Rashid Hasan

Deputy Manager at SS POWER I LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
BD
Languages
  • English Full professional proficiency
  • Hindi Limited working proficiency
  • Bengali Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Bangladesh
    • Electric Power Generation
    • 1 - 100 Employee
    • Deputy Manager
      • Nov 2021 - Present

      -Project management, Erection and commissioning of Coal Handling Plant and Ash Handling plant of 1320 MW Thermal Power Plant Project, Banshkhali, Chattogram including- -Conveyor Belt 20 pcs 2000 TPH each. -Stacker Reclaimer 2 pcs 2000 TPH, Stacker 2 pcs 2000 TPH. -Hammer Ring Crusher 2 Pcs 1200 TPH, -Ship Unloader 2 pcs 1000 TPH, -Magnetic Separator 8 pcs -VRM for coal grinding 12 Pcs 84 TPH capacity, -Coal Storage Silo 12 Pcs x 1000 MT, -Vibrating Screen 2 PCs 1700 TPH -Dense phase system, bottom ash conveyor, -bottom ash bin, -ESP -Ash transportation system etc.. Ensure installation of equipment according to MOS, FQP, WPS and other standard drawing/ documents. Inspection, Hand over / Take over of the equipment. Show less

    • Wholesale Building Materials
    • 1 - 100 Employee
    • Deputy Manager-Mechanical
      • Jul 2016 - May 2021

      1. Maintenance of Cement Mill, Crusher and Packing plant, including Conveyors, Dust Collector, Separator, Process Fan, Pump, Bucket Elevator, Gear Boxes, Mill main bearings, Compressors and Cranes with satisfying safety compliances.2.Ensuring reliability and availability of full plant to run the production uninterruptedly.3. Managing the Foreign Procurement, i.e. Offer collection, Technical verification, PI, Invoice, Packing list, Bill of lading, Country of origin certificate receiving from supplier and hand over to CNF.4. Inspection of all the machines as per schedule. 5. New project planning, procurement, erection and commissioning. i.e. Four new Cement Silos have been installed and commissioned.6. Optimization and upgrading of process and spares.7. Skill enhancement and development of the team members.8. To prepare the drawing of equipment and keep record9. Upgrading existing Maintenance Methodology and Technology. Show less

    • Assistant Manager-Mechanical
      • Jul 2016 - Jun 2018

      1. Maintenance of Cement Mill, Crusher and Packing plant, including Conveyors, Dust Collector, Separator, Process Fan, Pump, Bucket Elevator, Gear Boxes, Mill main bearings, Compressors and Cranes with satisfying safety compliances.2.Ensuring reliability and availability of full plant to run the production uninterruptedly.3. Inspection of all the machines as per schedule. 4. Optimization and upgrading of process and spares.5. To prepare the drawing of equipment and keep record Show less

    • Switzerland
    • Wholesale Building Materials
    • 700 & Above Employee
    • Mechanical Engineer
      • Oct 2012 - Jun 2016

      1. Maintenance of VRM, KILN, Cooler, Preheater tower, Cement Mill, Bridge reclaimer, Portal Scraper, Crusher, Packing plant, Barge Loader including Conveyors, Dust Collector, Separator, Process Fan, Pump, Bucket Elevator, Gear Boxes, Compressors and Cranes. 2. Completing the maintenance job with the safety compliances. i.e. RBA, Hot Work, PTW, WAH, Confined space, water near body etc. 3. Yearly and other planned shutdown planning with Scheduling. 4. Managing the Spare parts and Services for the 4000 TPD integrated cement plant. 5. Correspond with the supplier, purchaser and the end user. 6. Alternate spare sourcing with better quality and lower price. 7. Yearly Maintenance Budget preparation ( i.e. 171 Million BDT for 2016), utilization and Cost Tracking 8. Preparing all the reports for monthly Maintenance meeting. Show less

    • Bangladesh
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Mechanical Engineer
      • Mar 2011 - Sep 2012

      1. Maintenance of (55 MW Power Plant) 6 Pcs MAN B&W 9L 58/64 engines and Steam Turbines. Servicing of turbochargers, oil purifier, compressor, heat exchanger, Cylinder head, Fuel pumps, Inlet/Outlet valves, Injector Nozzles, Liner etc. 2. Spare parts re-ordering, stock keeping, utilizing. Liaise with foreign experts and take part in their job. 3. Schedule inspection and checking of all equipment. 4. Running the shift activities and Generating the shift report. 5. Take part in special maintenance job with foreign experts. Show less

    • Bangladesh
    • Industrial Machinery Manufacturing
    • 500 - 600 Employee
    • Mechanical Engineer - Grade I
      • Jul 2010 - Feb 2011

      1. Mechanical Maintenance of Rolling Mill, Cooling bad, Compressor, WTP 2. Updating the plant KPI board machine history card 3. Report generating as per higher management demand 4. Support production planning 5. Breakdown analysis 6. Physical stock analysis of spare parts 7. Keep and upgrade ISO documentation 1. Mechanical Maintenance of Rolling Mill, Cooling bad, Compressor, WTP 2. Updating the plant KPI board machine history card 3. Report generating as per higher management demand 4. Support production planning 5. Breakdown analysis 6. Physical stock analysis of spare parts 7. Keep and upgrade ISO documentation

Education

  • Khulna University of Engineering and Technology
    Bachelor of Science (B.Sc.), Mechanical Engineering
    2006 - 2010
  • HRD Foundation
    Post Graduate Diploma, Supply Chain Management and Logistics
    2019 - 2021
  • University of Science and Technology, Chittagong
    MBA, Supply Chain Management
    2017 - 2018
  • Govt. Hazi Muhammad Mohsin College
    Higher secondary, Science
    2003 - 2005
  • Hazigoan Borumchara High School

Community

You need to have a working account to view this content. Click here to join now