Ramadhan Dwi Prasetyo

at PT. Perkebunan Nusantara XIII (Persero)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Samarinda, East Kalimantan, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Farming
    • 1 - 100 Employee
      • Feb 2022 - Present

      • Mar 2021 - Jan 2022

      Responsibilities: - Planned a schedule of processing (resources and raw material), machine condition and number of manpower in the process of production.- Responsible in the target of processing to pay attention to the quality, the efficiency, results of laboratory analysis, results of water and sewage processing.- Supervise the work of manpower, machine processing, losses in the process of production, cleanliness, the safety of work and security.- Coordinate with manager, head of assistant, laboratory assistant, maintenance engineer assistant, foreman, operator to evaluate and presented about results of processing. Show less

      • May 2020 - Feb 2021

      Responsibilities: - Planned a schedule of processing (resources and raw material), machine condition and number of manpower in the process of production.- Responsible in the target of processing to pay attention to the quality, the efficiency, results of laboratory analysis, results of water and sewage processing.- Supervise the work of manpower, machine processing, losses in the process of production, cleanliness, the safety of work and security.- Coordinate with manager, head of assistant, laboratory assistant, maintenance engineer assistant, foreman, operator to evaluate and presented about results of processing. Show less

      • Jan 2020 - May 2020

      Responsibilities:- Prepare the needs daily and monthly of manpower, made a map of the work program production and maintenance field. - Made analysis and do the work in accordance with the guidelines of planning, implementation of the work and constraint against operations.- Optimize potential production to supervise the activity of against the work of maintenance routine and the process of harvesting according to the procedure and the target.- Responsible for the plan to work, needs of the manpower, harvest and results of the crop.- Evaluation of achieving the target in daily and monthly and presented to the manager and head assistant.Achievement: With the total area plants produce 452,26 Ha is able to increase the production and minimizing missed the fruit that is not transported. Show less

      • Sep 2019 - Jan 2020

    • Indonesia
    • Industrial Automation
    • 1 - 100 Employee
      • May 2019 - Aug 2019

      • Feb 2019 - Apr 2019

      Project maked a QC (Quality Control) Tool to Check Function in Parts of 7 Segment Digital Clock. Project to Produced the NTP (Network Time Protocol) Sync Digital Clock used as the timepiece at the Airport or Hospital.Responsibilities:- Do the inspection of incoming material (checked the components function used a multimeter).- Perform periodic checks on results of production (checked the components function).- Reported the every finding defect when incoming or production material. - Soldered components, such as power modul and display. - Assembled the parts (acrylic cover and display to frame). - Packaged the product and delivered to customer.Achievement: Finished the 34 pieces of NTP Sync Digital Clock before the deadline and delivered to customer with team. Show less

    • Indonesia
    • Airlines and Aviation
    • 700 & Above Employee
    • Student Internship at Industrial Gas Turbine Part Repair Department
      • Nov 2017 - Dec 2017

      Responsibilities: - Project Design 3D/2D Checking Fixture for Stator Blade 1st Nozzle of Part Industrial Gas Turbine used SolidWorks Software. - Observation and Learned the Process of Repair and Maintenance used NDT (Non Destructive Test) method: Inspection (Visual, Dimensional used Coordinate Measuring Machine), Welded, and Coated. Achievement: The Project Design Checking Fixture will be made by the Vendor to Accomodated the Amount of Stator Blade 1st Nozzle Segment Industrial Gas Turbine. Show less

Education

  • Universitas Islam Indonesia
    Bachelor's degree, Mechanical Engineering
    2014 - 2018
  • SMA Negeri 3 Samarinda
    Ilmu Alam (Natural Sciences)
    2011 - 2014

Community

You need to have a working account to view this content. Click here to join now