Rajkumar Tewari

Assistant General Manager Survey at SRM CONTRACTORS PRIVATE LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jammu, Jammu & Kashmir, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Construction
    • 1 - 100 Employee
    • Assistant General Manager Survey
      • Jun 2021 - Present

      Construction Professional In surveying for the past 13 years. Seeking a challenging and rewarding opportunity in the industry which is in line with my academic background and which effectively utilizes my analytical and technical skills with high degree of dedication and endurance towards the attainment of the organizational and personal goals and objectives in the field of surveying of civil infrastructure projects. Construction Professional In surveying for the past 13 years. Seeking a challenging and rewarding opportunity in the industry which is in line with my academic background and which effectively utilizes my analytical and technical skills with high degree of dedication and endurance towards the attainment of the organizational and personal goals and objectives in the field of surveying of civil infrastructure projects.

    • India
    • Construction
    • 700 & Above Employee
    • Survey Manager
      • Jun 2019 - Jun 2021

      Delhi - Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Haryana. Consultant: FP India Project Management Consultancy Services Pvt. Ltd. Project Cost: Rs. 2200 Cr. Construction of Access Controlled Eight lande divided carragewary starting at Sohna - Gurugram Road (NH-248 A) near Hasanpur Sohna Village and end chainage 47+000 befor village Dandil kalan (18+500 to 47+000)  Total line & level handling with design works of project supporting with team.  Land accusation works before appointment date start of project  Horizontal & vertical control point (TBM& Traversing) rechecked &completed.  Reconnaissance Survey for Highway projects  Checking of site executed items related to survey works is fully responsible and gets approval regularly from consultant.  Survey work daily basis for client certification & Survey Pro-forma records.  Analyze the Engineering Drawings and other technical processing for the project initiation.  Overseeing the total execution of work and dealing with contractors & subcontractors.  Earth works/Billing/OGL/ Show less

    • India
    • Construction
    • 700 & Above Employee
    • Assistant Manager
      • Mar 2016 - Jun 2019

      Project: 45 KM Long Udhampur to Ramban Road project (HILL PROJECT) Client: National Authority of India Consultant: Segmental Consulting Pvt Ltd.  Working on the project of construction of Structural & Bitumen Road for Mass Rapid Transport Project for NHAI.  Carrying out the surveys with the closed traversing method form GPS to GPS and TBM work on the stretch from 67 km to 88 Km of the project.  Responsible for surveying and marking of NB (North Bound) and SB (South Bound) for excavation, Sub-grade, GSB, WMM, DBM and Kerb wall from the stretch 67 Km to 88 Km.  Checking slips form marking, carrying pier cap marking, desk slab and girder erection etc. in structure for bridges/ flyovers. Total number of Minor Bridges 35& Major Bridge 08 nos.  Handling sites, coordinate construction activities, provide technical inputs for methodologies of construction & coordination with site management. Oversee & manage the Quantity Calculation for Client & Sub-Contractor Bill while handling Estimation, costing and rate analysis of various items of construction. Show less

    • Railroad Equipment Manufacturing
    • 700 & Above Employee
    • Senior Surveyor
      • Jul 2013 - Feb 2016

      DELHI METRO (KASHMERE GATE- TO JAMA MASJID PROJECT) Surveyor (Grade-VII) Project: CC-07 – “Design & Construction of Tunnel by Shield TBM and Lal Quila & Kashmere Gate Stations by Cut &Cover Method between Jama Masjid and Kashmere Gate for Underground Works under Delhi MRTS Project of Phase–III”. Client: DMRC Project Cost: Rs. 559.90 Cr. Contract Period -42 Months Station : 2nos Lal Quila & Kashmere Gate Station (Underground) Tunnel Length : Kashmere Gate –Lal Quila (1351m up line & 1357m done line) Lal Quila- Jama Masjid (649.1 up Line & 639.6m down line) Cut & cover : 330m (110 Cut & Cover and NATM 220 mtr)  Layout of Station structure.  Traversing.  King post 3-D Monitoring of TBM chamber layout of decking reference centre line marking of king post pile Tubular pile soldier pile tension pile. Topography survey layout of some shiver system muck pit.  Monitoring survey: Monitoring of building & Monitoring of surface line.  Responsible for all Site Survey works for the project corridor of Length 31.54 Km.  Responsible for making of site layout plan for roads and structures as per approved drawing.  Fixation of TBM and controlled station for the entire project.  Responsible for periodical TBM and Controlled Points checking and get approval from concerned client & consultant accordingly. Show less

    • Surveyor
      • Apr 2010 - Jun 2013

      Surveyor (Grade-ER1) Project: 65 Km long Jammu – Udhampur Road Project on NH - 1A (HILL PROJECT) Client: NHAI Project Cost: Rs. 1600 Cr.  Working on the project of construction of Structural & Bitumen Road for Mass Rapid Transport Project for NHAI.  Carrying out the surveys with the closed traversing method form GPS to GPS and TBM work on the stretch from 0 km to 35.6 Km of the project.  Responsible for surveying and marking of LME (Left Median Edge) and RME (Right Median Edge) for excavation, Subgrade, GSB, WMM, DBM and Kerb wall from the stretch 26 Km to 35.6 Km.  Accountable for profile marking, RIB and Wall Beam erection in the tunnels along the project (2km). Checking slips form marking, carrying pier cap marking, desk slab and girder erection etc. in structure for bridges/ flyovers. Total number of Bridges 14 NOS (Major 7 Minor 7) VIADUCT– 11 NOS (Major 5 Minor 6)  Preparing the various statements and bills while reconciling them on regular/ monthly basis, ensuring proper flow of material without any information\payment gap.  Performing field surveying for the road projects including installing surveying construction stakes, tying out existing intersection ties, and locating or establishing vertical and horizontal control, right of way, monuments, corners, boundaries, and property lines.  Topography of CD, Bridge & obstruction drawing prepared in AutoCAD.  Preparing Working drawings of CD works, Minor bridges, Box  Engineer, quantity calculation for billing.  Every month stock drawing prepared in AUTOCAD & SURFER SOFTWARE. Supervision of residential colony and supporting the mobilization team for construction of 3 crusher plant and to mix plant, Batching plant and WMM plant for two packages & quarry. Show less

Education

  • Noble Institute of Science & Technology
    Bachelor's degree

Community

You need to have a working account to view this content. Click here to join now