Rajeet Das

Field Engineer 2 at Skanska USA Civil Northeast, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
JE
Languages
  • Spanish Limited working proficiency
  • English Native or bilingual proficiency
  • Bengali Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • 30-Hour Construction Safety and Health
    OSHA (Occupational Safety and Health Administration)
    Mar, 2019
    - Oct, 2024
  • Boom Lift
    Ahern Rentals
    Feb, 2019
    - Oct, 2024
  • Rough Terrain Forklift
    Ahern Rentals
    Feb, 2019
    - Oct, 2024
  • Scissor Lift
    Genie – a Terex brand
    Jul, 2018
    - Oct, 2024
  • Engineer in Training (EIT) - Civil Engineering
    NCEES
    May, 2016
    - Oct, 2024
  • 4-Hour Supported Scaffold User & Refresher
    Site Safety, LLC
    Apr, 2017
    - Oct, 2024
  • Track Safety
    Metropolitan Transit Authority of New York City
    Jul, 2017
    - Oct, 2024
  • OSHA 10 Hour
    Federal Occupational Safety and Health Administration
    Jun, 2014
    - Oct, 2024

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Field Engineer 2
      • Jul 2022 - Present

      Project Value: ~$1.6 BillionPart of the first phase of The Gateway Program, the Portal North Bridge Project replaces the existing Portal Bridge over the Hackensack River in Kearny/Secaucus, NJ with a new, two-track fixed structure (consisting of three 400'-long Network Tied Arch spans) carrying two new tracks over 2.44 miles (6,700 linear feet of bridge and viaduct structure sections). Field Engineer assigned to West Lagoon. Currently assisting with planning, execution, and tracking of the following scopes of work: utility relocation on Belleville and Newark-Jersey City Turnpikes, installation of wick drains and surcharge (soil and lightweight cellular concrete) for ground settlement, installation and backfill of Precast T-Wall, construction (foundation to substructure) of two new concrete abutments, thirteen new concrete piers, construction of 500' long Construction Access Platform. Work occurs adjacent to existing and active 2-track railroad corridor. Show less

    • Field Engineer 2
      • Mar 2020 - Jul 2022

      Project Value: ~$450 MillionThe Hunts Point Interstate Access Improvement Project will provide improved access between the Hunts Point Peninsula and the Sheridan and Bruckner Expressways. The project will address structural and transportation operational deficiencies.Field Engineer assigned to 6 Stage Reconstruction of Bruckner Blvd./Expwy. Bridge and Bryant Avenue Pedestrian Bridge over active 4-Track Railroad Corridor. Assisted with planning, execution, and tracking of the following scopes of work, installation/removal of timber demolition shielding, demolition of three trusses, concrete deck and framing demolition, modification of bridge abutments, jacking of existing girders/framing, installation of new steel girders/framing, installation of haunch angles and precast deck, mixing and installation of Ultra-High-Performance-Concrete (UHPC), T-Wall Installation and Backfill, Wingwall Extension, installation of new concrete barrier (including slip forming and pre-cast barrier), roadway PCC form and placement, Lightweight Cellular Concrete FIll (LCCF) placement, asphalt placement, sidewalk, fencing, and MPT staging. Show less

    • Field Engineer 2
      • Jun 2019 - Mar 2020

      Project Value: ~$120 MillionField Engineer 2 at the Long Island Railroad (LIRR) 33rd Street Entrance Project, Construction of new entrance to LIRR Concourse of Penn Station from corner of 33rd Street and 7th Avenue with 3 Escalators and 1 Staircase and 4-story Glass Canopy. Work also included Responsibilities included execution and oversight of construction of temporary demolition/construction shield at B Level above LIRR concourse, oversight of architectural subcontractors and finishes for the relocated / temporary ticketing office for LIRR, and night shift supervision of street level slab and steel demolition and street level steel erection. Show less

    • Estimating Rotation
      • Mar 2019 - Jun 2019

      Estimating rotation role at the Skanska USA Civil Northeast Headquarters in East Elmhurst, NY. Participated in bids for Danbury Water Treatment Plant Upgrades and Hunts Point Access Improvements. Generated estimates for piping, trenching, and SOE.

    • EH&S Engineer Rotation
      • Nov 2018 - Mar 2019

      Project Value: $1.64 BillionProject Overview: Extension of existing Purple Line Subway in Los Angeles, California from Western Station, including excavation for Tunnel Boring Machine (TBM) transfer at Western Station, 3.92 Miles of twin tunnel excavation from Western Station to La Cienega Station using TBM, full excavation and fit out of new La Brea, Fairfax, and La Cienega Stations, and rail/systems for subway tunnel. Link for more info:https://www.metro.net/projects/westside/Conducted the New Hire Drug Screen and Orientation, presented the Underground and Self Rescuer Refresher Training, and maintained the organization, inspection, distribution, and tracking of the PPE/Harness/Safety Inventory. Went on safety walks at the different jobsites within the project. Assisted with incident investigation and reporting process, including root cause analysis. Completed over 10 different Skanska Learning Center Safety modules. Ran the 2:00 PM Daily Work Schedule meetings. Identified and corrected all discrepancies on brass tag log, modified and updating the tracking sheet for Safety Data Sheets (SDS). Created and posted Global Harmonization System (GHS) Labels on the chemical storage containers in the South yard. Made improvements to pedestrian walkway in South Yard. Show less

    • Assistant Superintendent Rotation
      • Jul 2018 - Nov 2018

      Project Value: ~$1.26 BillionProject Overview: Demolition inside James A. Farley and Annex Building, Renovation to create Train Hall and Concourse for Amtrak and LIRR customers, featuring installation of Glass Skylights, new Elevators and Escalators, and Roof MEP Structures.Links for more info:http://bit.ly/2BLApmWhttp://www.som.com/projects/moynihan_train_hallSpent 2 months on first shift and 2 months on second shift. Daily responsibilities included timecards, look-aheads, take-offs, quantity reporting, and coordination and follow up with engineers.On first shift, worked on team that supervises the upper floors and roof of the Farley and Annex buildings. Coordinated the demolition of concrete for framing installation of mechanical shafts. Was responsible for the housekeeping and tracking of cleanup on the floors of the buildings. Prepared and coordinated concrete pours including a 100 cy concrete pour of topping slab on the 2nd floor.On second shift, shared the responsibility of each crew on the job with the lead Superintendent. Show less

    • Project Manager Assistant Rotation
      • Mar 2018 - Nov 2018

      Project Value: ~$200 MillionProject Overview: Demolition of existing Marine Transfer Station and construction of new Marine Transfer Station. Includes construction of ramp from 91st Street to facility over the FDR Drive. Responsibilities included document control, ordering and tracking deliveries of tools and materials, following up with the 580 Ironworkers daily/weekly look-ahead. Took field measurements, performed takeoffs, wrote construction work plans, and took progress photos. Managed fire stopping punch list. Followed up with various subcontractors and vendors regarding submittals and RFIs for the release of their material for fabrication and delivery. Researched, acquired, and implemented requirements for DOT Permit, MPT Plan, Signage, Curb Details, etc. for street and sidewalk replacement Bulletin. Show less

    • Field Engineer Rotation
      • Nov 2017 - Mar 2018

      Project Value: ~$1.26 BillionProject Overview: Demolition inside James A. Farley and Annex Building, Renovation to create Train Hall and Concourse for Amtrak and LIRR customers, featuring installation of Glass Skylights, new Elevators and Escalators, and Roof MEP Structures.Links for more info:http://bit.ly/2BLApmWhttp://www.som.com/projects/moynihan_train_hallCompleted Quantity Takeoffs, Tracked and Reported Quantities, Time Card Management, Subcontractor Oversight, 2-Week and 4-Week Lookaheads Show less

    • Project Controls Rotation
      • Jul 2017 - Nov 2017

      Project Value: $149.7 MillionProject Overview: Renovation and Enhancement of 39th Avenue, 36th Avenue, Broadway, and 30th Avenue Subway Stations in Astoria, Queens on the N-W Line. Processed and Logged Budget Transfers, Prepared Monthly Owner Requisition, Assisted in generation of Quarterly Reports, Generated Weekly Cost Reports such as Labor Trend Sheets, Tracked T&M Tickets, Paid Subcontractor Invoices, Executed Change Order Modifications, Subcontractor Management in the field, and Tracked the Mockup Submittal Schedule Show less

    • United States
    • Higher Education
    • 700 & Above Employee
    • Assistant Track And Field Coach
      • Oct 2016 - May 2018

      Student Assistant Coach during 2016-2017 SeasonAssistant Coach during 2017-2018 SeasonCoached Division I Track and Field Athletes in the throwing events for indoor and outdoor seasons: Shot Put, Weight Throw, Discus, Javelin, and Hammer Throw.

    • Resident Assistant
      • Jun 2013 - May 2017

      Supervises residents, resolves conflicts, and manages complaints to maintain the community.Programs character development events comprised of ideas such as self-awareness, career and leadership development, and sense of belonging .

    • Intern
      • May 2016 - Apr 2017

      Project Value: West End Concourse: ~$220.0 Million Connecting Corridor: ~$020.0 Million Phase 1.5: $230 Million Project Overview: Extension and widening of Penn Station West End Concourse, addition of two new street entrances and concourses on 31st St. & 8th Ave. and 33rd St. & 8th Ave., and rehabilitation of existing Connecting Corridor from West End Concourse to Penn Station. Phase 1.5 includes Architectural Finish and MEP change orders to the West End Concourse. Assisted with the tracking of a variety of closeout procedural tasks including As-Built Drawings, Punch List Items, and Non Conformance Reports. Responsible for the scheduling, installation, and inspection testing of asphalt street pavement. Show less

    • Summer Intern
      • May 2015 - Aug 2015

      Project Value: $261.9 Million Project Overview: Track, Signal, Traction Power, and Communication Systems for 2nd Avenue Subway Construction. Joint Venture with LK Comstock. Managed T.O.T. Package documents and Material Receiving Log. Observed installation and construction of track and systems in all phases, including concrete pours, pulling of cable, and flash butt welding. Project Value: $261.9 Million Project Overview: Track, Signal, Traction Power, and Communication Systems for 2nd Avenue Subway Construction. Joint Venture with LK Comstock. Managed T.O.T. Package documents and Material Receiving Log. Observed installation and construction of track and systems in all phases, including concrete pours, pulling of cable, and flash butt welding.

    • Summer Intern
      • May 2014 - Aug 2014

      Project Value: $600.0 Million Project Overview: Two (2) Five Story towers with chemical, physics, environmental science, biology laboratories, office spaces, and a shared ground floor vivarium; TCO awarded. Managed a variety of closeout procedural tasks including MEP and Architectural punch listing. Observed completion of site work including concrete driveway and sidewalk pouring, sod placement, sprinkler system installment, stone wall laying, and additional landscaping. Project Value: $600.0 Million Project Overview: Two (2) Five Story towers with chemical, physics, environmental science, biology laboratories, office spaces, and a shared ground floor vivarium; TCO awarded. Managed a variety of closeout procedural tasks including MEP and Architectural punch listing. Observed completion of site work including concrete driveway and sidewalk pouring, sod placement, sprinkler system installment, stone wall laying, and additional landscaping.

Education

  • New Jersey Institute of Technology
    Master’s Degree, Structural Engineering
    2016 - 2017
  • New Jersey Institute of Technology
    Bachelor of Science (BS), Civil Engineering
    2012 - 2016
  • Old Bridge High School
    High School Diploma, Regular/General High School/Secondary Diploma Program
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now