Ranjita Khatri
Civil Engineer at Hydro-Consult Engineering Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Hydro-Consult Engineering Limited
-
Nepal
-
Civil Engineering
-
1 - 100 Employee
-
Civil Engineer
-
Jul 2017 - Present
-
-
Trainee Civil Engineer
-
Apr 2017 - Jun 2017
As a trainee civil engineer, I was responsible for preparation of bill of quantity, rate analysis, Stability analysis of headworks components followed by production of civil Drawings
-
-
-
Upper Rahughat Hydroelectric Project (48MW)
-
Myagdi District
-
Civil Design Engineer
-
Sep 2019 - Aug 2022
Upper Rahughat Hydroelectric Project is a cascade Project of Rahughat Mangale Hydroelectric Project. It utilizes 11.6 cumecs tailwater of Rahughat Mangale HEP and additional 3.6 cumecs from Bagar Khola diversion to generate 48MW electricity. My resposibility as Civil/ Design engineer were site visit and preparation of review report preparation of tender documents and drawings preparation of Design Basis Memorandum Hydraulilcs design of headworks components viz weir, stilling basin, undersluice, settling basin headpond Stability and Structural Analysis of weir, stilling basin, undersluice, headpond preparation of Civil and RC drawings Optimization of Headrace tunnel and Penstock Pipe Calculation of headloss, power and energy Site based modification and revision of construction drawings Show less
-
-
-
Rahughat Mangale Hydropower Project (35 MW)
-
Myagdi District
-
Civil/ Design Engineer
-
Sep 2019 - Jan 2022
Rahughat Mangale is a run off river project with design discharge of 11.6 cumecs and gross head of 367m. I was responsible for the site visit and preparation of review report of the project. preparation of tender documents and drawings preparation of Design Basis Memorandum responsible for detailed engineering design of headworks components for hydraulic modelling Hydraulics design, Stability and structural analysis of settling basin, headpond along with preparation of Civil, RC and Excavation Drawings Optimization of Headrace Tunnel, Headrace pipe and Penstock Pipe Transient Analysis using software called Hytran Site based modification and revision of construction drawings calculation and update of headloss, power and energy Show less
-
-
-
-
Civil/ Design Engineer
-
Feb 2019 - Oct 2019
Chino Khola Small Hydropower Project is a run-off-river project with 1cumecs design discharge and 902m gross head. As a civil Design Engineer, I was responsible for stability analysis and preparation of civil drawings of different project components Also, I was responsible for penstock optimization and calculation of headloss, power and energy Chino Khola Small Hydropower Project is a run-off-river project with 1cumecs design discharge and 902m gross head. As a civil Design Engineer, I was responsible for stability analysis and preparation of civil drawings of different project components Also, I was responsible for penstock optimization and calculation of headloss, power and energy
-
-
-
Mistri Khola 2 Hydroelectric Project
-
Myagdi District
-
Civil/ Design Engineer
-
Mar 2018 - Jul 2019
Mistri Khola 2 Hydroelectric Project is a cascade project of Mistri Khola hydropower Project (42MW). I was responsible for the Feasibility and Updated feasibility study of the projects. some of my major responsibilities during the study of the project are as follows Site visit and preparation of site visit report selection of various layout options and alternatives preparation of Civil drawings Calculation of bill of quantity, rate analysis, headloss, power and energy comparision of layout alternatives in terms of cost and energy generation Show less
-
-
-
Middle Tamor Hydropower Project (73 MW)
-
Taplejung District, Nepal
-
Civil Engineer
-
Sep 2018 - Dec 2018
I was responsible for Due Diligence Study of Middle Tamor Hydropower Project. The scope of the study were review of hydrology, hydraulics, layout of the project alignment, project components and access, bill of quantity, rate analysis, cost , power and energy and overall viability of project in terms of financial analysis and economic analysis I was responsible for Due Diligence Study of Middle Tamor Hydropower Project. The scope of the study were review of hydrology, hydraulics, layout of the project alignment, project components and access, bill of quantity, rate analysis, cost , power and energy and overall viability of project in terms of financial analysis and economic analysis
-
-
-
Bill Verification of Upper Khimti Hydropower Project (7 MW)
-
Ramechhap District
-
Civil Engineer
-
Mar 2018 - Apr 2018
As a civil engineer I was responsible for bill verification of Interim payment certificate (IPC) 03, 04 and 05 and preparation of report. I was also responsible for preparing revised bill of quantity and recertification of Interim Payment Certificate 01 and 02 As a civil engineer I was responsible for bill verification of Interim payment certificate (IPC) 03, 04 and 05 and preparation of report. I was also responsible for preparing revised bill of quantity and recertification of Interim Payment Certificate 01 and 02
-
-
-
Upper Tadi Hydropower Project (11 MW)
-
Nuwakot District, Nepal
-
Civil Engineer
-
Jul 2017 - Feb 2018
Upper Tadi Hydropower Project is a run-off-river project. I was responsible for detailed Engineering Design of Headworks components along with Stability and Structural Analysis followed by the production of Civil and RC Drawings and bar bending schedule. Upper Tadi Hydropower Project is a run-off-river project. I was responsible for detailed Engineering Design of Headworks components along with Stability and Structural Analysis followed by the production of Civil and RC Drawings and bar bending schedule.
-
-
Education
-
Nepal Engineering college
Bachelor of Engineering - BE, Civil Engineering