Matt Jordan

Director at Road and Civil Surveys
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bowral, New South Wales, Australia, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Jayant Pattekar

Matt is a very skilled Surveyor. He managed all survey functions for the Great Wetern Highway Upgrade (Bullaburra East) project from 2013 to 2015 and always demonstrated a very flexible approach to meeting the project's goals . Matt is a conscientious, reliable, diligent and customer-oriented professional who always gives his 100% in everything he does. He takes the time out to truly understand issues, is effective in engaging the right resources and delivers results. A hard worker and wonderful team player. I would have no hesitation recommending his experience and expertise to any organisation looking for someone who can deliver the goods

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 1 - 100 Employee
    • Director
      • Jan 2016 - Present

      Providing Surveying services to Civil Infrastructure projects across NSW Providing Surveying services to Civil Infrastructure projects across NSW

    • Australia
    • Civil Engineering
    • Director
      • Jun 2022 - Present

      Providing accurate digitisation of land and structural assets Providing accurate digitisation of land and structural assets

    • Australia
    • Civil Engineering
    • 500 - 600 Employee
    • Senior Project Surveyor
      • Oct 2015 - Jan 2016

      Project highlights;-Construction of 5.5km 6 lane divided carriageway between Camden Valley Way, Narellan and Blaxland Road, Campbelltown- Project value >$60 million -Provide Accurate Setout of Retaining walls, Local and RMS pavement construction, Shared path/ driveways, Drainage culverts/GPT's/pits, Kerb alignments, Utility alignments, Bulk earthworks,Cable Stay Pedestrian bridge over Hume Highway, Widening current bridge over Hume Highway, 2 new bridges over heritage culvert & new Signalised Intersections -Daily monitoring of heritage culvert for water NSW around bridge works -Liaise with RMS team and Engineers on Design changes.-Management of SWC, subcontract & RMS joint surveyors to ensure survey requirements are met with day to day site activities/reporting/lot closures -Interpret and modify multiple Data models to suit project needs-Draft Cross sections & Long sections for planning activities -Create drainage/ pavement/ batter/ retaining wall footing 3D models for Machine control systems-Setup and Maintain GPS Machine guidance systems (Topcon, Leica and Trimble equipped excavators and graders) -End of month Quantity/Area calculations and reporting -Set out and Conformance Reporting on works (RMS specifications - G71)- Project earthworks modeling for Cut/Fill Volume Calculations for staging -Management of Survey Control Network to ensure G71 requirements are me -Maintain up to date utility asbuits for DIG permits -Management of subcontractors and General works personal to ensure works are correctly executed to meet project conformance criteria -Work hand in hand with SWC team to deliver job accurately, efficiently and safely

    • Senior Project Surveyor
      • Jul 2015 - Oct 2015

      Calculation of R44 Quantities and Various Pavement/Cut/Fill Areas for Estimation team.Assist on site survey requirements on various projects

    • Senior Project Surveyor
      • Feb 2013 - Jul 2015

      Construction of 1.6km dual carriageway- Great Western Highway, Bullaburra NSWProject value $49 million -Provide Accurate Setout of Retaining walls, Local and RMS pavement construction, Shared path/ driveways, Drainage culverts/GPT's/pits, Lot Boundaries, Kerb alignments, Utility alignments, Bulk earthworks, Structures, Pedestrian Bridge, RailCorp viewing platform, Signalised Intersections -Liaise with RMS team and Engineers on Design changes.-Management of SWC and Subcontract surveyors to ensure survey requirements are met with day to day site activities/reporting/lot closures -Interpret and modify multiple Data models to suit survey needs-Draft Cross sections & Long sections for planning activities -Create drainage/ pavement/ batter/ retaining wall footing 3D models for Machine control systems-Create data sets for Paveset asphalt operations.-Setup and Maintain GPS Machine guidance systems (Topcon, Leica and Trimble equipped excavators and graders) -Setup and Maintain UTS Machine guidance systems (Trimble SPS 730/ Komatsu & Volvo Graders)-Setup and Maintain MMGPS grading systems (Topcon/14H grader) -End of month Quantity/Area calculations and reporting -Set out and Conformance Reporting on works (RMS specifications - G71)-Cut/Fill Volume Calculations for staging -Management of Survey Control Network-Maintain up to date utility asbuits for DIG permits -Management of subcontractors and General works personal -Work hand in hand with SWC team to deliver job accurately, efficiently and safely

    • Project Surveyor (contract)
      • May 2012 - Jan 2013

      -Management of control network-Setup and maintain GPS Machine guidance systems (Trimble equipped dozers and graders) -Design change proposals -End of month reporting -Volume calculations-Asbuilt surveys on works-FIFO work roster -Management of control network-Setup and maintain GPS Machine guidance systems (Trimble equipped dozers and graders) -Design change proposals -End of month reporting -Volume calculations-Asbuilt surveys on works-FIFO work roster

    • Project Surveyor
      • Jun 2011 - May 2012

      -Sub contractor to Burton Civil Contractors-Setup and Maintain GPS Machine guidance systems (Trimble & Topcon)-Set out Retaining walls, Pavements, Drainage, Lot Boundaries, Kerb lines, Utilities, Bulk earthworks, Structures, Bridges,Culverts-Setup and Maintain GPS Machine guidance systems (Trimble & Topcon)-E.O.M Reporting-Set out and Conformance Reporting on works (RMS specifications - G71/R44 standards)-Volume Calculations-Management of Control Network-Part of Design and Construction of Rail Embankment at Boral Limestone quarry - Marulan NSW

    • United Kingdom
    • Business Consulting and Services
    • 700 & Above Employee
    • Surveyor
      • Oct 2006 - Apr 2011

      -As constructed surveys on Subdivisions -Identification, Topo, Pre pour surveys-Install and Survey State Survey Marks-Use of RTK GPS systems -As constructed surveys on Subdivisions -Identification, Topo, Pre pour surveys-Install and Survey State Survey Marks-Use of RTK GPS systems

Education

  • TAFE
    Diploma of Surveying
    2007 - 2010
  • Broughton Anglican College
    HSC
    1998 - 2006

Community

You need to have a working account to view this content. Click here to join now