RAHUL KUMAR
Sr. Technical Lead at GE Power- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
GE Power
-
United States
-
Electric Power Generation
-
700 & Above Employee
-
Sr. Technical Lead
-
May 2017 - Present
Execution & Tendering of Solar Mega Power Plants Execution & Tendering of Solar Mega Power Plants
-
-
-
ABB
-
Switzerland
-
Automation Machinery Manufacturing
-
700 & Above Employee
-
Technical Bid Lead
-
Mar 2016 - Present
Technical Bid Lead for ±320 kV, 2x1000 MW Voltage Source HVDC Converter project, Multimillion USD Project Technical Bid Lead for ±320 kV, 2x1000 MW Voltage Source HVDC Converter project, Multimillion USD Project
-
-
-
-
Technical Liaison (TL), NE to Agra 800kV HVDC Project & Manager- Engineering & Design- HVDC
-
Oct 2011 - Present
Contract Engineering for 800 kV, 6000 MW Multi terminal project from North-East to Agra * Technical Advisor and Lead support to Project Director and Project Manager ABB AB * Project Interface Management, responsible for Scope interface & interpretations, Conflict resolutions under JV, * Facilitating Quality Assurance function with Site Inspections, Testing of Major bought-out equipment on-shore & off-shore, Documentation flow process. * Project management & coordination among Supply Chain Management, Logistics, & Site management. * Reviewer for Technical solutions & sub-systems’ Interfaces etc.
-
-
-
-
Manager- Engineering & Design, Electrical Balance of Plant (EBoP)
-
Aug 2009 - Aug 2011
Engineering & Design Manager- Sub-stations (EBOP) associated with Generations * Successful Project engineering from Tendering to Commissioning for sub-stations associated with Thermal Power project, e.g. APRNL Jamshedpur, Facor Power Ltd. Bhadrak, ISMT Kurla, Beta CCPP Kashipur etc. * Winning Customer’s trust, confidence and satisfaction by informing right practices, and safe guarding their interest. * Leading a highly motivated Technical team known for quality and time bound deliveries
-
-
-
ABB
-
Switzerland
-
Automation Machinery Manufacturing
-
700 & Above Employee
-
Technical Specialist/ Manager-HVDC
-
Jun 2008 - Jul 2009
* Reliability & Availability of HVDC projects e.g. Rio-Madeira Bipole-1, Western Isle HVDC Light® etc, Project Lead for updation of RAM database based on DORs, & EFRs* Critically examining HVDC project details in view of Reliability & Availability aspects while fulfilling customer requirements. * Need based recommendation made to improve R & A in purview of Risk Vs optimum Project cost.* Assessment for reasonably sufficient commissioning spares & major equipments i.e. converter transformer, Smoothing reactor, Shunt Reactors etc.* Coordination among interdepartmental functionaries for requirement finalization
-
-
-
Bharat Heavy Electricals Limited
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Principal Project Engineer (PPE)
-
Aug 2003 - May 2008
System Design & Engineering Management Dealing Engineer (DE) for Ballia-Bhiwadi Bipole HVDC Project (a Consortium Agreement among BHEL, Siemens AG & Siemens India Ltd.) Principal Project Engineer (PPE) of 400 kV Bina, Khandwa & Rajgarh extn substations for M/s Powergrid under Sipat Stage-II Transmission system Transmission Business Technology Development Project Engineer (PE) for BHEL’s indigenous FACTS - On & off type 400 kV Controlled Shunt Reactor (CSR) for Karad & Dhule substation, M/s MSETCL. Task force member for addressing successful Ballia-Bhiwadi HVDC Technical proposal Part of team for addressing first ever 765 kV AIS substation in India in coordination with VATECH, Brazil associated with Sipat Super Thermal Power project, NTPC and later Seoni substation, Powergrid etc.Electrical System Studies Transient Study for BHEL supplied AC Circuit Breakers to BBHVDC Study state studies e.g. load flow, Short Circuit studies, Electro-Magnetic Transient studies for NTPC-Vindhyachal STPP, Koldam Hydro power, Korba TPS, EEPC Ethopia, PDO Oman, BESCPL Bhilai, JSPL Raigarh etc using Power system simulation softwares e.g. PSCAD/ EMTDC, Simpow, MATLAB etc.
-
-
-
Indian Institute of Technology, Roorkee
-
Higher Education
-
700 & Above Employee
-
Senior Research Fellow
-
Apr 2003 - Jul 2003
-CPRI sponsored project ‘Load Estimation in Electric Power Distribution System’ using Global Information System under grant no. CPR021EED -CPRI sponsored project ‘Load Estimation in Electric Power Distribution System’ using Global Information System under grant no. CPR021EED
-
-
Education
-
Indian Institute of Technology, Roorkee
Post Graduation, Power Systems -
Visvesvaraya National Institute of Technology
Graduation, Electronics & Power Engineering