Rajith Madhushankha

Plant Engineer at Vidullanka PLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Colombo, Western Province, Sri Lanka, LK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Sri Lanka
    • Renewable Energy Power Generation
    • 1 - 100 Employee
    • Plant Engineer
      • Oct 2021 - Present

    • Higher Education
    • 100 - 200 Employee
    • Undergraduate
      • Nov 2016 - Oct 2021

    • Canada
    • Manufacturing
    • 700 & Above Employee
    • Engineer Intern
      • Dec 2020 - Aug 2021

      PROJECTS Improve The Energy Efficiency In The Thermal Energy System At Work Wear Lanka (2020-21) * To reduce the cost of thermal energy units. (Generation) Calculate startup and shutdown loss Power factor at the feeding point FD & ID Fan Synchronization * To improve specific thermal consumption per DP of the glove. (Distribution & Demand) Potential saving on insulation improvement Reduce flow loss by pipe network analysis. Improve thermal efficiency of ovens. Thermal oil leak root cause analysis Show less

    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Engineer Intern
      • Nov 2019 - Jan 2020

      * Identified operational problems while studying system functions and performance under supervision of shift engineers * Perform Conditional Base Monitoring programs & identify the performance of equipment such as motors,pumps etc. * Assit to all plant maintainace activity. * Studied plant operation manuals,SOP,PFD and PID. * Carried out repair activities turbine main oil pump(MOP). * Actively participated for preventive maintenance in the auxiliary boiler. Show less

  • Mahaweli Authority of Srilanka
    • Moragahakanda Power House
    • Engineer Intern
      • Feb 2019 - May 2019

      Moragahakanda 25MW Hydro Power Plant * Exposure in hydro power plant. * Turbine-Generator unit 30 day inspection * Control room operations using SCADA system Moragahakanda 25MW Hydro Power Plant * Exposure in hydro power plant. * Turbine-Generator unit 30 day inspection * Control room operations using SCADA system

Education

  • University of Peradeniya
    Bsc mechanical enginneering, Power and energy
    2016 - 2021
  • D.S.Senanayaka M.M.V. Ampara
    Advanced Level, Mathematics
    2005 - 2013
  • Lean and Green Solutions (Pvt) Ltd. Sri Lanka
    Lean White Belt Certificate Course, Lean Management
    2021 -

Community

You need to have a working account to view this content. Click here to join now