Randall Hunt

Controls Technician/Maintenance Technician at Lomanco
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Higginson, Arkansas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Controls Technician/Maintenance Technician
      • Jul 2020 - Present

    • Senior Maintenance Technician
      • Jun 2012 - Jul 2020

      Have been involved with installing PLCs and HMI programs all have been Allen Bradley PLCs. I have experience with RS Logix 500, 5000 and the new studio Logics 5000. I also have done all the mechanical duties as well like changing bearings, working on all the machines in our packaging area. Involved with all the electrical duties as well. On second shift, I’m Senior Maintenance Technician. Helped install new machinery on several of our lines. Have been involved with installing PLCs and HMI programs all have been Allen Bradley PLCs. I have experience with RS Logix 500, 5000 and the new studio Logics 5000. I also have done all the mechanical duties as well like changing bearings, working on all the machines in our packaging area. Involved with all the electrical duties as well. On second shift, I’m Senior Maintenance Technician. Helped install new machinery on several of our lines.

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Incineration Maintenance Technician
      • Jun 2010 - Dec 2011

      Managed the maintenance of all incinerators south of Baghdad, Iraq Managed the maintenance of all incinerators south of Baghdad, Iraq

    • United States
    • Mechanical Or Industrial Engineering
    • 200 - 300 Employee
    • Maintenance Electrician
      • Jun 1999 - Feb 2010

      Did a lot of Installs. Work on punch presses, ran conduit, ran Cat 5 cable. Installed bus plugs for a variety of different machines. Did all the maintenance in the paint building which consisted of making sure the ovens worked right. Made sure the paint booths were grounded properly. Made sure the wash system worked right. Worked on brake presses. Ran all the wiring for our welding area. It consisted of about 28- 480 vac welders and plugs. Worked on Cincinnati lasers and Amada lasers. Did a lot of Installs. Work on punch presses, ran conduit, ran Cat 5 cable. Installed bus plugs for a variety of different machines. Did all the maintenance in the paint building which consisted of making sure the ovens worked right. Made sure the paint booths were grounded properly. Made sure the wash system worked right. Worked on brake presses. Ran all the wiring for our welding area. It consisted of about 28- 480 vac welders and plugs. Worked on Cincinnati lasers and Amada lasers.

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • Parts Finisher
      • Feb 1997 - Apr 1999

      Finished parts that came from the die cast machines. Then the parts where bead basted and sent to the paint department. Finished parts that came from the die cast machines. Then the parts where bead basted and sent to the paint department.

Education

  • ASU-Searcy
    Technical certification, Industrial Electronics Technology/Technician
    2002 - 2006

Community

You need to have a working account to view this content. Click here to join now