Redner Africa

Sr. Electrical Engineer at Mosaique Headhunting & Consulting
  • Claim this Profile
Contact Information
Location
NO

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Sr. Electrical Engineer
      • Nov 2022 - Present
    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Sr. Electrical Engineer
      • Mar 2020 - Oct 2022
    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Sr. Electrical Engineer
      • Jun 2019 - Mar 2020
    • United States
    • Oil and Gas
    • 100 - 200 Employee
    • Electrical Engineer
      • Aug 2018 - May 2019
    • Electrical Engineer
      • Dec 2015 - Jul 2017

      Project : GINA KROG FSO Project : GINA KROG FSO

    • United Kingdom
    • Oil and Gas
    • 200 - 300 Employee
    • Electrical Engineer
      • Nov 2014 - Sep 2015

      Project : Western Isles Development Project (WIDP) FPSO Representing the Owner as Electrical Engineer, my main responsibility is to check the electrical engineering deliverables of the Main Contractor / Shipyard (COSCO) and Package/Equipment Vendors according to BS, IEC, DNV and DANA standards. Specifically : • Prepare Voltage Drop Calculation, Cable Sizing Calculation, Breaker/Fuse Sizing Calculation of the MV (11kV) and LV (690V, 400V and 230V) System • Review and Checking of the Single Line Diagrams, Interconnection Diagrams, Control Schematics, Cable Block Diagrams, Wiring Diagrams, Loop Diagrams, Interface Diagrams, Cable Schedule, Overall Earthing Diagram • Review and Checking of Lighting and Small Power - Cable Schedule, Layout, and Single Line Diagram Discrepancies - Circuit impedance verification and Short Circuit Calculation • Review and Checking of Vendor Packages - Electrical Power Package (MV/LV Switchboards, Lighting and Small Power System, MV / LV Transformers, MV / LV Motors) - Mechanical Packages (Electrical Content and Interface) • Review of Design Philosophy : - Cable Selection Philosophy, Cable Gland Management Procedure, Electrical System Description, General Technical Specification for Equipment • Review of Safety Automation System (SAS) - Discrepancies between Power Distribution and Control System (PDCS) Wiring Diagrams and Cabinet GA / Layout, I/O List, SAS Topology - Electrical Control Typicals for SAS • Site Inspection, Progress Monitoring, Red Line Mark Ups for As Built Purposes • Review Instrument Documentations for proper Electrical Interface with regards to PSD, ESD, PCS, Fire & Gas etc • Coordination with Main Contractor / Shipyard, Construction Department, Commissioning Department etc with regards to Electrical Engineering issues Show less

    • Sr. Electrical Project Engineer (Electrical Package / Electrical Equipment)
      • May 2012 - Oct 2014

      Project : ODFJELL # 3 – H3033 (DRILL SHIP – SEMI SUB) ATWOOD # 3 – H3619 (DRILL SHIP) / ATWOOD # 4 – H3622 (DRILL SHIP) • Manage all aspects of Electrical Engineering in the design of (1) Low Voltage (690V, 440V and 230V ) Electrical Power Distribution System, Switchboard, and Intelligent MCC, (2) MV Dry Type Transformer • Supervise contractor’s execution of engineering design, equipment fabrication and testing • Review of Electrical Engineering Deliverables : (1)General Arrangement Drawing, (2)Single Line Diagrams, (3) Typical Schematic Drawings, (4) Circuit Diagrams, (5) Ring Loop Drawings, (6) Component List • Coordinate with customers, suppliers, principals, surveyors and 3rd party inspectors on project requirement • Organise production documents packages for internal use and customers • Assist factory during engineering, production, internal testing of equipment, Factory Acceptance Test (FAT), and Site Acceptance Test (SAT) which are all done overseas • Monitor and expedite module fabrication, inspection, supply and delivery to the Construction Site, ensuring technical, quality, cost and schedule issues are properly resolved • Plan and control project schedule and costing as per contractual delivery time and cost budget established for the projects • Raise project variation to customer and negotiate change orders • Act as a single contact with customer during project execution and consolidate technical and commercial issues for coordination • Support the Client Completions Team ensuring punch listing and pre-commissioning activities are carried out effectively and Handover documentation delivered as needed Show less

    • Electrical Engineer
      • Sep 2010 - May 2012

      Project : BW JOKO TOLE (FPU) • Prepare Voltage Drop Calculation, Cable Sizing Calculation, Breaker/Fuse Sizing Calculation, (MARINE SIDE) o MV (6.6kV) and LV (440V and 220V) System • Prepare Single Line Diagrams, Interconnection Diagrams, Control Schematics, Cable Block Diagrams, Wiring Diagrams, Loop Diagrams, Interface Diagrams, using AutoCAD LT 2011 for the following Electrical Items: o 6.6kV MV Switchgear o 440V Normal LV Switchgear / 440V Emergency Switchboard / 440V Essential LV Switchgear o UPS System o 440V Laundry Distribution Board / 440V Workshop Distribution Board / 440V Galley Distribution Board o 220V Lighting and Small Power Distribution Boards o HP Compressor / LP Compressor (by SOLAR) o SUBSEA System o LIFEBOAT and FRC System o Helicopter Re-Fuelling / De-Fuelling System o Navigational Aids System o Lighting and Small Power • Prepare General Arrangement Drawing and/or Layout Drawing, specifically for: o MV (6.6kV) and LV (440V and 220V) Switchboards o Lighting and Small Power o Distribution Boards o Hazardous Area o Engine Room Cable Ladder o Multi Cable Transit o Electrical Equipment for Switchgear Room, Engine Control Room o Earthing System • Prepare Typical Installation Details, specifically for: o Earthing System o Motor Local Control Station • Prepare Lighting MTO, Lighting and Small Power Load Balancing • Review / Check Instrument Department’s Termination / Block Diagram for the proper Electrical Interface with regards to ICSS (PSD, ESD, PCS, Fire and Gas, etc) • Assist in the preparation of Electrical Cable Schedule, Protection Devices Setting Table • Review Vendor Documents and incorporate all the necessary information to the Company’s Electrical Deliverables • Perform progress reporting on design and drafting activities • Ensure consistency and integrity of electrical design throughout the project and reviewing design for logic, functionality and completeness Show less

    • Electrical Engineer II
      • Aug 2008 - Aug 2010

      Project : TUPI (FPSO) • Review Vendor Documents and incorporate all the necessary information to the Company’s Electrical Deliverables • Prepare Voltage Drop Calculation, Cable Sizing, Cable Schedule for the different Modules of the FPSO Vessel • Prepare Single Line Diagrams, Interconnection Diagrams, Control Schematics, Cable Block Diagrams, Wiring Diagrams, Interface Diagrams of MV/LV Switchboards, Distribution Boards, Electrical Panels etc, using the latest version of AUTO CAD • Coordinate with other disciplines, vendors, clients with regards to Electrical Concerns of the Project Show less

    • Electrical Engineer
      • Jun 2005 - Aug 2008

      Project : Various on-shore Projects (EPC) • Equipment Modeling of the Lighting System of the Project using PDMS (AVEVA) software • Design of Electrical Drawing specifically: Lighting, Power, Grounding, Area Classification, Connection Diagram, Single Line Diagram, Electrical Cable Tray, Material Take-off • Preparation of Drafting works related to P&ID Diagram, Graphics Diagram • Preparation of Multi Cable Transit Arrangement • Preparation of MTO for Electrical Cables • Attend to the activity of Subcontractor with regards to Electrical System Construction, Pre-Commissioning and Commissioning specifically on the field of Grounding, Lighting, Power, and Substation • Witness Electrical Test Inspection as per Client Specification and Standards specifically; (1)Insulation Resistance Test for motors, generators, and LV/MV cables, (2) Winding Resistance Test, (3) Phase Rotation Check etc etc • Prepare Cable Pulling Schedule of Electrical System • Coordination with Client, Subcontractors, Vendors and other Disciplines with regards to the Electrical System of the Plant • Responsible for electrical construction’s progress monitoring. Show less

    • United States
    • 1 - 100 Employee
    • Staff Electrical Engineer
      • Aug 2004 - Jun 2005

      • Responsible for the Quality Assurance of the “Incoming System” of the Company • Assist the supervisor/Assistant Supervisor on the control , evaluation , and inspection of parts and evaluation sample for approval • Responsible for the Quality Assurance of the “Incoming System” of the Company • Assist the supervisor/Assistant Supervisor on the control , evaluation , and inspection of parts and evaluation sample for approval

Education

  • Batangas State University
    Bachelor of Science in Electrical Engineering, Electrical Engineering
    1999 - 2004

Community