemical storage building, and cooling water pump station. • Checking & review of detail drawings based on design calculation & other requirements. Jabel Ali M Thermal Power Project : Worked as senior Engineer Work involved included: • Preparation of civil/structural detail design calculations of super structure & foundations for Main plant & BOP area which includes Fire water pump house, Chemical House, Chemical dosing house. • Review of detail drawings based on design calculation & other requirements. • Co-ordination with architectural, mechanical & piping team to check interference Show less

    • Executive Engineer
      • Sep 2005 - Sep 2006

      Executive Engineer, Civil (September 2005 to October 2006) 2 X 250 MW Korba (East) TPS, Unit #1 & 2 Client: Bharat Heavy Electricals Limited : Worked as Executive Engineer for Civil & Architectural Works Work involved included: • Preparation of civil/structural Analysis & detail design calculations of super structure & foundations for CW Pump house, MCC Room and control Room. • Preparation of architectural drawing for CW pump house. • Preparation of civil/structural Analysis & detail design calculations of super structure & foundations for Compressor house building. • Estimation of Material Take Off quantities based on designed components. • Review of Pile cap design calculations for various structures. • Preparation of design & analysis template for combined footing and pile cap design. • Project management LANCO Amarkantak Thermal Power Station – 2 X 300 MW (Units – 1&2) Pathadi Village, Korba: Worked as Executive Engineer for Civil & Architectural works. Work involved included: • Preparation of civil/structural Analysis & detail design calculations of super structure & foundations for Chemical house building. • Estimation of Material Take Off quantities based on designed components. • Preparation of design & analysis template for combined footing and pile cap design. • Project management Show less

    • Civil Engineer
      • May 2003 - Sep 2005

      Engineer Civil (May2003 to Sep. 2005) Worked on project: • Consultancy services for Feasibility Study and Detailed Project Report for 4/6 laning of selected project under Group-A of NHDP-II Jhansi to Lalitpur section of NH-26 from km 0 to km 92 in the State of U.P. (Contract Package No. C-II A/1) - (ADB funded). Client: NHAI. Cost of the Project: Rs 5219.14 Million. • Consultancy Services for Detailed Project Report for rehabilitation and strengthening of existing 2 lane road and widening to 4/6 lane dual carriageway configuration of Lakhnadon – MP/MH border section (km 544/0 to km 652/0) of NH-7 in the state of MP, Cost of the Project: RS. 5109.287 million. • Preparation of Detailed Project report for Rehabilitation and Strengthening of existing 2 lane road and widening to 4/6 lane dual carriageway configuration of Agra – Bharatpur – Mahwa section km 0 to km 118 of NH-11 in the state of UP and Rajasthan. Cost of the Project – Rs. 4040 million. • Preparation of Detailed Project Report for rehabilitation and strengthening of existing 2 lane road and widening to 4/6 lane dual carriageway configuration of Mahwa – Jaipur section km 118 to km 233 of NH-11 in the state of Rajasthan. Cost of the Project – Rs. 4530 million. • Preparation of Detailed Project Report for rehabilitation and strengthening of existing 2 lane road and widening to 4/6 lane dual carriageway configuration of Raipur – Pithora section from km 282 to km 172 of NH-6 in the state of Chhattisgarh. Cost of the Project: Rs. 4670 million. (From Mar. 2002 to Mar. 2003). Show less

    • Civil Engineer
      • Jun 2000 - Mar 2001

      Took up the contracts for design of two multi-storeyed framed structure Residential Buildings and delivered the services to the entire satisfaction of the clients. Took up the contracts for design of two multi-storeyed framed structure Residential Buildings and delivered the services to the entire satisfaction of the clients.

Education

  • Malaviya National Institute of Technology Jaipur
    M.Tech., Structural Engineering
    2001 - 2003
  • Punjab Technical University
    B.Tech., Civil Engineering
    1996 - 2000
  • Malaviya National Institute of Technology Jaipur
    Master of Technology - MTech, Civil Engineering Technologies/Technicians
    2001 - 2003

Community

You need to have a working account to view this content. Click here to join now