Ram Kumar
Junior Engineer at Northern Railway- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Hindi Native or bilingual proficiency
-
Punjabi Limited working proficiency
-
Urdu Elementary proficiency
Topline Score
Bio
Experience
-
Northern Railway
-
India
-
Rail Transportation
-
200 - 300 Employee
-
Junior Engineer
-
Aug 2021 - Present
-
-
App. Junior Engineer
-
Jul 2020 - Aug 2021
Junior Engineer/Track Machines
-
-
-
Mahindra & Mahindra Ltd., FES, Swaraj Division
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Assistant Manager
-
Sep 2018 - Mar 2019
Solely responsible for in-time material supply to the assembly line throughout the shift.Additional Responsibilities:* Maintaining and controlling line-side inventory.* Evaluating material shortage and intimating the same to sourcing. * Maintaining 5S in the Stores Area and updating related documents.* Manpower allocation and control.* Line rejection control and resolution.* Chasing and expediting receiving of parts from vendors.* Implementing Safety norms in Stores Area and reporting & resolving safety issues, if any. Show less
-
-
GAT
-
Sep 2017 - Aug 2018
• Machine Shop Relayouting: Active participation in Machining Shop Relayouting. 28 Machines shifted in stipulated time frame. • Machine installation and commissioning: 4 HMCs (2 Starrag & 2 Mazak) and 3 retrofitted SPMs.• Capacity Ramp-Up: Actively participated in capacity ramp-up from 200 to 250 tractors/day.• Lift housing changeover: Lift Housing machining switched from 735 to 744 model on the existing machines. Complete line also made compatible to produce both models.• Dust Collector Installation & Commissioning: To arrest hazardous casting dust from the machine shop, 4 dust collectors installed on major dust generating machines in Differential Housing line.• Gear Box Lifter Installation: Initiated and coordinated installation of Gear Box Lifter and overhead conveyor for easy passage through the aisle underneath and smooth material movement.• Safety ticket closure: Resolving safety tickets under ME-HMS’s responsibility. Reached a closure percentage of 78% from 25%. Newer tickets resolved within target timeframe.• Compatibility projects: Adapting machining lines so that it is capable of machining different variants with a minimum setup time.• New Product Introduction: Active participation in new product introduction and SOVP• Managing and Implementing ECN• Handling SAP activities• Poka-Yoka Implementation: Initiated and organized Poka-Yoka implementation for addressing safety issues and controlling rejection.• Documentation: Preparing & updating documents (Process sheet(s), PFMEA, PFD, CP) for new component/ECN/new machine introduction. Show less
-
-
-
TT Consultants
-
United States
-
Business Consulting and Services
-
200 - 300 Employee
-
Patent Engineer
-
Jan 2017 - Jun 2017
Exposed to latest technologies while Patent searching (Invalidation, Infringement, Prior Art). Got good knowledge of Orbit and Thomson Databases. Exposed to latest technologies while Patent searching (Invalidation, Infringement, Prior Art). Got good knowledge of Orbit and Thomson Databases.
-
-
-
Four-S HR Partners
-
India
-
Human Resources Services
-
1 - 100 Employee
-
Summer Intern
-
Jun 2016 - Jun 2016
Got familiar with boiler manufacturing and fabrication processes. Got familiar with boiler manufacturing and fabrication processes.
-
-
-
Chandigarh Transport Undertaking(CTU) workshop
-
Chandigarh Area, India
-
Summer Intern
-
Jun 2015 - Jun 2015
Hands on experience on service, maintenance and repair of Ashok Leyland Buses (Gear Box, Differential, Brakes, Engine). Hands on experience on service, maintenance and repair of Ashok Leyland Buses (Gear Box, Differential, Brakes, Engine).
-
-
Education
-
Panjab University
Advanced diploma course, Urdu -
Panjab University
BE, Mechanical Engineering -
Jawahar Navodaya Vidyalaya, Chandigarh
12th, Science(Non-medical)