Rakesh Singhania
Senior Project Engineer at AIC INFRASTRUCTURES PVT. LTD.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
AIC INFRASTRUCTURES PVT. LTD.
-
India
-
Construction
-
1 - 100 Employee
-
Senior Project Engineer
-
Jun 2022 - Present
Name of Project : 1.Refurbishment of Ahmadabad Airport - Terminal - T1 & T2, 2.Airside design for Ahmedabad Airport Work Profile :- : SITC Up to 30 meter high mast : SITC Up to 11 meter street light pole : SITC MV Switchgear, MV Cabling, Penal, ICT work, CCTV : SITC AGL work, Perimeter road lighting Job Responsibility : Responsible for maintained MAS, MIR, IR, MR & Material Inspection. Planning, Execution, Supervision of Sites. Maintained the all electrical project , maintenance ,EHS & inspection related documents. Co-ordination with client ,Weekly meeting Target v/s Progress . Interaction with sub-contractors for material supply, Progress & allot the work. Client & Contractor billing. Show less
-
-
-
Bajaj Electricals Ltd
-
India
-
Computers and Electronics Manufacturing
-
700 & Above Employee
-
Senior Project Engineer
-
Sep 2015 - Dec 2021
Project Details : SAUBHAGYA YOJNA (UP MVVNL) : DDUGJY (MP) : RGGVY (XII Plan) Job Responsibility : Camp Planning & Progress upload on UP portal. Planning of monthly targeted village. Running & Retention Billing of sub- contractors, Reconciliation of material, Bee Closure in Bajaj Leap Ahead. Making of Handing Over, MRN, BOQ. Planning, Execution, Supervision of Sites. Maintained the project related documents. Guide the survey team for villages survey and submit the survey reports. Co-ordination with Nodal, A.E. & J.E. & PMA Interaction with sub-contractors & allot the work. Show less
-
-
-
Fedders Llyod Corporation Limited
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
Site Engineer
-
Nov 2012 - Sep 2015
Project Details : Feeder Separation Job Responsibility : - Responsible for safety of man power, Shutdown activity & materials. Construction of new 11kv lines, LT lines, and 11/0.4 kva Distribution Transformer and meter connections including house wiring. Erection, Testing, commissioning of new11KV feeder line & separation of village mother DTR form agriculture line. Preparation of time to time site material requirement and continuous follow-up with store. Maintain safety & quality standard in execution. Mobilization of labor for site execution Show less
-
-
-
A2Z Group
-
India
-
Facilities Services
-
1 - 100 Employee
-
Assistant Engineer
-
Nov 2009 - Nov 2012
Project Details : HVDS & New T/Well Connection. Job Responsibility:- Conversion of Agriculture LT line into 11kv lines & installation of 10 Kva,16 Kva,25 Kva DTR as per consumer connection Capacity Dismantle of agriculture mother DTR & submit in client office. Responsible for safety of man power, Shutdown activity & materials. Erection, Testing, commissioning of 11KV line HT/LT Pole mounted substation (DTR). Preparation of time to time site material requirement and continuous follow-up with store. Mobilization of labor for projects execution Maintain safety & quality standard at Site. Show less
-
-
-
Temptation Foods Ltd.
-
Food and Beverage Manufacturing
-
1 - 100 Employee
-
Electrician
-
Oct 2008 - Jun 2009
-
-