Rakesh sahi

Chief Engineer at Punjab State Power Corporation Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Utilities
    • 400 - 500 Employee
    • Chief Engineer
      • Jun 2014 - Dec 2015

      Responsible for Distribution system of district Kapurthala , Jalandhar, Hoshiarpur and Nawansher Punjab.Managed a team of 9000 people and Revenue of 33000 million Annually Energy losses were decreased by 2.5 % leading to a revenue Benefit of 1000 million in 1 year and 6 months

    • Chief Engineer
      • Aug 2013 - Jun 2014

      Responsible for submission of Annual revenue return and Traiff of PSPCL on the basis of which the traiff for the year 2014- 2015 for Punjab was decided by Punjab State Electricity Regulatory Commission (P.S.E. R.C)

    • Deputy Chief Engineer
      • Dec 2008 - Sep 2013

      As Director of Enforcement was responsible for detecting theft of Power and Energy Auditing Responsible for Maintenance and Protection of 153 (66kV) substation and Transmission line ranging 2000km.Managed a team of approx 3000 people who were responsible for Distribution of Power Supply at Mohali , Patiala Sangroor , Ropar Distric

    • India
    • Facilities Services
    • 1 - 100 Employee
    • Additional SE Store
      • Sep 2007 - Dec 2008

      Manged 5 stores which were responsible all types of materials required to support the Punjab State Electricity Board for new Erection and Maintenance of Power Supply in South Zone Punjab Manged 5 stores which were responsible all types of materials required to support the Punjab State Electricity Board for new Erection and Maintenance of Power Supply in South Zone Punjab

    • Hospitals and Health Care
    • 700 & Above Employee
    • Hospital Engineer
      • Sep 2006 - Sep 2007

      1) Maintenance and Erection a) All 11kV Substation mounting to 25MW b) Diesel Generator Set upto 1000kVA c) Lifts d) Air Conditioning System e) Street Lights 2) Electrical Area Planning and Implementation for Eye Center and Cardiac Center 3) Managed the Power Distribution of Hostel ,Hospital and Residential Area 1) Maintenance and Erection a) All 11kV Substation mounting to 25MW b) Diesel Generator Set upto 1000kVA c) Lifts d) Air Conditioning System e) Street Lights 2) Electrical Area Planning and Implementation for Eye Center and Cardiac Center 3) Managed the Power Distribution of Hostel ,Hospital and Residential Area

    • Senior Executive Engineer
      • Nov 2002 - Sep 2006

      Managed a team of 800 people who were looking after distribution system and erection of 11kV and LT lines as well as installation of new distribution transformer

    • Assitance Executive Engineer
      • Jul 1982 - Nov 2002

      1) To look after distribution of Power Supply at Various Places such as , Mohali, DeraBassi,Kurali,etc2) Erection of 66kV/132kV/220kV Transmission Lines with approx distance covering 300 KM a) Received Letter of Appreciation from Chief Engineer Transmission for Erection of 220kV line from RTP(Ropar) to Mandi Gobindgarh in a Record Timescale3) Erection of 66kV/132kV/220kV Power substation upto 100 MVA Transformer. a) Received a Letter of appreciation from Chairman of Punjab State Electricity Board in the year 2000 for Installation of 100 MVA Transformer (Location : Mohali) in record time of 16 days before that 100 MVA transformer were used to be installed in 30 days 4) Maintenance of 66kV/132kV/220kV Substation and Transmission Lines Show less

    • Building Construction
    • 1 - 100 Employee
    • Assitance Engineer Electrical
      • Jun 1979 - Jun 1982

      Maintenance of Electrical Side of Paper Mill To look after Generation of 8Mega Watt Turbo generator set at 6.6kV Maintenance of Electrical Side of Paper Mill To look after Generation of 8Mega Watt Turbo generator set at 6.6kV

Education

  • Thapar Institute of Engineering and Technology
    Bachelor’s Degree, B. Tech Electrical Engineering
    1975 - 1979

Community

You need to have a working account to view this content. Click here to join now