Rajendran Venkatachalam
Project Manager at AGF Tecnik- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
AGF Tecnik
-
India
-
Construction
-
1 - 100 Employee
-
Project Manager
-
Jun 2020 - Present
-
-
Team Leader (Rebar)
-
Jul 2018 - Jul 2023
Ensure the weight breakdown information concerning bidding form/tender package/ scope/bid items. Studying the tender package and collaborating with the coordinators for Alternate price, Separate price, Unit rate, Contingency allowance, Test certificate requirements. Assist with project managers for extra to the contract NOC clearance. Keep tracking the project up to bid date for the latest update of addendum/ clarification /contractor requirements. QA checking of detailing drawings (Struc. dimensions controlled by related to Archi./Mech./Elec.; Rebar lap location based on the structural behaviour and project general notes & typical details; Release; Design information; Project standard; Contractor requirements) Reviewing the project specifications and general details. Also, conduct a meeting with team members regarding the work assignment/completion date/RFI/QA/etc. Give an intimation to the project coordinator to get supplier quotes for the Misc. items (before the bid date). Ensure sufficient information was given in estimation report for Misc. item easily understand the salesperson/coordinator & contractor Documenting & following up on important activities from clients & contractors. Maintaining the master document with all latest information for each release (Addendum, Post tender addendum, Tender package, Contract agreement, scope information, site instruction, Sketches) Contributes to team effort by accomplishing related results as needed. Arranging kick-off meeting with a project coordinator to discuss the actual needs & special requirements of the project to get clearance on the discrepancy information Design-build projects, Studying the projects specification & BOQ details. Preparing the agenda for the missing details to discuss with the Proj. Managers /Coordinators Checking the lap values with respect to ACI/RSIC/General Notes/Cover/Conc. Exposure case/ Concrete Grade/ Steel grade/ Steel Coating (Black/Galv./Epoxy/Stainless steel) Show less
-
-
-
ALECTO INTERNATIONAL BIM DESIGN AND ENGINEERING LLC.
-
India
-
Outsourcing and Offshoring Consulting
-
1 - 100 Employee
-
Group leader (Rebar Department)
-
Aug 2017 - Jun 2018
Coordination with managers regarding concrete casting schedule, and discussing the information for first priority & base requirements. Based on that submit shop drawings to the client. Ability to build and retain relationships with clients, suppliers, contractors, and other professionals. Checking the invoice of vendors & Maintaining the project database for all completed projects for background verification. Communicate & Co-ordinate with design Engineer/Client regarding Project standards & detailing Specifications Manage a team of 8 internal detailers, as well as manage external detailer’s projects Train all estimators and detailers and work to improve techniques and maintain quality control. Provide accurate detailed placement drawings using Rebar-cadd/RC cadd. Preparing change order & RFI Coordinate with the manager on fabrication status for addendum/Site instruction revision changes. Based on that re-release or additional bar list will issue. SOP preparation for each client Show less
-
-
-
Prothious Engineering Services
-
India
-
Design
-
500 - 600 Employee
-
Junior checker (Rebar Department)
-
Jul 2014 - Jun 2017
Manage project detailing, project scheduling, and ensure on-time deliveries. Provided accurate detailed placement drawings using Rebar-cadd/RC cadd. Ensure that all design information and project specifications are perfectly in the shop drawing & the way provided information is clear & easy for the engineer as well as the foreman QA checking for shop drawings & Bar Release. Assist with General Manager to prepare monthly target forecast plan, backlog details & resource allocation Managing a team (8+) Co-ordinate with team members to improve his performance and to deliver the shop drawings on time. Preparing Rfi’s and change notification. Coordinate with the manager on fabrication status for addendum/Site instruction revision changes. Based on that re-release or additional bar list will issue. Planning & Execution of additional environmental systems for improvements Show less
-
-
-
Tern engineering service
-
Chennai Area, India
-
Civil Engineer
-
Oct 2012 - Jun 2014
Assist with planning engineer on RA bills & make sure there are no duplicate qualities in the bill. Checking the contractor proposed measurement (quantities) with BOQ/POMI/Construction completed status/Drawing design information. Sketch preparation for the released quantities for easy understanding to all. Documenting any changes in design and updating to the planning engineer & project manager. Calculating the materials & checking the bills as needed (Concrete batching slip, steel purchase order, cement, etc…) For As-built projects, check the RA bill with the design information to ensure the quantities /method of measurements were correct. Preparation of Project progress report. Preparation of Reinforcement Schedule for Job Execution at the site. Preparing necessary presentation materials for meetings. Provided accurate detailed placement drawings using RC cadd &RGS. First level checking of detailing drawings and BBS & Preparation of bar bending schedules in Indian & Gulf standards. Show less
-
-
-
East Coast Construction Industries Limited
-
India
-
Construction
-
100 - 200 Employee
-
Assistant Engineer
-
Aug 2009 - Sep 2012
Ensure the bottom of excavation is undisturbed soil, level and free of all loose, soft & organic matter, and protected and kept dry until the concrete is placed. Thoroughly compact the base of the excavation prior to foundation construction. To density the soil loosened by excavation equipment. Backfilling monitor as per the project specification & coordinate with QC that the concrete achieved the required strength. Checking of formwork alignment, formwork joint patterns & watertight fitting. Monitoring the poured concrete formwork removal time & curing are as per specification & general norms. Checking of form work drawings with respect to the latest revision changes Observe & enforce all construction safety measures required by the corporation. Getting approval from them. Maintains operations by enforcing operational policies and procedures. Ensure the quality of all material based on the project standard and code standard (Concrete, Steel, Bitumen, Shuttering, Bearing, etc.). Cost analysis with site labor bill, a material bill, Machinery bill with zero cost report & estimation report. Confirm adherence to construction specifications and safety standards by monitoring project progress, inspection construction site, and verifying calculations and placements. Verify there are adequate installation clearances and no interferences with existing structural members, utilities, electrical & mechanical services. Protect existing and surface features from damage while work is in progress and repair damage resulting from work. Provide all shoring & underpinning required. CIP of Prestressing concrete box girder slab (PSC), Tie beam deck slab casting. Seating hose alignment fixing, Strands insert, Stressing pressure checking & coordination. Grouting pressure checking & Pile works. Execution marking for footing, pier , pier cap, Obligatory skew, Radial curve & rotary marking, Template preparing for difficult reinforcement, Show less
-
-
Education
-
Sathyabama University
Bachelor of Engineering - BE (P.T), Civil Engineering -
Goverment polytechnic college,trichy
Diploma, Civil Engineering -
St.Antonys high school, trichy