RAJESH GUNASEKARAN

Senior Engineer-MEP at Lambsrock
  • Claim this Profile
Contact Information
Location
Chennai, Tamil Nadu, India, IN
Languages
  • English Professional working proficiency
  • Tamil Native or bilingual proficiency
  • Hindi Limited working proficiency
  • French Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Supervisor Competency Certificate No-C46517(C License)
    Electrical Licensing Board

Experience

    • India
    • Construction
    • 1 - 100 Employee
    • Senior Engineer-MEP
      • Mar 2023 - Present
    • Congo, The Democratic Republic of the
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Electrical Project Engineer
      • Oct 2020 - Nov 2022

      Project Handled: 1.Construction Project of an Apartment Building “RESIDENCE OKAPI” (Project value-20 Crore). BL-2+GF+11F (55 Apartments and Clubhouse). # Installation, testing and commissioning of HT panels SM6-24 IM-2 No’s/CM-1 No/QM-1 No (Make: Schneider: Ref.SM6-24)/ 630KVAd Distribution Transformer Indoor type /350KVA Prime rated continuous duty Diesel Generator Sets-2 No’s /Synchronization panel and Automatic transfer switch 1250A (ATS) / 60KVA UPS/APFC Panels(TGBT panel,TGC panels and TGR panel)/LT Panels-13 No’s/Enclosure distributor (10 modules)-14No’s/Resi9 Protection, Surface mounted enclosures and Plastic cable trunking # All internal electrical works conducting, wirings, SB fixing. # Installation, testing and commissioning of Low current Telecommunication system/Videophone system. Responsibilities: • Preparing the shop drawings, construction details, product data, material samples. • Material procurement planning & scheduling Preparation of purchase/material requisition in ERP system for deliveries of material at sites as per project timeline schedule & re-consolidation for electrical materials. • Reporting on progress of the project on a regular basis to top management/Client. • Coordination between MEP and civil drawings at the site. • Planning, Coordination for execution of Work as per design and work Schedule. • Support Electrical Head with electrical project establishment and closeout. • Maintaining and monitoring project plans, project schedules, work hours, budgets and expenditures. • Amendment quantity has been raised for Insufficient BOQ as per site requirement. • Taking responsibility for Design drawing, BOQ and all necessary documents for proper project functioning. Attending weekly review meeting with client, consultant & contractor and preparing Minutes of Meeting. Handling team of Site Engineers & Foreman's etc……. • Preparation of Invoices/Running account bills for ongoing/completed projects, Final Handover Documents and Layouts. Show less

    • United States
    • Construction
    • 700 & Above Employee
    • MEP Coordinator-Production
      • Aug 2019 - Mar 2020

      Projects Handled:1.Vaishnavi The square-Ibblur/BOSCH 605 & 603-Adugodi/Embassy 3A, Bangalore/Katerra-K10Responsibilities:• All the projects production drawings should be check with the shop drawings and finalized for daily production.• Any mistake in the production drawings should be highlight to the design team and the drawing should be revised then sent to production.• Ensuring all the MEP inserts are installed as per the production drawings/Planning and scheduling the manpower resources for weekly production.• Verify and quality check before dispatching the production elements with QA/QC team/Coordinate with the site team for any other related issues with MEP production elements. Show less

    • Electrical Engineer-MEP
      • Jul 2017 - Jul 2019

      Project Handled:1. Vaishnavi Serene-Yelahanka Value (32 Crore), Bangalore (G+4/8 blocks -895 Apartments)2. Prestige Finsbury Park (Mock-up)All internal electrical works conduiting,wirings,SB fixing, DB’s. (LP,FP,Socket,TV,Data) Testing of commissioning of DB’s. (TPN DB), Erection of perforated type cable trays.3. Construction of Office Building for INFOSYS LTD, Electronic city phase 2, (Value-25 Crore)# Installation, testing and commissioning of 1250KVA Distribution Transformer Make: Volt AmpIndoor type Dry type cast resin AN/AF cooling Type)/625KVA DG Sets-3 No’s Indoor type Prime rated continuous duty Diesel Generator/HT panels RMU-2 No’s andmetering cubical-1 No # Laying and testing of HT (240Sqmm)/ LT cables / Installation of Cable traysResponsibilities:•Reviewing submittals prior to submission to the client.•Review and analyze of MEP drawings, materials, schedules/program of works etc.•Co-ordination all electro-mechanical activities with various teams at site.•In-depth study of tender documents & BOQ, understanding & implementation of contractprovisions.•Handling site supervision, monitoring progress as per planning schedule and undertakingquality inspections.•Monitoring schedule impacts, measuring work done through RFI& ensuring timely response toRFI’s.•Conducting cross verification with materials department for the usage & availability of stocksusing the material tracking sheet.•Coordination and attending meeting with subcontractors, contractors, consultant and client.•Preparing the Quantity survey for VOWD reporting, contractual issues like invoicing, variationand EOT claim.•Forecasting, project budget control, resource allocation and management of labours.•Coordinating, reviewing construction and commissioning activities and obtaining approvalsfrom local authorities and handling over completed projects to the client for end use.•Preparation of Handover Documents with all related test certificates and as built drawings. Show less

    • Electrical Engineer
      • Feb 2016 - Oct 2016

      Project Handled: 1.Construction of regional Office Blog-Ministry of Housing, Sumail. •Installation, testing and commissioning of 11KV system, HT/LT Panels, 250KVA Distribution transformer and 250KVA DG Sets. •Laying, testing, glanding and termination of HT (120Sqmm) and LT (6-400sqmm) cables/Installation of Cable trays like perforated and ladder type. •Installation and testing of ISI type earthing and lightening arrester works. Project Handled: 1.Construction of regional Office Blog-Ministry of Housing, Sumail. •Installation, testing and commissioning of 11KV system, HT/LT Panels, 250KVA Distribution transformer and 250KVA DG Sets. •Laying, testing, glanding and termination of HT (120Sqmm) and LT (6-400sqmm) cables/Installation of Cable trays like perforated and ladder type. •Installation and testing of ISI type earthing and lightening arrester works.

    • India
    • Construction
    • 1 - 100 Employee
    • Electrical Project Engineer
      • Apr 2013 - Dec 2015

      Project Handled: 1. Installation of Electrical items for internal works for Villa &Tower at “The Village project" at Chennai (Value-1.1 Crore) # 18Villas, 29 Row houses andG+4 / 2 towers (48 Apartments). # Installation, testing and commissioning of 11KV system, Distribution transformer. (250KVA & 500KVA), HT/LT Panels and 500KVA DG sets. # Laying, testing, glanding and termination of HT and LT cables. # Erection of ladder type cable trays, lightning arrestor and earthing works. # All internal electrical works conduiting, wirings, SB fixing, DB’s. (LP, FP, Socket, TV, Data, Telephone) 2. Electricity Existing HV & MV Installation at BHARATHIDASAN UNIVERSITY (Value-1.5 Crore) # Installation, testing & commissioning of Oil filled, Kirloskar make Distribution transformer (800KVA-2 No’s), Sandwich type Godrej make bus duct (1250A-50Mtrs),11KV/630A, 26.3kA, Siemens make VCB Outdoor type HT Panel, MV Panels L&T make (ACB-1250A-4 no’s and APFC Panel (250KVAR), PWD type earth pit-20 no's and lightening arrester works. 3. Construction of Hostel and Faculty Building for Institute of Fisheries Technology (IFT) 4. Bagavathi Flats/Anantha Padmanabhan Flats/Vaishnavi Castle (36 Apartments) #Installation of Electrical (Internal + External) -All internal electrical works conduiting, wirings, SB fixing, DB’s. (LP, FP, Socket, TV, Data) Testing of commissioning of DB’s. Responsibilities: •Electrical works execution completed Phase-1 flats handed over to CRM/Ensuring quality services in co-ordination with contractor. •Contractor bill certification with joint measurement. •Designing project schedule and tracking the same/Liaising with contractor, consultant and client. •Preparing shop drawing and attending weekly review meeting with client, consultant & contractor and preparing Minutes of Meeting. •Sending Daily, Weekly and Monthly report to the Client. •Monitoring the Site and Checking for any issues and escalations. •Raising purchase requisition & re-consolidation for MEP materials. Show less

    • United States
    • Construction
    • 1 - 100 Employee
    • Electrical Site Engineer
      • Dec 2010 - Apr 2013

      Project Handled: 1. Proposed workshop for M/s Lanson TOYOTA, Pondicherry (Value-3 Crore) 2. ELECTRICAL INSTALLATION FOR THE PROPOSED BUILDING FOR “C&M DIGITAL” (Value-1.5 Crore) # All internal electrical works conduiting, wirings, SB fixing, DB’s. (LP, FP, Socket, TV, Data)Testing of commissioning of DB’s. (TPN DB, Seven segments DB and Vertical DB) # Laying, testing, glanding and termination of HT (150sqmm) and LT (6-400sqmm) cables. Erection of perforated type cable trays. # Installation and testing of ISI type earthing and lightening arrester works. Installation, testing and commissioning of 11KV system, MV/LV, APFC (250KVAR), AMF Panel. # Installation, testing and commissioning of Distribution transformer(250KVA, oil filled and ONAN type) and DG Sets(250KVA Air-cooled type). Responsibilities: • Review of Electrical drawings, single line diagrams/Erection key diagrams/ electrical equipment’s installation layout/Prepare and order the material requirements. • Responsible for Installation, testing and commissioning of Electrical Equipment’s • Responsible for day-to-day management of site, monitoring of work of Workers, Contractor subcontractors. Liaison between engineers and clients. Show less

    • Construction
    • 100 - 200 Employee
    • GET-Electrical
      • Apr 2010 - Oct 2010

      Project Handled: 1.Hydra Avenue (G+P+24+24+29) Responsibilities: •Verify the electrical drawings, Conduting and wiring on the slab Power layout, Lighting layout, Gas meter layout, Central battery layout, Fire fighting layout, Lightning & earthing layout, Low current layout, Telephone layout. •Verified all materials used for the construction and ensured that they were of Premium quality. •Operation and maintenance of 500KVA, 400KVA and 250KVA DG sets. Project Handled: 1.Hydra Avenue (G+P+24+24+29) Responsibilities: •Verify the electrical drawings, Conduting and wiring on the slab Power layout, Lighting layout, Gas meter layout, Central battery layout, Fire fighting layout, Lightning & earthing layout, Low current layout, Telephone layout. •Verified all materials used for the construction and ensured that they were of Premium quality. •Operation and maintenance of 500KVA, 400KVA and 250KVA DG sets.

    • Business Supplies & Equipment
    • 1 - 100 Employee
    • GET-Electrical Maintenance
      • Jul 2009 - Apr 2010

      Duties: •Operation and Maintenance of 500KVA MV/LV/11KV /433V Distribution transformer, Air Circuit Breakers, HV/LV switchgear, DG set (500KVA) and UPS. •Responsible for the switching operations and maintenance of all electrical distribution system. Attending the maintenance activities on transformers, DG sets, UPS, HV/LV panels, distribution boards, lighting systems, cabling and wiring. •Operation and Maintenance of Electrical equipment’s like motors, pumps, Cranes, Compressors, CNC machines, HVAC and MCC/PCC panels. •Responsible for identifying and repairing minor electrical faults. •Supervising the functions of troubleshooting & predictive / preventive maintenance for identifying areas of obstructions and reducing machinery downtime to minimum. •Handling Plant Layout changing and new machineries commissioning work. •Monitoring and Registering the EB, D.G Readings and maintaining power factor Unity/leading level. •Performed supervision on a 24/7 manufacturing unit on the work of the electricians. •Maintained the safety measures at the factory. Show less

Education

  • Sethu Institute of Technology, Anna University
    Bachelor of Engineering - BE, Electrical and Electronics Engineering
    2006 - 2009
  • V.S.V.N.Polytechnic College
    Diploma of Education, Electrical, Electronics and Communications Engineering
    2002 - 2005

Community

You need to have a working account to view this content. Click here to join now