Rajesh Rajendran

Resident Technical Officer - Viaduct at JIB Specialist Consultants Pte Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Singapore, Singapore, SG
Languages
  • Tamil Native or bilingual proficiency
  • English Professional working proficiency
  • Hindi Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • IELTS General Training - 6.5
    IDP Education Ltd
    Mar, 2023
    - Nov, 2024
  • Resident Technical Officer Civil & Structural
    The Institution of Engineers, Singapore (IES)
    Aug, 2011
    - Nov, 2024
  • Resident Technical Officer Tunnel
    The Institution of Engineers, Singapore (IES)
    Apr, 2015
    - Nov, 2024

Experience

    • Singapore
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Resident Technical Officer - Viaduct
      • Oct 2021 - Present

      Integrated Train Testing Centre ITTC C190 (Viaduct) Tuas. - Supervision and inspection of Viaduct segment lifting, PT bar stressing, Pre-Stressing, Stitch joint casting, Post-tensioning, and grouting work. - Supervision and inspection for buildings, High-speed train track, Viaduct , waterbody temporary decking works, and bore pile works. - Involving supervision for the construction of the operation control tower, Admin, and workshop building in accordance with project specifications, and approved drawings. - Supervision of Underpass excavation, shoring, and retaining wall construction. - Monitoring and observing instrumentation readings - Maintaining health and safety in accordance with MOM requirements Show less

    • France
    • Environmental Services
    • 700 & Above Employee
    • Site Engineer / RTO
      • Nov 2019 - Oct 2021

      Deep Tunnel Sewerage System Phase 2 T-08 PUB Project - Supervision for mining and construction of 4 tunnels by Slurry TBM. - Involving supervision for the construction of bored tunnel segments in accordance with project specifications, and approved drawings. - Checking the ring building quality aspects such as steps and lips, bird mouth, pitching, and rolling after the ring building. - Keep strict Quality checks on various tunnelling activities i.e. checking KPI test, primary and secondary grout quality & quantity, and excavation quantity. - Close monitoring of the instrumentation readings which are installed along and adjacent buildings of the tunnel. - Secondary lining formwork inspection, and casting monitoring. - Shaft Excavation, caisson wall rebar inspection and casting. - Mined tunnel excavation, face mapping, water ingress test, BRC, lattice girder inspection, and monitoring shotcrete. • TBM Type: Slurry TBM • Manufacturer: Herrenknecht • Diameter: 7.105mx1.6 m , 4.955mx1.2m,4.695mx1.4m and 4.695mx1.3m • Tunnel Segments: 1863,1973,2269 and 1007 numbers • Geological type: SIII, SIV, SV. • 3xMined tunnel Show less

    • Singapore
    • Civil Engineering
    • 1 - 100 Employee
    • Resident technical officer - Station & Tunnel
      • Oct 2016 - Oct 2019

      Thomson East Coast Line Stage 6 Contract T310 - Supervision for mining and construction of twin tunnels of 6.6m outer diameters and cross passages. - Supervision of TBM delivery, and assembling by following required inspections as per specification for launching and dismantling of TBM as well. - Supervision of Mining & checking muck skip volume, grout volume, gantry weight & conveyor weight. - Close monitoring of the instrumentation readings which are installed along and adjacent buildings of the tunnel. - Supervised all defect rectification works i.e., repair of damaged segments and PU grouting for the water leaking segments and repair of the segment dry cracks. - Supervision of 1st stage casting, 1 cross passage, 2 adit excavation and shotcrete, special waterproofing works and SWC Brackets installation and testing. - Maintain Health & safety in accordance with MOM requirements. • TBM Type: EPB TBM • Manufacturer: Shanghai Tunnel • Diameter: 6.63m • Tunnel inner diameter: 5.8m • Tunnel Segments: 840,780,460 and 440 numbers • Geological type: Old Alluvium Soil, Marine Clay and Kallang formation. • Cross passage 9M • Lower Adit 10.5M • Upper Adit 12M • Construction of new Link way Show less

    • Singapore
    • Civil Engineering
    • 1 - 100 Employee
    • Resident Technical Officer- Civil & Structural
      • Mar 2012 - Sep 2016

      Projects:- 1. Thomson East Coast Line Stage 4 Contract T227 2. Contact 930, Construction & Completion of Ubi Station and associated Tunnels - Involving full-time supervision and inspection for various works such as DSM (Deep Soil Mixing), JGP works, Pipe-pile works, Sheet pile installation for temporary works, etc., - Supervision of Launch shaft excavation and strutting works. - Supervision of Bored pile construction works such as rebar inspection, depth confirmation, concreting, etc., - Verify segment type, key position, and TBM driving parameter sheet. - Involving supervision for the construction of bored tunnel segments in accordance with project specifications, and approved drawings. - Checking the ring building quality aspects such as steps and lips, bird mouth, pitching, and rolling after the ring building. - Monitoring of existing surrounding infrastructures during the construction of shafts and Tunnels going through. • TBM Type : EPB TBM • Manufacturer : KAWASAKI • Diameter : 6.63m • Tunnel inner diameter : 5.8m • Tunnel Segments : 673 and 672 numbers • Geological type : Old Aluminum Soil, Marine Clay, Granite G3, G4, and Kallang formation. Show less

    • South Korea
    • Construction
    • 1 - 100 Employee
    • Senior Civil Engineer
      • Sep 2010 - Mar 2012

      Projects:- 1. Contract C935 Sungei Road MRT Station and Tunnels (Down Town Line Stage-3), Singapore. 2. C920 Design and construction of Newton Interchange Station and Tunnels for Downtown Line 2 Project LTA Project, Singapore - Construction and supervision of Diaphragm wall, Re-bar cages fabrication, Barrette Pile by Over Cutting method and PRD (Percussion Rotary Drilling)., Cross wall, Slurry wall by Water Stop End method. - Coordinate with consultants, contractors, and sub-contractors on technical matters. - Check and scheduling of Structural reinforcement and formwork details. - Study detail Construction/Shop drawing and M&E drawing to avoid any delay during execution. - Attended regular technical meetings with consultants to solve technical issues. - Involved in assisting the Planning Team to deliver the material to the site. - Organized Labor management and material handling. - Liaise with clients and subcontractors to rectify the Non-Compliance Report and progress. - Conduct regular team meetings to keep the pace of a project - Prepared the daily progress report and minutes of meeting for the site progress meeting -Trained for maintaining Health and Safety on the work site. Show less

    • Oman
    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • May 2010 - Aug 2010

      Muscat Waste Water Scheme Project. Oman Muscat. - Construction and Supervision of Secant Pile shoring for manholes& Micro Tunneling for manholes 8 m dia. - Study detail Construction/Shop drawing and M&E drawing to avoid any delay during execution. - Involved in assisting the Planning Team to deliver the material to the site. - Organized Labor management and material handling. - Attended regular technical meetings with consultant to solve technical issues. - Conduct regular team meetings to keep the pace of a project - Prepared the daily progress report and minutes of the meeting for the site progress meeting. Show less

    • South Korea
    • Construction
    • 1 - 100 Employee
    • Civil Engineer
      • Feb 2008 - Apr 2010

      Projects:- 1. Al Turath Soaq Culture Village, Dubai Properties, Dubai UAE. 2. Al Salam Street Upgrading Tunnel Project Abhudabi Municipality- UAE. - Construction and Supervision of Diaphragm wall more than 1200 panels of various depths and soil profiles. - Construction and Supervision of Diaphragm wall of more than 300 Panels depth of 40m from GL. - Ensure that all the works are carried out in accordance drawing with the contract specification and quality requirements, - Testing of Bentonite with lab equipment to ensure shoring. - Check and scheduling of Structural reinforcement and formwork details. - Co-ordinate with consultant, contractor and sub-contractors on technical matters. - Arrange all inspection & co-ordination with QPS, engineers & contractor - Involved in assisting the Planning Team to deliver the material to the site. - Organized Labor management and material handling. - Conduct regular team meetings to keep the pace of a project - Prepared the daily progress report and minutes of meeting for the site progress meeting. Show less

  • VSL India Private Limited
    • Mumbai, Maharashtra, India
    • Site Engineer
      • May 2007 - Jan 2008

      Bandra Worli Sea Link Project Cable Stay Bridge Mumbai India. - Supervision of Pre-Stressing and Post-Tensioning works on Bridge Segment and Cable Stay. - Laying Tendons and Cables according to the drawing approval. - Ensure the tendon's position and marked before casting of the segment. - Stressing Cables by design calculation using high-pressure jack and place wedges. - Grouting tendons by cement mix according to the mixing procedure by using a grouting pump. - Check and scheduling of Tendons and Cables details. - Involved in assisting the Planning Team to deliver the material to the site. - Organized Labor management and material handling. Show less

Education

  • Birmingham City University
    Bachelor of Engineering - BEng Hons, Civil Engineering
  • State Board of Technical Education and Training
    Diploma of Education, Civil Engineering

Community

You need to have a working account to view this content. Click here to join now