Raviteja Kala

Assistant Manager at Apraava Energy
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Hyderabad, Telangana, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Utilities
    • 300 - 400 Employee
    • Assistant Manager
      • Jun 2020 - Present

      ✓ Techno-commercial due diligence for PV solar Plants for acquisition. ✓ PV plant Data Analytics ✓ Prepare and submit annual CAPEX & OPEX budget figures for all assets and monthly track of it to senior management. ✓ OMS Contract management & ensure the timely deliver the Asset management requirements ✓ Implementation of different module cleaning technics Dry & Wet ( Solabot, Nucca, Energy Guru, Airtuch).✓ MIS, Report generation, Record maintenance ✓ Techno-commercial due diligence for PV solar Plants for acquisition. ✓ PV plant Data Analytics ✓ Prepare and submit annual CAPEX & OPEX budget figures for all assets and monthly track of it to senior management. ✓ OMS Contract management & ensure the timely deliver the Asset management requirements ✓ Implementation of different module cleaning technics Dry & Wet ( Solabot, Nucca, Energy Guru, Airtuch).✓ MIS, Report generation, Record maintenance

    • India
    • Renewable Energy Semiconductor Manufacturing
    • 100 - 200 Employee
    • Senior Engineer
      • Mar 2017 - Jun 2020

      ✓ Lead Coordinator for Digitalization (Power BI & Python based Platform ) AP &TS solar Assets 650MW.✓ lead as a asset manager 24MW & 38MW, solar Asset management.✓Contractor management.✓ Commissioning & HOTO of 171.78 MWp Single axis tracker based solar power project:Witnessed Commissioning & verifies that the Works and all relevant systems of 220 kV /33kV, equipment and assemblies have been installed, tested, operated and maintained in accordance with the requirements of the relevant contract.

    • India
    • Renewables & Environment
    • 100 - 200 Employee
    • Electrical Project Engineer
      • Feb 2015 - Mar 2017

      ✓ Successfully Executed Two projects of 18 MWp & 16.6 capacity in Telangana.✓ Commissioned both projects within time and Installed 4.8 MWp Single Axis tracker. ✓ Handled the Operation and Maintenance of three projects of total capacity 34.6 MWp. ✓ Successfully Executed Two projects of 18 MWp & 16.6 capacity in Telangana.✓ Commissioned both projects within time and Installed 4.8 MWp Single Axis tracker. ✓ Handled the Operation and Maintenance of three projects of total capacity 34.6 MWp.

    • Electrical Engg.
      • May 2013 - 2015

      ✓ Site Details One: SHRI SAIKRUPA SUGAR & ALLIED INDUSTRIES LTD., HIRADGAON, SHRIGONDA , 40 MW Co-gen plant Shift Electrical Engg.✓ Site Details Two: Gomman India Ltd., PRAVARA RENEWABL ENERGY Ltd., PRAVARA NAGARE , 30 MW Co-Gen Power Plant ✓ Witnessed Commissioning & verifies that the Works and all relevant systems of 132 kV /11kV, TG equipment and assemblies have been installed, tested, operated. ✓ Site Details One: SHRI SAIKRUPA SUGAR & ALLIED INDUSTRIES LTD., HIRADGAON, SHRIGONDA , 40 MW Co-gen plant Shift Electrical Engg.✓ Site Details Two: Gomman India Ltd., PRAVARA RENEWABL ENERGY Ltd., PRAVARA NAGARE , 30 MW Co-Gen Power Plant ✓ Witnessed Commissioning & verifies that the Works and all relevant systems of 132 kV /11kV, TG equipment and assemblies have been installed, tested, operated.

    • Field Engineer
      • 2011 - 2014

      ✓ 12 MW AFBC Co- Gen Power plant operations and maintenance as a Field Engineer.✓ PCC & MCC operation, maintenance & switching.✓ SOP & SOW preparation ✓ 12 MW AFBC Co- Gen Power plant operations and maintenance as a Field Engineer.✓ PCC & MCC operation, maintenance & switching.✓ SOP & SOW preparation

Education

  • Chaitanya Institute of Science and Technology Kakinada
    B.Teach, Electrical and Electronics Engineering
    2008 - 2011
  • Smt B. Seetha Polytechnic Polytechnic
    Diploma, Electrical and Electronics Engineering
    2005 - 2008

Community

You need to have a working account to view this content. Click here to join now