Ramy Marzouk
Project Manager at MEC (Doors&Gates)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Arabic Native or bilingual proficiency
-
English Professional working proficiency
Topline Score
Bio
Experience
-
MEC (Doors&Gates)
-
Egypt
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Project Manager
-
Oct 2021 - Present
Projects : 1-El-ahly Banks 2-Bank du caire 3-Bank Masr 4-Central bank of egypt new capital 5-Mall of egypt 6-Cairo fistival 7-Central press at new capital of egypt 8-Berenice Troglodytica Projects : 1-El-ahly Banks 2-Bank du caire 3-Bank Masr 4-Central bank of egypt new capital 5-Mall of egypt 6-Cairo fistival 7-Central press at new capital of egypt 8-Berenice Troglodytica
-
-
-
Triennium Lift
-
Saudi Arabia
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Senior Electrical Engineer
-
May 2019 - Oct 2021
Projects name: Anas el demeshky – SIAC in new capital of Egypt Position Role: Installation and maintenance for several kinds of elevators that required to deal with Electronics and Hydraulic. Coordinate various electrical projects and are responsible for preparing project documents, developing budgets, meeting, client requirements, implementing project procedures, and making sure the project is completed on time and within budget. Leading and supervising a team of engineers and technicians. Show less
-
-
-
Security Innovation
-
United States
-
Computer and Network Security
-
100 - 200 Employee
-
Mechatronics Engineer
-
Jan 2018 - Apr 2019
Projects name: Nile corniche hotel- Zohr gas field - siemens el Sokhna – Bank masr – El Salam car park Position Role: Coordinate with consultant around all the specs of the project. Ensure proper performance and effectiveness of systems and demonstrate adequate planning of Low Current Systems. Supervise activities and ensure the proper implementation of the related low current systems. Ensure the regular verification, implementation, maintenance, and functionality of the low current system with the light current team. Ensure the installation, maintenance and monitoring of systems status. Validate system functionality by executing the operational checklist in order to ensure that all equipment is present and working properly. Show less
-
-
-
Prestolite Factory
-
Cairo, Egypt
-
Maintenance Engineer
-
Jul 2017 - Dec 2017
Position Role: Following maintenance schedule system for all the machines. Following the scope of the battery production. Work on the AutoCAD to make designs for batteries. Position Role: Following maintenance schedule system for all the machines. Following the scope of the battery production. Work on the AutoCAD to make designs for batteries.
-
-
-
Coprosa Prime
-
New Cairo Capital Of Egypt
-
Electrical Manager Engineer
-
Jun 2016 - Jun 2017
Project Name: Construction Of 44 Residential Buildings Position Role: Oversee and direct electrical projects from conception to completion. Review the project in-depth to schedule deliverables and estimate costs. Coordinate and direct electrical workers and subcontractors. Plan ahead to prevent problems and resolve any emerging ones. Analyze, manage and mitigate risks. Ensure quality electrical standards and the use of proper electrical techniques. Show less
-
-
-
Prime elevator
-
Cairo, Egypt
-
Maintenance Engineer
-
Mar 2014 - Apr 2016
Position Role: Following the maintenance schedule system "Electrical". Coordinating with consulting office to be familiar with the new shop drawing. Plan ahead to prevent problems and resolve any emerging ones under the rule of safety. Pitching works. Work on the documentation for ever project , AutoCAD drawings. Position Role: Following the maintenance schedule system "Electrical". Coordinating with consulting office to be familiar with the new shop drawing. Plan ahead to prevent problems and resolve any emerging ones under the rule of safety. Pitching works. Work on the documentation for ever project , AutoCAD drawings.
-
-
-
Military
-
Egypt
-
Maintenance Engineer
-
Mar 2013 - Mar 2014
Project Name: Asphalt mixer. Position Role: Making the schedule for corrective maintenance and preventive maintenance (weekly, monthly). Maintenance for pneumatic system and hydraulic system weekly. Working on electrical system, mechanical system and control for the asphalt mixer. Studying all design drawings, mechanical cut sheets and mechanical equipment data sheets. Studying all parts of the asphalt mixer to be familiar while applying the maintenance. Project Name: Asphalt mixer. Position Role: Making the schedule for corrective maintenance and preventive maintenance (weekly, monthly). Maintenance for pneumatic system and hydraulic system weekly. Working on electrical system, mechanical system and control for the asphalt mixer. Studying all design drawings, mechanical cut sheets and mechanical equipment data sheets. Studying all parts of the asphalt mixer to be familiar while applying the maintenance.
-
-
Education
-
Higher Technological Institute
Bachelor’s Degree, Mechatronics, Robotics, and Automation Engineering -
Yousif El-Sebaey Experimental Language School
High School, High School Degree( Very Good )1990 – 2003