Credentials

  • BTech National Certificate
    Colchester Institute
    Jul, 1994
    - Sep, 2024
  • NVQ Level 2 Bricklaying
    CITB
    Feb, 1993
    - Sep, 2024
  • Carpentry & Woodworking Programme
    Portals Training
    Nov, 1990
    - Sep, 2024
  • SMSTS
    CITB
    Jul, 2012
    - Sep, 2024
  • CSCS (Black card)
    CITB
    Aug, 2012
    - Sep, 2024
  • Emergency First Aid at Work
    Nuco Training
    Jul, 2013
    - Sep, 2024
  • PASMA (Tower)
    PASMA
    May, 2009
    - Sep, 2024

Experience

    • United Kingdom
    • Staffing and Recruiting
    • 1 - 100 Employee
    • Construction Site Manager
      • Jan 2015 - Present

      Responsible for helping to run sites for several constructions companies, namely Beardswell, Guildmore, Crest Homes and David Wilson Homes. Responsible for helping to run sites for several constructions companies, namely Beardswell, Guildmore, Crest Homes and David Wilson Homes.

    • United Kingdom
    • Construction
    • Director
      • Jan 2010 - Apr 2013

      Established my own company after being made redundant from ROK Group. The work carried out has included fitting kitchens and bathrooms, tiling, painting and decorating, garden fencing and general building works. Established my own company after being made redundant from ROK Group. The work carried out has included fitting kitchens and bathrooms, tiling, painting and decorating, garden fencing and general building works.

    • Jersey
    • Construction
    • 1 - 100 Employee
    • Site Manager
      • Sep 2008 - Dec 2009

      A new build project costing £1m. My remit was to manage and oversee all the works from ground to finish and sign off to the client. The building comprised of 3 classrooms with toilets and a linked corridor to the old school, finished with a staggered pitch aluminium roof and a canopy to the entrance. A new build project costing £1m. My remit was to manage and oversee all the works from ground to finish and sign off to the client. The building comprised of 3 classrooms with toilets and a linked corridor to the old school, finished with a staggered pitch aluminium roof and a canopy to the entrance.

    • France
    • Spectator Sports
    • Site Manager (Freelance)
      • Mar 2008 - Jun 2008

      Holiday cover for the following Companies.Birse MetroWillmott DixonBovis Lend Lease Holiday cover for the following Companies.Birse MetroWillmott DixonBovis Lend Lease

    • Site Manager
      • Mar 2005 - Dec 2007

      This was a joint venture under the PPP Contract between Engenica, EDF, Balfour Beatty and Atkins. Seconded to Balfour Beatty, I oversaw the refurbishment of a number of Train Stations for the London Underground, including Queensway Station and Shepherd’s Bush Station. This was a joint venture under the PPP Contract between Engenica, EDF, Balfour Beatty and Atkins. Seconded to Balfour Beatty, I oversaw the refurbishment of a number of Train Stations for the London Underground, including Queensway Station and Shepherd’s Bush Station.

    • Italy
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Site Manager (Freelance)
      • Sep 2004 - Mar 2005

      2m project. I was the Site Manager with a Company who won the contract to convert 3 floors from office space, into classrooms. The contract included installing M/F partition walls and to the first floor rooms on the face side of the Atrium, new glass walls and ceilings, new M/E and IT dado in each classroom and a new cafeteria and seating area for the students in the Atrium. 2m project. I was the Site Manager with a Company who won the contract to convert 3 floors from office space, into classrooms. The contract included installing M/F partition walls and to the first floor rooms on the face side of the Atrium, new glass walls and ceilings, new M/E and IT dado in each classroom and a new cafeteria and seating area for the students in the Atrium.

    • France
    • E-Learning Providers
    • Site Manager (Freelance)
      • Mar 2004 - Sep 2004

      500k installation of a BT Communications room in Cambridge. This was a predominantly M/E fit out. The client was BT, who wanted to install a new BT 21st Century Comms Room. The project involved installing new under floor trays to carry the cables for the new UPS and LV units. Three new Air Handling Units were installed to counter the heat from the LV units. During the project a number of asbestos panels were discovered and removed according to CDM Regulations. 500k installation of a BT Communications room in Cambridge. This was a predominantly M/E fit out. The client was BT, who wanted to install a new BT 21st Century Comms Room. The project involved installing new under floor trays to carry the cables for the new UPS and LV units. Three new Air Handling Units were installed to counter the heat from the LV units. During the project a number of asbestos panels were discovered and removed according to CDM Regulations.

    • Site Manager
      • Sep 2003 - Feb 2004

      1.2m refurbishment of a Tesco Store in Cambridge.Managing the site labour, coordinating the night shift works. Liaising with the Tesco Management staff and making sure the project was running to time and budget. 1.2m refurbishment of a Tesco Store in Cambridge.Managing the site labour, coordinating the night shift works. Liaising with the Tesco Management staff and making sure the project was running to time and budget.

    • Site Manager
      • Oct 2002 - Sep 2003

      £18m construction of new student accommodation block in Colchester. Responsible for the external work & dealing with the sub-contractors. £18m construction of new student accommodation block in Colchester. Responsible for the external work & dealing with the sub-contractors.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Site Manager (Freelance)
      • Apr 2002 - Oct 2002

      500K refurbishment of flats on a social housing estate in Plumstead. Responsible for the groundwork, entry systems & replacement windows and also coordinating access to the tenants flats. 500K refurbishment of flats on a social housing estate in Plumstead. Responsible for the groundwork, entry systems & replacement windows and also coordinating access to the tenants flats.

    • United States
    • Site Manager (Hays)
      • May 2001 - Aug 2001

      This was cover for the perminent site manager for a £11m planned social housing refurbishment in Brixton, London. I was tasked with coordinating the subcontractors to carry out works in each flat. Each flat had a detailed list of planned works. These included new bathroom suites, new kitchen units, new flooring, minimum electrical outlets to each room. I also coordinated access to the tenants' flats. The budget included the refurbishment of the roof to each block of flats. This was cover for the perminent site manager for a £11m planned social housing refurbishment in Brixton, London. I was tasked with coordinating the subcontractors to carry out works in each flat. Each flat had a detailed list of planned works. These included new bathroom suites, new kitchen units, new flooring, minimum electrical outlets to each room. I also coordinated access to the tenants' flats. The budget included the refurbishment of the roof to each block of flats.

    • Site Manager (Freelance)
      • Jun 2000 - May 2001

      £300k Refurbishment for EEF Boardroom in London.This was a refurbishment contract of an old conference room, which was completely stripped out and built up from the floor. This included panelled walls with blue glass reveals, leading up to a coffered ceiling with floating panels. At the north end of the room was an audio visual wall controlled by a free standing mobile lectern, which controlled the lights and automatic blinds. £300k Refurbishment for EEF Boardroom in London.This was a refurbishment contract of an old conference room, which was completely stripped out and built up from the floor. This included panelled walls with blue glass reveals, leading up to a coffered ceiling with floating panels. At the north end of the room was an audio visual wall controlled by a free standing mobile lectern, which controlled the lights and automatic blinds.

    • United States
    • Construction
    • 1 - 100 Employee
    • Site Manager (Freelance)
      • Jan 2000 - Jun 2000

      £1m Refit of the Hilton International Hotel in London.Refurbishment of two and a half floors of the Hilton Hotel. The sixth floor was the first to be completed, which comprised of stripping out the existing rooms, first fix electrical, then dry lining the walls, second fix electrical and carpentry, installing air conditioning units in each room. New furniture was then arranged in each room. The second floor underwent the same works. £1m Refit of the Hilton International Hotel in London.Refurbishment of two and a half floors of the Hilton Hotel. The sixth floor was the first to be completed, which comprised of stripping out the existing rooms, first fix electrical, then dry lining the walls, second fix electrical and carpentry, installing air conditioning units in each room. New furniture was then arranged in each room. The second floor underwent the same works.