RANJITH RAJU
Quality Assurance Quality Control Engineer -E&I at GulfSpic- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
GulfSpic
-
Oil and Gas
-
100 - 200 Employee
-
Quality Assurance Quality Control Engineer -E&I
-
Apr 2018 - Present
-
-
-
-
QC Inspector E&I
-
Nov 2020 - Oct 2021
-
-
-
Kurihara Kogyo Co. Ltd
-
100 - 200 Employee
-
E&I QAQC LEAD
-
Sep 2015 - Sep 2016
Duties and Responsibilities: Review all applicable drawings and specifications. Planning and preparing of MR list. Familiar to coordinate with 3D-MD for construction activities. Supervision for installation works at Process, cooling tower, Pipe Racks, Tank form, Loading/ Unloading bay Areas. Prepare scaffolding request form and submit early. Preparation of drawing needed in construction details and specification. Review SWMSRA and apply work permit system PTW on daily based as per work activities. Briefing to work groups about Risks & how can eliminate in daily tool box meeting. Supervise the installation of Electrical systems such as HV/LV Switchgear ,transformer, MCC, Battery cubic panes, control panel, motor RCU, cable installation HV/LV, Ladders, trays, trunking, conduit, cable glanding and termination ,lighting & power, and grounding system. Testing of HV,LV ,control and Instrument cables. Supervise the installation of telecommunication system such as Telephone, PA, CCTV &Security and general alarm system. Supervise the underground Cable such as HT Cables-22Kv and liaise with HV cable vendors during Glanding&termination/HV cable joining preparation. Supervise the installation of instrument system such as all kind of field instruments, air manifold, Junction Box ,JB Frames, trays –primary and secondary and ladders ,cable installation, glanding and termination. Giving correct instruction to tubing fitters and supervising Impulse tubing, SS Tubing installation as per hook up. Perform other related duties as may be assign company Performing quality inspection with installation groups Perform daily scheduled and activities and give proper instruction to sub-contractor. Ability to take action plan and do rectification jobs. Ability to speak with client by mail and or directly. Comply with client and internal HSE rules and regulation at site Show less
-
-
-
ONYO ENGINEERING PTE LTD
-
1 - 100 Employee
-
E&I-QAQC / Engineer
-
Jul 2008 - Dec 2014
Duties and Responsibilities: Preparation of Inspection Test plan (ITP) and submission for E&I Activities. Preparing SWMSRA and submitting for approval to prior to start wok activities. Review of vendor documents and Review of package vendor documentation & drawings Preparation Cable tray routing, wiring drawing, cable schedule, JB schedule, Connection list. Preparation of Instrument & junction box location plan and layout. Preparation of loop drawing, Hook up drawing and material Take-offs Sub-contracting of instrumentation installation work, support wiring and installation work Performed as a supervisor E&I installation activities. Familiar with Shutdown & commissioning Work. Interface with suppliers, clients, kick off meeting & other engineering disciplines, Performed FAT and SAT Preparing and guiding designer/Draftsman for preparing cable tray, cable routing plan, hook-up drawings. As a team leader, I was involved in the quality inspection, loop & wiring connection checking and commissioning of the plant. Witness Electrical and Instrument construction, testing, commissioning work. Performing cold & Hot loop checks and functional testing for filed instrument such as TT, FT, LT, PI, DPI, PX, LX, FX-Rosemount type, Pneumatic Valves, control valves & ON/OFF valves. Preparing of instrument summary, System test packs or loop packs for instrument system. Preparation of Electrical summary, test packs for Electrical Equipment and grounding system. Preparation RFI &MR forms. Understand and ability to perform as per local (Singapore standard & code of practice / international codes and or client specification. Maintained good documentation system. Field mock up Preparing and submission for prior to approval. Keep “As Built Markup” or (Red line Markup) drawing submission if any site modification/alterations in original. Liaise with PE/LEW/Supplier ABB/Schneider during testing. Show less
-
-
-
Chemin C&I Private Limited
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Instrument Engineer -Erection
-
Sep 2004 - Jun 2008
-
-
Education
-
JJ college of Engineering &tech
Bachelor’s Degree, Instrumentation Technology/Technician