Randy Drouillard
Retired at Franks Manufacturing Co- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Franks Manufacturing Co
-
United States
-
Plastics Manufacturing
-
1 - 100 Employee
-
Retired
-
Jun 2018 - Present
-
-
CNC Programer
-
Jun 2018 - Jun 2023
Solid works & Mastercam Design Drafting
-
-
-
-
CAD Drafter
-
Oct 2016 - Jun 2018
Upgrading documentation (both hand and cad), specification sheets and sketches, bill of material take off, verification of field installations prior to revisions Upgrading documentation (both hand and cad), specification sheets and sketches, bill of material take off, verification of field installations prior to revisions
-
-
-
Paton Engineers and Constructors
-
Oil and Gas
-
100 - 200 Employee
-
I/E design & Cad Standards
-
Jan 2005 - Feb 2016
I/O Survey and Systems, Instrument/Electrical work order jobs consisting of unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad), specification sheets and sketches, bill of material take off, verification of field installations prior to revisions I/O Survey and Systems, Instrument/Electrical work order jobs consisting of unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad), specification sheets and sketches, bill of material take off, verification of field installations prior to revisions
-
-
-
CONTECH CONTROL SERVICES
-
United States
-
Oil and Gas
-
200 - 300 Employee
-
I/E Designer
-
Jan 2002 - Nov 2004
I/O Survey and Systems, Instrument/Electrical work order jobs consisting of unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad), specification sheets and sketches, bill of material take off, verification of field installations prior to revisions I/O Survey and Systems, Instrument/Electrical work order jobs consisting of unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad), specification sheets and sketches, bill of material take off, verification of field installations prior to revisions
-
-
-
-
I/E Designer
-
Jul 1999 - Nov 2001
Project: Amoco - Pasadena Plant Upgrade & Maintenance of Chemical Plant Responsibilities: Unit Maintenance, handling Instrument/Electrical work order jobs consisting of maintenance and unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad). Drawings, specification sheets and sketches, bill of material take off. Project: Amoco - Pasadena Plant Upgrade & Maintenance of Chemical Plant Responsibilities: Unit Maintenance, handling Instrument/Electrical work order jobs consisting of maintenance and unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad). Drawings, specification sheets and sketches, bill of material take off.
-
-
-
-
I/E Designer
-
May 1994 - Apr 1999
Project: Celanese - Clear Lake Plant Chemical Group Upgrade & Maintenance of Chemical Plant, and Project Team Responsibilities: Project Team, handling Instrument/Electrical design of Loop Diagrams, Electrical and Instrument Schematics, Bill of Material take off, verification of field installations prior to revisions, maintaining client standards for drawing development, development of specifications of instrument and electrical equipment for project operation, projects range from design of single item replacement to new DCS additions and interface to existing systems. Unit Maintenance, handling Instrument/Electrical work order jobs consisting of maintenance and unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad). Drawings, specification sheets and sketches, bill of material take off. Show less
-
-
-
-
I/E Designer
-
Nov 1991 - May 1994
Project: Hoechst Celanese - Clear Lake Plant Chemical Group Upgrade & Maintenance of Chemical Plant Responsibilities: Unit Maintenance, handling Instrument/Electrical work order jobs consisting of maintenance and unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad). Drawings, specification sheets and sketches, bill of material take off. Project: Hoechst Celanese - Clear Lake Plant Chemical Group Upgrade & Maintenance of Chemical Plant Responsibilities: Unit Maintenance, handling Instrument/Electrical work order jobs consisting of maintenance and unit upgrade projects. Duties included field survey and upgrading documentation (both hand and cad). Drawings, specification sheets and sketches, bill of material take off.
-
-
-
-
I/E Designer
-
Apr 1990 - Nov 1991
Project: Shell Engineering Design (S.E.D.)-Shell Deer Park Upgrade & Maintenance of Chemical Plant Responsibilities: Instrument/Electrical work order jobs consisting of maintenance and unit upgrade projects. Duties included field survey and upgrading documentation. Drawings, specification sheets, installation details, instrument index's. Project: Shell Engineering Design (S.E.D.)-Shell Deer Park Upgrade & Maintenance of Chemical Plant Responsibilities: Instrument/Electrical work order jobs consisting of maintenance and unit upgrade projects. Duties included field survey and upgrading documentation. Drawings, specification sheets, installation details, instrument index's.
-
-
-
S&B
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Instrument Designer
-
Mar 1990 - Apr 1990
Project: Champlin; Installation of pressure, level, and flow instruments Responsibilities: Design of loop drawings, installation details, and development of instrument index. Project: Champlin; Installation of pressure, level, and flow instruments Responsibilities: Design of loop drawings, installation details, and development of instrument index.
-
-
-
-
Instrument Designer
-
Jan 1990 - Mar 1990
Project: Georgia Gulf Phenol Plant Relocation; Relocation of existing Phenol Plant; Relocation included change over from Pneumatic controls to DCS-Honeywell TDC-3000. Responsibilities: Design of instrument location plans, installation details, junction box details, junction box wiring diagrams, marshalling rack wiring diagrams, and update of the instrument index. Project: Monsanto MHBA-Incinerator Debottlenecking; Installation of pressure, level, and flow instruments into a Modicon PLC and Provo X control system. Responsibilities: Design of loop drawings, installation details, location plans, cable schedule, wiring diagrams, and control panel layout. Show less
-
-
-
-
Electrical Design
-
Mar 1984 - Jan 1990
Type of Work: Electrical Product Designer I -Design of finished electrical wire list & cable assemblies, form system diagrams, select connectors and cable hardware from standard parts lists and system engineering sketches. Determine hardware and provide input for parts ordering. Provide support to manufacturing. Member of the Process Improvement Team, and the Process Development Team. Type of Work: Electrical Product Designer I -Design of finished electrical wire list & cable assemblies, form system diagrams, select connectors and cable hardware from standard parts lists and system engineering sketches. Determine hardware and provide input for parts ordering. Provide support to manufacturing. Member of the Process Improvement Team, and the Process Development Team.
-
-
-
-
H Vac installer
-
Aug 1983 - Dec 1983
Type of Work: Sheet metal man - Installed air conditioning and heating for a fifteen story building. Type of Work: Sheet metal man - Installed air conditioning and heating for a fifteen story building.
-
-
-
S&B
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Instrument Designer
-
May 1980 - Jul 1983
Design of instrument system diagrams from P & ID, and engineering sketches, control panel layouts, and wiring diagrams; designed cable routing, and wire termination locations for instrument location plans, master cable termination distribution for TDC 2000 computer cabinet; interfaced wiring for instrument installations, details, and master parts lists, instrument index by function. Design of instrument system diagrams from P & ID, and engineering sketches, control panel layouts, and wiring diagrams; designed cable routing, and wire termination locations for instrument location plans, master cable termination distribution for TDC 2000 computer cabinet; interfaced wiring for instrument installations, details, and master parts lists, instrument index by function.
-
-
-
-
Instrument Draftsman
-
Aug 1978 - May 1980
Design of instrument system diagrams from P & ID, and engineering sketches, control panel layouts, and wiring diagrams; drafted, and designed cable routing, and wire termination locations for instrument location plans; interfaced wiring for instrument installations, details, and master parts lists, instrument index by function. Design of instrument system diagrams from P & ID, and engineering sketches, control panel layouts, and wiring diagrams; drafted, and designed cable routing, and wire termination locations for instrument location plans; interfaced wiring for instrument installations, details, and master parts lists, instrument index by function.
-
-
-
3D/International
-
Architecture and Planning
-
1 - 100 Employee
-
CAD Design
-
Aug 1977 - Aug 1978
Type of Work: Architectural draftsman, Product Design Group - designed, and drafted wiring for electrical outlets, and lighting fixtures, plumbing, and air conditioning & heating for multi-story buildings. Type of Work: Architectural draftsman, Product Design Group - designed, and drafted wiring for electrical outlets, and lighting fixtures, plumbing, and air conditioning & heating for multi-story buildings.
-
-
-
Brown & Root
-
Oil and Gas
-
100 - 200 Employee
-
Instrument Draftsman
-
Jun 1977 - Aug 1977
drafted system diagrams, P & ID's, control panel layouts, instrument plot plans, cable routing. drafted system diagrams, P & ID's, control panel layouts, instrument plot plans, cable routing.
-
-
Education
-
Pasadena High School