Matt Jordan
Director at Road and Civil Surveys- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Jayant Pattekar
Matt is a very skilled Surveyor. He managed all survey functions for the Great Wetern Highway Upgrade (Bullaburra East) project from 2013 to 2015 and always demonstrated a very flexible approach to meeting the project's goals . Matt is a conscientious, reliable, diligent and customer-oriented professional who always gives his 100% in everything he does. He takes the time out to truly understand issues, is effective in engaging the right resources and delivers results. A hard worker and wonderful team player. I would have no hesitation recommending his experience and expertise to any organisation looking for someone who can deliver the goods
Jayant Pattekar
Matt is a very skilled Surveyor. He managed all survey functions for the Great Wetern Highway Upgrade (Bullaburra East) project from 2013 to 2015 and always demonstrated a very flexible approach to meeting the project's goals . Matt is a conscientious, reliable, diligent and customer-oriented professional who always gives his 100% in everything he does. He takes the time out to truly understand issues, is effective in engaging the right resources and delivers results. A hard worker and wonderful team player. I would have no hesitation recommending his experience and expertise to any organisation looking for someone who can deliver the goods
Jayant Pattekar
Matt is a very skilled Surveyor. He managed all survey functions for the Great Wetern Highway Upgrade (Bullaburra East) project from 2013 to 2015 and always demonstrated a very flexible approach to meeting the project's goals . Matt is a conscientious, reliable, diligent and customer-oriented professional who always gives his 100% in everything he does. He takes the time out to truly understand issues, is effective in engaging the right resources and delivers results. A hard worker and wonderful team player. I would have no hesitation recommending his experience and expertise to any organisation looking for someone who can deliver the goods
Jayant Pattekar
Matt is a very skilled Surveyor. He managed all survey functions for the Great Wetern Highway Upgrade (Bullaburra East) project from 2013 to 2015 and always demonstrated a very flexible approach to meeting the project's goals . Matt is a conscientious, reliable, diligent and customer-oriented professional who always gives his 100% in everything he does. He takes the time out to truly understand issues, is effective in engaging the right resources and delivers results. A hard worker and wonderful team player. I would have no hesitation recommending his experience and expertise to any organisation looking for someone who can deliver the goods
Experience
-
Road & Civil Surveys
-
Australia
-
Construction
-
1 - 100 Employee
-
Director
-
Jan 2016 - Present
Providing Surveying services to Civil Infrastructure projects across NSW Providing Surveying services to Civil Infrastructure projects across NSW
-
-
-
Geotwin
-
Australia
-
Civil Engineering
-
Director
-
Jun 2022 - Present
Providing accurate digitisation of land and structural assets Providing accurate digitisation of land and structural assets
-
-
-
Seymour Whyte
-
Australia
-
Civil Engineering
-
500 - 600 Employee
-
Senior Project Surveyor
-
Oct 2015 - Jan 2016
Project highlights;-Construction of 5.5km 6 lane divided carriageway between Camden Valley Way, Narellan and Blaxland Road, Campbelltown- Project value >$60 million -Provide Accurate Setout of Retaining walls, Local and RMS pavement construction, Shared path/ driveways, Drainage culverts/GPT's/pits, Kerb alignments, Utility alignments, Bulk earthworks,Cable Stay Pedestrian bridge over Hume Highway, Widening current bridge over Hume Highway, 2 new bridges over heritage culvert & new Signalised Intersections -Daily monitoring of heritage culvert for water NSW around bridge works -Liaise with RMS team and Engineers on Design changes.-Management of SWC, subcontract & RMS joint surveyors to ensure survey requirements are met with day to day site activities/reporting/lot closures -Interpret and modify multiple Data models to suit project needs-Draft Cross sections & Long sections for planning activities -Create drainage/ pavement/ batter/ retaining wall footing 3D models for Machine control systems-Setup and Maintain GPS Machine guidance systems (Topcon, Leica and Trimble equipped excavators and graders) -End of month Quantity/Area calculations and reporting -Set out and Conformance Reporting on works (RMS specifications - G71)- Project earthworks modeling for Cut/Fill Volume Calculations for staging -Management of Survey Control Network to ensure G71 requirements are me -Maintain up to date utility asbuits for DIG permits -Management of subcontractors and General works personal to ensure works are correctly executed to meet project conformance criteria -Work hand in hand with SWC team to deliver job accurately, efficiently and safely
-
-
Senior Project Surveyor
-
Jul 2015 - Oct 2015
Calculation of R44 Quantities and Various Pavement/Cut/Fill Areas for Estimation team.Assist on site survey requirements on various projects
-
-
Senior Project Surveyor
-
Feb 2013 - Jul 2015
Construction of 1.6km dual carriageway- Great Western Highway, Bullaburra NSWProject value $49 million -Provide Accurate Setout of Retaining walls, Local and RMS pavement construction, Shared path/ driveways, Drainage culverts/GPT's/pits, Lot Boundaries, Kerb alignments, Utility alignments, Bulk earthworks, Structures, Pedestrian Bridge, RailCorp viewing platform, Signalised Intersections -Liaise with RMS team and Engineers on Design changes.-Management of SWC and Subcontract surveyors to ensure survey requirements are met with day to day site activities/reporting/lot closures -Interpret and modify multiple Data models to suit survey needs-Draft Cross sections & Long sections for planning activities -Create drainage/ pavement/ batter/ retaining wall footing 3D models for Machine control systems-Create data sets for Paveset asphalt operations.-Setup and Maintain GPS Machine guidance systems (Topcon, Leica and Trimble equipped excavators and graders) -Setup and Maintain UTS Machine guidance systems (Trimble SPS 730/ Komatsu & Volvo Graders)-Setup and Maintain MMGPS grading systems (Topcon/14H grader) -End of month Quantity/Area calculations and reporting -Set out and Conformance Reporting on works (RMS specifications - G71)-Cut/Fill Volume Calculations for staging -Management of Survey Control Network-Maintain up to date utility asbuits for DIG permits -Management of subcontractors and General works personal -Work hand in hand with SWC team to deliver job accurately, efficiently and safely
-
-
-
-
Project Surveyor (contract)
-
May 2012 - Jan 2013
-Management of control network-Setup and maintain GPS Machine guidance systems (Trimble equipped dozers and graders) -Design change proposals -End of month reporting -Volume calculations-Asbuilt surveys on works-FIFO work roster -Management of control network-Setup and maintain GPS Machine guidance systems (Trimble equipped dozers and graders) -Design change proposals -End of month reporting -Volume calculations-Asbuilt surveys on works-FIFO work roster
-
-
-
-
Project Surveyor
-
Jun 2011 - May 2012
-Sub contractor to Burton Civil Contractors-Setup and Maintain GPS Machine guidance systems (Trimble & Topcon)-Set out Retaining walls, Pavements, Drainage, Lot Boundaries, Kerb lines, Utilities, Bulk earthworks, Structures, Bridges,Culverts-Setup and Maintain GPS Machine guidance systems (Trimble & Topcon)-E.O.M Reporting-Set out and Conformance Reporting on works (RMS specifications - G71/R44 standards)-Volume Calculations-Management of Control Network-Part of Design and Construction of Rail Embankment at Boral Limestone quarry - Marulan NSW
-
-
-
RPS
-
United Kingdom
-
Business Consulting and Services
-
700 & Above Employee
-
Surveyor
-
Oct 2006 - Apr 2011
-As constructed surveys on Subdivisions -Identification, Topo, Pre pour surveys-Install and Survey State Survey Marks-Use of RTK GPS systems -As constructed surveys on Subdivisions -Identification, Topo, Pre pour surveys-Install and Survey State Survey Marks-Use of RTK GPS systems
-
-
Education
-
TAFE
Diploma of Surveying -
Broughton Anglican College
HSC