Rashad Quliyev

DT Engineer at P.I. Works, Inc.
  • Claim this Profile
Online Presence
Contact Information
Location
Azerbaijan, AZ

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Türkiye
    • Telecommunications
    • 200 - 300 Employee
    • DT Engineer
      • Sep 2020 - Present

      PI Works Optimization Project Perform Benchmark tests at DT tools like Tems İnvestigation 21, SwissQuall Freerider, Nemo Outdoor, Optimizer Divercity PI Works Optimization Project Perform Benchmark tests at DT tools like Tems İnvestigation 21, SwissQuall Freerider, Nemo Outdoor, Optimizer Divercity

    • Finland
    • Telecommunications
    • 700 & Above Employee
    • NPO engineer and DT team leader
      • Jan 2020 - Sep 2020

      Azercell LTE Overlay Project - EXT Project Engineer Tracking simultaneous events and coordinate works between the Field Subcontractor and the Nokia Optimization team. Perform daily site alarm check, general alarm monitoring over all network Control site’s availability, daily traffic, NetAct OSS KPI. Site level and cell level KPI reporting, executing parameter changes if necessary. Site commissioning (RETU, cell configuration) Submission of internal and external reports of PAC/FAC documents. To solve Tems program problems. Control Tems lisences, communicate İnfovista team if necessary. Perform SSV test in Pre-Drive and Post Drive if necessary. Make Cluster test for acceptance Custom complaint investigation and using CPM tool own account to reply customer complaints Show less

    • DT Engineer
      • Feb 2019 - Aug 2019

      Azerconnect Bencmark Project – EXT Project Engineer Perform Benchmark DT in Tems Investigation 20.3 according to P3 Methodology Data Test: • Browsing the most popular websites – HTTP Static Page (Kepler), HTTP Live Page • Transferring files – HTTP or FTP file DL/UL (evaluated on access success rate, stability and the data transfer rate) • HTTP Data Stream DL/UL • Playing YouTube videos (reporting interruptions, buffering times and video quality) Voice Test: • Assessing smartphone-to-smartphone calls (including background data traffic in parallel) • Evaluating success of the call setup, call setup time and user triggered termination • Evaluating Voice Quality (MOS POLQA) Install Tems SW on Samsung device • Flash Firmware • Flash patched boot image • Install TemSfy on device Carry out Single Site Verification in Pre-Drive and Post Drive Make Cluster test for acceptance Perform Cluster Optimization Drive test Analysing Log files and layer 3/2 messages to solve call drops, blocked call issues Custom complaint investigation Show less

    • Azerbaijan
    • Telecommunications
    • 700 & Above Employee
    • Drive Test Engineer
      • Jul 2018 - Feb 2019

      Intern - Azercell Telekom LLC, Technology Department / RAN Optimization & Planning ● TEMS and Nemo drive test and log analysis ● LTE DT Parameters like RSRP, RSRQ, RSSI, SINR, CQI, PCI, BLER, DL Throughput, UP Throughput ● WCDMA DT Parameters like RSCP, EC/No, Scrambling code, LAC, RAC, Cell ID, DL Throughput, UP Throughput ● GSM DT Darameters like Rx Level, Rx Quality, BCCH, BSIC, BER, C/I, FER, DL Throughput, UP Throughput ● LTE and GSM Frequency planning on 1800 Mhz ● UMTS and GSM 900 Frequency planning on 900 Mhz ● 2G frequency and TRX planning ● Field test of radio networks (4G/3G/2G), collects statistics, analyze logs and prepare reports. ● Custom complaint investigation ● Indoor & outdoor test (DL/UL data throughput, Voice test, Short call test, CSFB, Ping test) Show less

    • Romania
    • Oil and Gas
    • 1 - 100 Employee
    • Practitioner
      • Feb 2018 - May 2018

      ● Fiber optic cable installation ● Mlink and Radwin modem installation ● Patch panel punch ● Fiber optic cable installation ● Mlink and Radwin modem installation ● Patch panel punch

Education

  • Azerbaijan State University of Oil and Industry
    Bachelor's degree, Information Technology
    2014 - 2018
  • Azerbaijan State University of Oil and Industry
    Master's degree, Information Technology
    2018 -

Community

You need to have a working account to view this content. Click here to join now