RANJITH RAJU

Quality Assurance Quality Control Engineer -E&I at GulfSpic
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jubail, Eastern, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oil and Gas
    • 100 - 200 Employee
    • Quality Assurance Quality Control Engineer -E&I
      • Apr 2018 - Present
    • QC Inspector E&I
      • Nov 2020 - Oct 2021
    • 100 - 200 Employee
    • E&I QAQC LEAD
      • Sep 2015 - Sep 2016

      Duties and Responsibilities:  Review all applicable drawings and specifications.  Planning and preparing of MR list.  Familiar to coordinate with 3D-MD for construction activities.  Supervision for installation works at Process, cooling tower, Pipe Racks, Tank form, Loading/ Unloading bay Areas.  Prepare scaffolding request form and submit early.  Preparation of drawing needed in construction details and specification.  Review SWMSRA and apply work permit system PTW on daily based as per work activities.  Briefing to work groups about Risks & how can eliminate in daily tool box meeting.  Supervise the installation of Electrical systems such as HV/LV Switchgear ,transformer, MCC, Battery cubic panes, control panel, motor RCU, cable installation HV/LV, Ladders, trays, trunking, conduit, cable glanding and termination ,lighting & power, and grounding system.  Testing of HV,LV ,control and Instrument cables.  Supervise the installation of telecommunication system such as Telephone, PA, CCTV &Security and general alarm system.  Supervise the underground Cable such as HT Cables-22Kv and liaise with HV cable vendors during Glanding&termination/HV cable joining preparation.  Supervise the installation of instrument system such as all kind of field instruments, air manifold, Junction Box ,JB Frames, trays –primary and secondary and ladders ,cable installation, glanding and termination.  Giving correct instruction to tubing fitters and supervising Impulse tubing, SS Tubing installation as per hook up.  Perform other related duties as may be assign company  Performing quality inspection with installation groups  Perform daily scheduled and activities and give proper instruction to sub-contractor.  Ability to take action plan and do rectification jobs.  Ability to speak with client by mail and or directly.  Comply with client and internal HSE rules and regulation at site Show less

    • E&I-QAQC / Engineer
      • Jul 2008 - Dec 2014

      Duties and Responsibilities:  Preparation of Inspection Test plan (ITP) and submission for E&I Activities.  Preparing SWMSRA and submitting for approval to prior to start wok activities.  Review of vendor documents and Review of package vendor documentation & drawings  Preparation Cable tray routing, wiring drawing, cable schedule, JB schedule, Connection list.  Preparation of Instrument & junction box location plan and layout.  Preparation of loop drawing, Hook up drawing and material Take-offs  Sub-contracting of instrumentation installation work, support wiring and installation work  Performed as a supervisor E&I installation activities.  Familiar with Shutdown & commissioning Work.  Interface with suppliers, clients, kick off meeting & other engineering disciplines,  Performed FAT and SAT  Preparing and guiding designer/Draftsman for preparing cable tray, cable routing plan, hook-up drawings.  As a team leader, I was involved in the quality inspection, loop & wiring connection checking and commissioning of the plant.  Witness Electrical and Instrument construction, testing, commissioning work.  Performing cold & Hot loop checks and functional testing for filed instrument such as TT, FT, LT, PI, DPI, PX, LX, FX-Rosemount type, Pneumatic Valves, control valves & ON/OFF valves.  Preparing of instrument summary, System test packs or loop packs for instrument system.  Preparation of Electrical summary, test packs for Electrical Equipment and grounding system.  Preparation RFI &MR forms.  Understand and ability to perform as per local (Singapore standard & code of practice / international codes and or client specification.  Maintained good documentation system.  Field mock up Preparing and submission for prior to approval.  Keep “As Built Markup” or (Red line Markup) drawing submission if any site modification/alterations in original.  Liaise with PE/LEW/Supplier ABB/Schneider during testing. Show less

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Instrument Engineer -Erection
      • Sep 2004 - Jun 2008

Education

  • JJ college of Engineering &tech
    Bachelor’s Degree, Instrumentation Technology/Technician
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now