Ramesh Shanmugam

Assistant Manager at SUNGOV
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tamil Nadu, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Assistant Manager
      • Dec 2019 - Present

      • Costing and Estimation of Pressure Vessel and Filters for various government and Private organisation. • Costing and Estimation of Pressure Vessel and Filters for various government and Private organisation.

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Mechanical Design Engineer
      • May 2019 - Nov 2019

      • ASME Audit document Preparation for getting certificate.• Heat Exchanger Tube Bundle Comments Updation.• Vessel Drawing checking and review then comments updating and submit to client. • ASME Audit document Preparation for getting certificate.• Heat Exchanger Tube Bundle Comments Updation.• Vessel Drawing checking and review then comments updating and submit to client.

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Mechanical Design Engineer
      • Aug 2017 - Oct 2018

      a) ASME Audit Preparation of document for getting certificate.b) Bill of Material, Design Calculation, General Arrangement and Detail Drawing and Material Purchase Requistiion Preparation of Oil and Gas Equipment. a) ASME Audit Preparation of document for getting certificate.b) Bill of Material, Design Calculation, General Arrangement and Detail Drawing and Material Purchase Requistiion Preparation of Oil and Gas Equipment.

    • Senior Design Engineer & Later Promoted as Assistant Manager
      • Jun 2014 - Jun 2017

      Experience in static Equipment design. Experience in static Equipment design.

    • Mechanical Engineer
      • Dec 2010 - May 2014

      Design Calculation Preparation, Drawing Checking, Procurement of materials for Fabrication activity, Deputation to Abudhabi and Dubai for Short term assignment for design work, ISO activity as a Internal Auditor and also manual preparation. Design Calculation Preparation, Drawing Checking, Procurement of materials for Fabrication activity, Deputation to Abudhabi and Dubai for Short term assignment for design work, ISO activity as a Internal Auditor and also manual preparation.

    • United Arab Emirates
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Design Engineer
      • Jul 2006 - Oct 2010

      i) Development of Cutting layout Plan from ISO metric drawing for Desalination Project work by using CNC program and Miter Program Development for Elbow.ii) Pressure Vessel Drawing Preparation.iii) PV Elite Analysis Software learned and worked.iv) Dish Forming drawing preparation.v) Co-ordination with Authorized Inspector for Design Review i) Development of Cutting layout Plan from ISO metric drawing for Desalination Project work by using CNC program and Miter Program Development for Elbow.ii) Pressure Vessel Drawing Preparation.iii) PV Elite Analysis Software learned and worked.iv) Dish Forming drawing preparation.v) Co-ordination with Authorized Inspector for Design Review

    • CAD Engineer
      • Aug 2005 - Jun 2006

      Drawing Co-ordination work with Tyre Building machine work shop.Modelling and Assembling of components by using PRO-E Software. Drawing Co-ordination work with Tyre Building machine work shop.Modelling and Assembling of components by using PRO-E Software.

    • Engineer
      • Apr 2001 - Apr 2005

      1.Fabrication of Non pressure parts of Boiler Ducts, Hoppers, chute pipe andsupporting structures (Beams, channels and Angles). Welding used SMAW(Shield Metal Arc Welding) & SAW (Submerged Arc Welding) Techniques.2. Production & Inspection of Supporting Structures, Ducts, Hoppers & Chute Pipes3. Provided details for edge preparation to suit the heavy structures.4. Provided Production instructions from plate joining to Assembly stage.5. Assigning welding instructions to carry out further process.6. Prepared Dimension report and submitted for Inspection.7. Technical Interaction with Quality Inspector

Education

  • Bharathidasan University
    Bachelor of Engineering - BE, Mechanical Engineering
    1996 - 2000

Community

You need to have a working account to view this content. Click here to join now