Razvan Stanescu

Site Supervisor at SYNERGY CONSTRUCT SRL
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Romania, RO
Languages
  • Engleză Professional working proficiency
  • Romanian Native or bilingual proficiency
  • French Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Authorization - Chartered Surveyor
    ANCPI
    Mar, 2013
    - Nov, 2024
  • CSCS - Black Card, Construction Site Manager Cntrctg NVQ Level 6 DIploma
    Construction Skills Certification Scheme (CSCS)
    Jan, 2018
    - Nov, 2024

Experience

    • Romania
    • Construction
    • 200 - 300 Employee
    • Site Supervisor
      • Sep 2019 - Present

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Project Engineer
      • Oct 2018 - Apr 2019

    • Senior Construction Manager
      • Jan 2018 - Oct 2018

      Tottenham stadium HOTSPUR - new stadium with over 60.000 seats. Tottenham stadium HOTSPUR - new stadium with over 60.000 seats.

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Senior Site Engineer
      • Jun 2017 - Jan 2018

      Newfoundland project - facade package, 68 storyes residential building ( contracting ) Newfoundland project - facade package, 68 storyes residential building ( contracting )

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Chief Surveyor - Contract
      • Mar 2017 - Jan 2018

      Greenwich Creekside - It’s the first of its kind in UK, to be a 21 story building constructed of modular units. Greenwich Creekside - It’s the first of its kind in UK, to be a 21 story building constructed of modular units.

    • United Kingdom
    • Construction
    • 200 - 300 Employee
    • Senior Surveyor
      • Aug 2016 - Feb 2017

    • Surveyor
      • Aug 2015 - Aug 2016

       Setting out facilities, Surveys, work with total station (Leica TS15,TS16, TM30). As built plans, Stake out grids, levels, Land Survey Setting out chainage, drainage, steel work, frame work , rail position and level. Control network and monitoring. Setting out the chainage of the rails, offsets for cut, analyze the datas before and after pour concrete.  Setting out the welding points and gaps. Checking the quality of the works ( dig, steel, concrete, rail). Use of drawings for quality control.Process raw data for control network ( traverse files from TS and level files)

    • Manager
      • Mar 2013 - Feb 2016

      PFA STANESCU RAZVAN STEFAN - Land services,Legal mapping, Surveying and Geodesy, Setting out PFA STANESCU RAZVAN STEFAN - Land services,Legal mapping, Surveying and Geodesy, Setting out

    • Germany
    • Environmental Services
    • 1 - 100 Employee
    • Chief Surveyor
      • Apr 2014 - May 2015

      Implementing network control, process it and update it as needed.Setting out all the elements on the site from dig areas to finished building. Survey and process as built drawings. Supervisory rehabilitation of wastewater treatment in Campina, Plopeni, Sinaia - the structure, the share of the foundation, building making, formwork and reinforcement; Checking the correctness of projects, construction drawing, finding constructive solutions in design mistakes, calculation of volumes and materials, execution of construction supervision, drawing pipes, level issues; High precision imposed.

    • Survey Engineer
      • Oct 2008 - Jan 2010

      Company activity field: Preparing plans for architecture necessary authorizations issued building / demolition / expansion, development PUZ / PUD / PUG.Responsibilities:Making topographical surveys, control networks, setting out site, drawing up plans situation, perform acurate surveying, performing stakeout on construction sites, assistance in carrying out construction, determining the necessary level allowance constructive elements, calculating volumes. Autocad drafting plans for these works, preparing documentation for obtaining approvals and obtaining them. Preparing documentation for issuing building permits and certificates of planningRecommendations: ARH. DIANA ROMANAchievements: I managed to finish all work without encountering problems without or delays.

    • Surveyor - Team leader
      • Nov 2006 - Oct 2008

      Department: EngineeringCompany activity field: Design channels of communication and utility installations, setting out sites, measurements and land cadastre, geodesy, GPS, control networks, monitoring..Responsibilities:Execution of raw data measurements, identifying sites and construction elements, coordination of other employees.Recommendations: Tehnical Manager - Virgil Nanu, General Manager - Ovidiu Negreanuachievements:We conducted measurements for the following clients: Romtelecom, ERICSSON TELECOMMUNICATIONS ROMANIA, HELLASCOM A. E., MOBIFON, INTRAROM, INTRACOM, COSMOTE ROMANIAN MOBILE TELECOMMUNICATION, COMBRIDGE, PRIME TELECOM, ORANGE, ALCATEL.We have executed design work in concept design phaserelocation and / or impairment of sharing utilities construction detour variant Medias on DN14 national road section bypassing the municipality Medias - beneficiary Tractebel Project - Managers, Engineers & Consultants.I realized / updated general urban plans and local urban planning regulations for a total of 40 municipalities in the county of Prahova and Focsani.Development of cadastral plans for Alcatel for fiber optic Orange Romania.We realized technical documentation - topographical survey related variants roads for cities Alesd-Beius and Stei, Bihor county., And Husi Vaslui County. Vaslui, Tractebel Engineering beneficiary S.A

Education

  • University of Bucharest
    Bachelor’s Degree, Geomatics and Cadastre Land Measurements, Land Survey
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now