Mohd Rashid Khan

Project Manager at Trygve Engineering Private Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lucknow, Uttar Pradesh, India, IN
Languages
  • Arabic -
  • English -
  • Hindi -
  • Urdu -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

SARAH SAIF

Rashid is wonderful to work with- his exceptional work flow, skills, ingenuity and comprehension of change request makes the projects a brilliant achievement. He leads by example and many people at Trygve find his enthusiasm and dedication both inspiring and motivating. Keep up the excellency. :)

roger beene

During my 14 months as Construction Manager for WPF I worked with Rashid on many work fronts related to the new construction, completions and start up of the ALCOA Mine Site and Village project. The project was Located in a remote campsite environment in Saudi Arabia with a peak of around 1100 men. Rashid was instrumental in solving problems in the field and safely managing the multi lingual workforces of the project. Very good attitude and good work ethics. Highly recommended.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Advanced Affinity Photo for Desktop
    LinkedIn
    Mar, 2023
    - Nov, 2024
  • C201 – Construction Estimating & Valuations
    CCS Construction Computer Software (Pty) Ltd
    May, 2020
    - Nov, 2024
  • C202 Construction Planning and Programming
    CCS Construction Computer Software (Pty) Ltd
    May, 2020
    - Nov, 2024
  • Learning VBA in Excel
    LinkedIn
    Apr, 2020
    - Nov, 2024
  • Cert Prep: Revit MEP Mechanical & Plumbing Certified Professional
    LinkedIn
    Mar, 2018
    - Nov, 2024
  • Migrating from AutoCAD to Revit
    LinkedIn
    Feb, 2018
    - Nov, 2024
  • Excel 2016: Creating and Managing Invoices
    LinkedIn
    Dec, 2017
    - Nov, 2024
  • IELTS
    -

Experience

    • India
    • Architecture and Planning
    • 1 - 100 Employee
    • Project Manager
      • Mar 2018 - Present

    • United Arab Emirates
    • Construction
    • 700 & Above Employee
    • MEP Engineer-Mechanical
      • Nov 2016 - Mar 2018

      Pipe Line Upgradation works in Aziziya, Qatarwhich include DI pipe VC pipe

    • MEP Engineer-Mechanical
      • Oct 2014 - Nov 2016

      • Coordination with subcontractors for timely completion of project.• Preparing Material Takeoff and checking the BOQ to verify the subcontractors claim; subsequently taking info from QS.• To ensure proper manpower deployed by the subcontractors for achieving the specific target. Also, to check material availability with approval done prior to start of an activity.• Reviewing the scope of work of subcontractor and apprising the Quantity Surveyor for any deviation.• To ensure proper permits are issued prior to start of an activity. • Infrastructure work (PVC, GRE/RTR, and G.I. pipe laying) and coordinating for HVAC, Plumbing and Fire Fighting Services for the Mine Site building works. • Material Approval, Inspection request. Coordinating with Quality Control department for effective completion of work and to avoid any anomalies.• Coordinating with the client for any changes and delivering it as per scope and quality. • Issuing Request for Information (RFI) to the designer for any doubts and taking advice, or for changes in design as per site condition and subsequently taking approval from it. Expertise in project management, installation & commissioning, quantity surveying & cost/ risk management, plumbing, fire-fighting & HVAC Proficient with AutoCAD, MEP 2014, HAP 4.9, MS Office with excellent interpretation of engineering design & drawings Proficient in Pump head Calculation, Duct design and sizing, Pipe design and sizing  Successfully managed multiple projects with quantity survey while ensuring that the projects complied with all the cost and scope specifications Strong organizer, motivator, team player and a decisive leader with successful track record in directing from original concept through implementation to handle diverse market dynamics Show less

    • Construction
    • 100 - 200 Employee
    • Mechanical Engineer
      • Oct 2010 - Dec 2013

      • Efficiently followed up for new equipment installation & commissioning and rendered support in design & modification of Package Type AC, Fuel System, Centrifugal Pump & Booster Pump • Pivotal in client complaints / root cause of breakdown and ensuring implementation of the activity schedule & quality management system • Successfully completed 4 projects for Mechanical Services Strategic Project-KAP0) • Proficiently handled major technical issues, changed designs as per the clients & saved time & money • Instrumental role in handling the client complaints; finding out the root cause of breakdown and ensuring implementation of the activity schedule & quality management system Show less

    • Engineer- Production
      • Jul 2009 - Oct 2010

      • Distinguished efforts towards managing production as per production plan for LG Condenser and Evaporator Assembly Line-Refrigeration Division and worked parallel to the Design Department • Instrumental role in analysing daily production and finding ways to achieve short term / annual company target • Oversaw material & labour management along with reviewing the daily stock • Spearheaded the implementation of 5S and scheduling of maintenance of machinery • Distinguished efforts towards managing production as per production plan for LG Condenser and Evaporator Assembly Line-Refrigeration Division and worked parallel to the Design Department • Instrumental role in analysing daily production and finding ways to achieve short term / annual company target • Oversaw material & labour management along with reviewing the daily stock • Spearheaded the implementation of 5S and scheduling of maintenance of machinery

  • Technical Associates Limited
    • Lucknow Area, India
    • Jr Design Engineer
      • Nov 2004 - Jun 2005

      • Contributed significantly towards developing mechanical drawing in AutoCAD, in accordance to IS specifications for distribution transformer i.e. up to 630 KVA • Pivotal in studying and implementing systems for reduction in cycle times for drawing generation and implementation of systems for ensuring high accuracy • Shouldered the responsibilities of managing the bills of quantity generation • Contributed significantly towards developing mechanical drawing in AutoCAD, in accordance to IS specifications for distribution transformer i.e. up to 630 KVA • Pivotal in studying and implementing systems for reduction in cycle times for drawing generation and implementation of systems for ensuring high accuracy • Shouldered the responsibilities of managing the bills of quantity generation

Education

  • Aligarh Muslim University
    Bachelor of Engineering, Mechanical
    2001 - 2009
  • Aligarh Muslim University
    Diploma in Engineering, Mechanical Engineering
    2001 - 2004
  • CITY MONTESSORI SCHOOL
    College, Science
    1999 - 2001

Community

You need to have a working account to view this content. Click here to join now