Ramzi Azar

PMO Senior Director at Alkhorayef Water & Power Technologies
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saudi Arabia, SA
Languages
  • English Full professional proficiency
  • Arabic Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Saudi Arabia
    • Utilities
    • 300 - 400 Employee
    • PMO Senior Director
      • Aug 2014 - Present

    • Saudi Arabia
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Senior Mechanical Construction Engineer
      • Feb 2012 - Jul 2014

      Construction of Qurayyah Combined Cycle Power Plant (4,150 MW)‐ Responsible for the steam, water and auxiliary piping systems- Managing and controlling direct and in-direct manpower- Piping work covers Alloy Steel, Carbon Steel, Stainless Steel and FRP/GRP‐ Providing sub‐contractors with technical directives and information required to execute the work‐ Coordinating between different sub‐contractors in order to enable a synchronized working site‐ Liaising with the client's representatives, other disciplines and departments on the construction site‐ Ensuring that the work executed is per the project specifications‐ Supervising the implementation of HSE policy at site

    • Operations Manager
      • Jan 2011 - Jan 2012

      ‐ Organizing and managing the resources of the company‐ Coordinating between different job sites (construction sites, marine services and maintenance)‐ Preparing and monitoring the operations budget‐ Dealing with different problems encountering the supervisors

    • Lead Mechanical Engineer
      • Sep 2009 - Jan 2012

      Rehabilitation of GamPetroleum Banjul Depot (20,000 mT)‐ Transferring the depot from a light fuel storage facility to an asphalt storage facility‐ Designing and installing all the necessary pipe lines and mechanical equipment‐ Performing all necessary pipe selection, routing and pre stress analysis

    • Mechanical Site Manager
      • Oct 2010 - Oct 2011

      Construction of Brikama Power Plant/IDB‐ Mechanical main contractor’s representative on site‐ Supervising the construction and installation of all mechanical units, piping systems and tanks‐ Ensuring the implementation of HSE policy at site‐ Setting up work plan, schedule and monitoring the progress with respect to payment Milestones‐ Following and comparing project’s cost to budget

    • Lead Mechanical Engineer
      • Aug 2009 - Jan 2011

      Construction of Tug Boat “Fares” (2200 HP)‐ Designing and installing of the pipelines: diesel, water and fire system‐ Generating PI&Ds, selection of pipes dimensions, routing and stress analysis‐ Installing of the hydraulic system‐ Handling supplementary managerial tasks

    • Fuel Depot and Maintenance Manager
      • Sep 2008 - Nov 2009

      Operations of GamPetroleum Storage Facility Company Ltd. (55,000 mT)- Managing and operating the facility in a manner that meets the Health Safety Security Environment policies- Planning, initiating operations, and controlling the performance of the depot to ensure the integrity of the site and proper management of assets and resources of operations- Handling the receipt, storage, and distribution of bulk products: a- Diesel: 20,000 mT b- Gasoline: 7,500 mT c- Jet A1: 7,500 mT d- H.F.O.: 15,000 mT e- L.P.G.: 1,000 mT- Keeping adequate stocks of fuels in accordance with standard quality controls, ensuring that correct deliveries and minimizing losses- Implementing and managing a regular program of maintenance for all the depot’s facilities, and liaising with contractors to rectify and or modify equipment as and when necessary- Liaising between the depot and throughput customers, ensuring that service agreements are met- Training and coaching the depot staff and keeping the depot operations at a high level of professionalism

    • Mechanical Site Engineer
      • May 2007 - Sep 2008

      Construction of GamPetroleum Storage Facility Company Ltd. (55,000 mT)- Installing of piping, offshore pipelines and mechanical equipment- Selecting pipes’ sizes and performing stress analysis- Preparing PI&Ds and pipeline 2D & 3D layouts- Supervising the installation of the CBM system in the Gambian River- Organizing the commissioning process of the mechanical work- Handling different managerial tasks on site Construction of GamPetroleum Storage Facility Company Ltd. (55,000 mT)- Installing of piping, offshore pipelines and mechanical equipment- Selecting pipes’ sizes and performing stress analysis- Preparing PI&Ds and pipeline 2D & 3D layouts- Supervising the installation of the CBM system in the Gambian River- Organizing the commissioning process of the mechanical work- Handling different managerial tasks on site

Education

  • Notre Dame University
    Bachelor of Engineering (BEng), Mechanical Engineering
    2001 - 2007
  • Beirut Evangelical School for Boys and Girls
    Baccalaureate II, Life Sciences
    1985 - 2001

Community

You need to have a working account to view this content. Click here to join now